WS-18-3312t
Miami Shores Vitiage
f11 In Building Department
_ 10050 NE 2 Ave
Miami Shores FL 33138
`�TES�I�`-�\•
�OR1D�'
INSPECTION REQUESTS: (305)762-4949 or log on at hftps://bidg.msvfl.gov/energo%_prod/selfservice POST O N SITE
must be received by 3:30pm
WORK IS ALLOWED: MOND"THROUGH FRIDAY, 8:OOAM - 7:OOPM
SATURDAY 8:OOAM - 6:OOPM. 132060 4�$�O
NO WORK IS ALLOWED ON SUNDAYOR HOLIDAYS
BUILDING AND ROOFING INSPECTIONS ARE DONE MONDAY THROUGH FRIDAY .
NO INSPECTION WILL BE MADE UNLESS THE PERMIT CARD IS DISPLAYED AND HAS BEEN APPROVED PLANS ARE
READILY AVAILABLE IT IS THE PERMIT APPLICANT'S RESPONSIBILITY TO ENSURE THAT WORK IS ACCESSIBLE AND
FXPOSED FOR INSPECTION PURPOSES. NEITHER THE BUILDING OFFICIAL NOR THE CITY SHALL BE LIABLE FOR
EXPENSE ENTAILED IN THE REMOVAL OR REPLACEMENT OF ANY MATERIAL REQUIRED TO ALLOW INSPECTION
Owner's Name: POL ZAZADZE Owner's Phone: (305)790-2785
.lob Address: 1201 NE 96 ST Total Square Feet: 1,644
Miami Shores, FL 33138-23
total Job Valuation: $ 4,950.00
Contractor(s) Phone Address
URBAN KO, INC. (305)487-2205 1800 SW 1 AVE 205, MIAMI, FL 33129
Description: REMOVE AND REPLACE BY IM
SIDELINES 2
3-0 AT TIME OF
" 'F�19�1d k
WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF
COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS
TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDED
AND POSTED ON THE ,SOB SITE BEFORE THE FIRST INSPECTION. IF YOU
INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN
ATTORNEY BEFORE COMMENCING WORK OR RECORDING YOUR NOTICE OF
COMMENCEMENT.
Page 1 of 1
INSPECTION RECORD
DATE I INSP
Stemwall
Slab
Columns (1st Lift)
Columns (2nd Lift)
Tie Beam
Truss/Rafters
Bucks
Interior Framing
Insulation
Ceiling Grid
Firewall
Wire Lath
Pool Steel
Pool Deck
Final Pool
Final Fence
Screen Enclosure
Driveway
Driveway Base
Tin Cap
Roof in Progress
Mop in Progress
Final Roof
Shutters Attachment
Final Shutters
Rails and Guardrails
ADA compliance
DOCUMENTS
Soil Bearing Cert
Soil Treatment Cert
Floor Elevation Survey
Reinf Unit Mas Cert
Insulation Certificate
Spot Survey
.-Final Survey
Truss Certification
STRUCTURAL COMMENTS
WINDOWS:DOORS
INSPECTION DATE I INSP
Attachment
WORKSFINAL
PUBLIC
PECTION DATE INSP
Favation
FINAL
ELECTRICAL
INSPECTION DATE INSP
Temporary Pole
30 Day Temporary
Pool Bonding
Pool Deck Bonding
Pool Wet Niche
Underground
p
Footer Ground
Slab
Wall Rough
Ceiling Rough
Rough
Telephone Rough
Telephone Final
TV Rough
TV Final
Cable Rough
Cable Final
"Intercom Rough
Intercom Final
Alarm Rough
Alarm Final
Fire Alarm Rough
Fire Alarm Final
Service Work With
ELECTRICAL COMMENTS
INSPECTION JDATE' INSP
Final Sprinkler
Final Alarm
INSPECTION DATE I INSP
Rough
Water Service
2nd Rough
Top Out
Fire Sprinklers
Septic Tank
Sewer Hook-up
Roof Drains
Gas
LP Tank
Well
Lawn Sprinklers
Main Drain
Pool Piping
Backflow Preventor
Interceptor
Catch Basins
Condensate Drains
HRS Final
PLUMBING COMMENTS
Mr -tor, F-1110, ,
INSPECTION DATE INSP
Underground Pipe
Rough
Ventilation Rough
Hood Rough
Pressure Test
Final Hood
Final Ventilation
Final Pool Heater
Final Vacuum
• MECHANICAL COMMENTS