DS-17-401 (2)INSPECTION RECORD
Permit NO. V S-2 - 17-401
Miami Shores Village
-- 9� 10050 N. E. 2nd Avenue
srtxr: uu�m
Miami Shores, FL 33138-0000
0' Rhone: (305)795-2204 Fax: (305)756-8972
�L0 RI
'b
INSPECTION REQUESTS: (3051762-4949 or Log on at
REQUESTS ARE ACCEPTED DURING 8:30 Ilk-- 3:30PM FOR THE FOLLOWING BUSINESS DAY.
Requests must be received by 3 pm for following day inspections.
Driveways/Sidewalks/Slabs Parcel #:1131010250100
_ _,
Owner's Name: ERIK SACCOMANI `- � - �, v Owner's Phone
Job Address. 1 N F - ,Total Square Feet: 100
Miami Shores FL - ,
Bond Number:
_ Total Job Valuation: $ 1,000.00
-r, �c,av��a%S'�z;+a .<ac,�,..aa Isv.=;ssm,.:.:�+, ,z. „�:a:.:.- asr+s, w'a .. . .,; s •>�,, Om, n . a.. ... , __.
WORK IS ALLOWED:
Phone Pcirrlar. A%- " 1(7ONDAY THROUGH FRIDAY, 8:OOAM - 7:OOPM.
Contractors ATURDAY 8:OOAM - 6:OOPM.
HOME OWNER Yes '° " O WORK IS ALLOWED ON SUNDAY OR HOLIDAYS.
BUILDING AND ROOFING INSPECTIONS ARE DONE
MONDAY THROUGH FRIDAY.
NO INSPECTION WILL BE MADE UNLESS THE PERMIT CARD IS DISPLAYED AND HAS BEEN APPROVED. PLANS ARE READLY AVAILABLE. IT IS
THE PERMIT APPLICANT'S RESPONSIBILITY TO ENSURE THAT WORK IS ACCESSIBLE AND EXPOSED FOR INSPECTION PURPOSES, NEITHER
THE BUILDING OFFICIAL NOR THE CITY SHALL BE LIABLE FOR EXPENSE ENTAILED IN THE REMOVAL OR REPLACEMENT OF ANY MATERIAL
REQUIRED TO ALLOW INSPECTION,
WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF
COMMENCEMENT MAY RESULT IN YOUR PAVING TWICE FOR IMPROVEMENTS
TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDED
AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU
INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN
ATTORNEY BEFORE COMMENCING WORK OR RECORDING YOUR NOTICE OF
COMMENCEMENT.
INSPECTION RECORD
INSPECTION
DATE
INSP
Foundation
Stemwali
Slab
Columns (1st Lift)
Columns (2nd Lift)
Tie Beam
Truss/Rafters
Roof Sheathing
Bucks
Windows/Doors
Interior Framing
Insulation
Ceiling Grid
Drywall
Frewall
Wire Lath
Pool Steel
Pool Deck
Final Pool
Final Fence
Screen Enclosure
Drivewn aye
Driveway Base
Tin Cap
Roof in Progress
Mop in Progress
Final Roof
Shutters Attachment
Final Shutters
Rails and Guardrails
ADA compliance
DIU ME S
Soil Bearing Cert
"I Treatment Cert
Floor Elevation Survey
Reinf Unit Mas Cert
Insulation Certificate
Spot Survey
Final Survey
Truss Certification
STRUCTURAL COMMENTS
INSPECTION
DATE INSP'
Zoning Final
ZONING COMMENTS
ELECTRICAL
INSPECTION
DATE
INSP
Temporary Pole
30 Day Temporary
Pool Bonding
Pool Deck Bonding
Pool Wet Niche
Underground
Footer Ground
Slab
Wall Rough
Ceiling Rough
Rough
Telephone Rough
Telephone Final
TV Rough
TV Final
Cable Rough
Cable Final
Intercom Rough
Intercom Final
Alarm Rough
Alarm Final
Fire Alarm Rough
Fire Alarm Final
Service Work With
ELECTRICAL COMMENTS
Final Sprinkler
Final Alarm
INSP
PLUMBING
INSPECTION
DATE
INSP
Rough
Water Service
2"d Rough
Top Out
Fire Sprinklers
Septic Tank
Sewer Hook-up
Roof Drains
Gas
LP Tank
Well
Lawn Sprinklers
Main Drain
Pool Piping
Backflow Preventor
Interceptor
Catch Basins
Condensate Drains
HRS Final
PLUMBING COMMENTS
MECHANICAL
INSPECTION DATE INSP
Underground Pipe
Rough
Ventilation Rough
Hood Rough
Pressure Test
Final Hood
Final Ventilation
Final Pool Heater
Final Vacuum
MECHANICAL COMMENTS