Loading...
WS-18-3312t Miami Shores Vitiage f11 In Building Department _ 10050 NE 2 Ave Miami Shores FL 33138 `�TES�I�`-�\• �OR1D�' INSPECTION REQUESTS: (305)762-4949 or log on at hftps://bidg.msvfl.gov/energo%_prod/selfservice POST O N SITE must be received by 3:30pm WORK IS ALLOWED: MOND"THROUGH FRIDAY, 8:OOAM - 7:OOPM SATURDAY 8:OOAM - 6:OOPM. 132060 4�$�O NO WORK IS ALLOWED ON SUNDAYOR HOLIDAYS BUILDING AND ROOFING INSPECTIONS ARE DONE MONDAY THROUGH FRIDAY . NO INSPECTION WILL BE MADE UNLESS THE PERMIT CARD IS DISPLAYED AND HAS BEEN APPROVED PLANS ARE READILY AVAILABLE IT IS THE PERMIT APPLICANT'S RESPONSIBILITY TO ENSURE THAT WORK IS ACCESSIBLE AND FXPOSED FOR INSPECTION PURPOSES. NEITHER THE BUILDING OFFICIAL NOR THE CITY SHALL BE LIABLE FOR EXPENSE ENTAILED IN THE REMOVAL OR REPLACEMENT OF ANY MATERIAL REQUIRED TO ALLOW INSPECTION Owner's Name: POL ZAZADZE Owner's Phone: (305)790-2785 .lob Address: 1201 NE 96 ST Total Square Feet: 1,644 Miami Shores, FL 33138-23 total Job Valuation: $ 4,950.00 Contractor(s) Phone Address URBAN KO, INC. (305)487-2205 1800 SW 1 AVE 205, MIAMI, FL 33129 Description: REMOVE AND REPLACE BY IM SIDELINES 2 3-0 AT TIME OF " 'F�19�1d k WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE ,SOB SITE BEFORE THE FIRST INSPECTION. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE COMMENCING WORK OR RECORDING YOUR NOTICE OF COMMENCEMENT. Page 1 of 1 INSPECTION RECORD DATE I INSP Stemwall Slab Columns (1st Lift) Columns (2nd Lift) Tie Beam Truss/Rafters Bucks Interior Framing Insulation Ceiling Grid Firewall Wire Lath Pool Steel Pool Deck Final Pool Final Fence Screen Enclosure Driveway Driveway Base Tin Cap Roof in Progress Mop in Progress Final Roof Shutters Attachment Final Shutters Rails and Guardrails ADA compliance DOCUMENTS Soil Bearing Cert Soil Treatment Cert Floor Elevation Survey Reinf Unit Mas Cert Insulation Certificate Spot Survey .-Final Survey Truss Certification STRUCTURAL COMMENTS WINDOWS:DOORS INSPECTION DATE I INSP Attachment WORKSFINAL PUBLIC PECTION DATE INSP Favation FINAL ELECTRICAL INSPECTION DATE INSP Temporary Pole 30 Day Temporary Pool Bonding Pool Deck Bonding Pool Wet Niche Underground p Footer Ground Slab Wall Rough Ceiling Rough Rough Telephone Rough Telephone Final TV Rough TV Final Cable Rough Cable Final "Intercom Rough Intercom Final Alarm Rough Alarm Final Fire Alarm Rough Fire Alarm Final Service Work With ELECTRICAL COMMENTS INSPECTION JDATE' INSP Final Sprinkler Final Alarm INSPECTION DATE I INSP Rough Water Service 2nd Rough Top Out Fire Sprinklers Septic Tank Sewer Hook-up Roof Drains Gas LP Tank Well Lawn Sprinklers Main Drain Pool Piping Backflow Preventor Interceptor Catch Basins Condensate Drains HRS Final PLUMBING COMMENTS Mr -tor, F-1110, , INSPECTION DATE INSP Underground Pipe Rough Ventilation Rough Hood Rough Pressure Test Final Hood Final Ventilation Final Pool Heater Final Vacuum • MECHANICAL COMMENTS