Loading...
RC-18-424Certificate of Occupancy Miami Shores Village 10050 N.E. 2nd Ave, Miami Shores, Florida 33138 Tel: 305-795-2204 Fax: 305-756-8972 Building Inspection Department Description: New Single Family Home Permit Type Building (Residential) Bldg. Permit No. RC-2-18-424 Owner JOSE A SBARRA Contractor ARQUIGREEN CORP Subdivision/Project Date Issued 02/06/2019 Construction Type V-B Occupancy R-3 Type Square Footage 5,329.00 Flood Zone X Location If the building is located in a special flood hazard area documentation of the as -built lowest floor 128 NE 94 ST elevation or lowest horizontal structural member has been provided and is retained in the records of Miami Shores, FL 33138 Miami Shores Village. This certificate issued pursuant to the requirements of the Florida Building Code certifying that at the time of issuance this structure was in compliance with th s ordinances of the jurisdiction regulating building construction or use. Building Officials Approval Not Transferable POST IN A CONSPICUOUS PLACE ~� c Ismael Naranjo, CBO ': Z Miami Shores Village 10050 N.E-2nd Avenue Miami Shores, FL 33133-0000 Phone: (305)795-2204 Fax: (305)756-8972 rn Permit No. F\-2-18-424 Pemtif Type: Residential construction Work Class,ficafion: New issue Date: 5/7/207$ Expires: I iiO3/20 1 , INSPECTION REQUESTS: (305)762-4949 or Log on at https://bidg.miamishoresvilia-e.comlcap REQUESTS ARE ACCEPTED DURING 8:30AM - 3:30PM FOR THE FOLLOWING BUSINESS DAY. Requests must be received by 3 pm for following day inspections. �® Residential Construction Parcel #:1132060132980 Owner's Name: JOSE SBARRA Owner's Phone: (305)758-1169 .lob Address �.2_8 NE 94 Street Miami Shores FL 33138- Bond Number: Contractor(s) Phone `F ary Q.ontractor ARQUIGRF_EN CORP (305)778-5961 Yes Total Square Feet: 5329 Total Job Valuation: $ 379,050.00 s WORK IS ALLOWED: MONDAY THROUGH FRIDAY, 8:OOAM ,. 7:00PM. '. SATURDAY 8:00AM - 6:OOPM. NO WORK IS ALLOWED ON SUNDAY OR HOLIDAYS. BUILDING AND ROOFING INSPECTIONS ARE DONE MONDAY THROUGH FRIDAY. `e- e-1�fl/" , P4__� i;� NO INSPECTION WILL BE MADE UNLESS THE PERMIT CARD IS DISPLAYED AND HAS PEEN APPROVED PLANS ARE READLY AVAILABLE. ! T lS THE PEFRN11T APPLICANT'S RESPONSIBILITY TO ENSURE THAT WORK IS ACCESSIBL - .),ND EXPOSED FOR INSPECTION PURPOSES. NEITHER THE BUILDING OFFICIAL NOR THE CITY SHALL BE LIABLE FOR EXPENSE ENTAILED IN! THE REPIOVAL OR REPLACEMENT OF ANY MATERIAL R&_)UIRED TO ALLOW INSPECTION. WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PLYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE .SOB SITE BEFORE THE FIRST INSPECTION. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE COMMENCING WORD OR RECORDING YOUR NOTICE OF COMMENCEMENT. INSPECTION RECORD 1 64-5 qlc-uy/,� INSPECTION DATE INSP Foundation Stemwall Slab Z Columns (1st Lift) Columns (2nd Lift) Tie Beam Truss/Rafters Roof Sheathing Bucks Interior Framing Insulation Ceiling Grid Drywall (Firewail Wire Lath Pool Steel Pool Deck Final Pool Final Fence Screen Enclosure Driveway Driveway Base Tin Cap Roof in Progress Mop in Progress Final Roof Shutters Attachment Final Shutters Rails and Guardrails ADA compliance p ENV I Soil Bearing Cert Soil Treatment Cert Floor Elevation Survey Reinf Unit Mas Cert Insulation Certificate Spot. Survey Final Survey Truss Certification STRUCTURAL COMMENTS WINDOWS & DOORS FINAL IWMEff" PUBLIC WORKS FINAL ELECTRICAL -- Temporary Pole -� Irene slimly • Rough I. Myopowla-MR0110t� Intercorn FinalAlarm-- Rough -- . • 11 llrjyfilm�� FINALELECTRICAL �� • •' ��� Ir k ilk/�i �/ 'r` . INSPECTION DATE INSP Final Sprinkler Final Alarm r'J 9 (dyer <E�— PLUMBING INSPECTION DATE INSP Y Rough Water Service 2"d Rough c Top Out C Fire Sprinklers Septic Tank Sewer Hook-up Roof Drains Gas Well Lawn Sprinklers Main Drain Pool Piping Backflow Preventor Interceptor Catch Basins I Condensate Drains HRS Final r.y t F PLUMBING COMMENTS �p MECHANICAL INSPECTION E INSP Underground Pipe Rough •. Ventilation Rough Hood Rough _ Pressure Test Final Hood _ Final Ventilation Final Pool Heater Final Vacuum Z MECHANICAL MMENTS 9 14 ?I