Loading...
RC-18-706 (2)10050 N.E. 2nd Ave, Miami Shores, Florida 33138 Tel: 305-795-2204 Fax: 305-756-8972 Description: INTERIOR RENOVATION KITCHEN AND MASTER BATH This project is not a substantial improvement. 10611 NE 11 AVE Miami Shores, FL 331382120 If the building is located in a special flood hazard area documentation of the as -built lowest floor elevation or lowest horizontal structural member has been provided and is retained in the records of Miami Shores Village. This certificate issued pursuant to the requirements of the Florida Building Code certifying that at the time of issuance this structure was in compliance with the various ordinances of the jurisdiction regulating building construction or use. Not Transferable POST IN A CONSPICUOUS PLACE INSPECTION RECORD Miami Shores Village 10050 N.E. 2nd Avenue Miami Shores, FL 33138-0000 Phone: (305)795-2204 Fax: (305)756-8972 POSTON SITE Permit NO. RC-3-18-706 Permit Type: Residential Construction Work Classification: AdditionlAlteration Issue Date: 6/4/2018 Expires: 1 2/0 1/ 201 8 INSPECTION REQUESTS: (305)762-4949 or Log on at https://bIdg.miamishoresvillage.com/cap REQUESTS ARE ACCEPTED DURING 8:30AM - 3:30PM FOR THE FOLLOWING BUSINESS DAY. Requests must be received by 3 pm for following day inspections. Residential Construction Owner's Name: STEPHEN LENSI Job Address: Bond Number: 3786 Contractor(s) Pho CIRCA BUILDERS INC (30 17,,71 Parcel #1122320280380 Owner's Phone: (860)490-6310 Total Square Feet: 500 Total Job Valuation: $ 25,000.00 WORK IS ALLOWED: MONDAY THROUGH FRIDAY, 8:OOAM - 7:OOPM. SATURDAY 8:OOAM - 6:OOPM. NO WORK IS ALLOWED ON SUNDAY OR HOLIDAYS. BUILDING AND ROOFING INSPECTIONS ARE DONE MONDAY THROUGH FRIDAY. 0)(4 a 0--v --)(C-c-fr`" %a/Lb r. ,paci 414,.7 NO INSPECTION WILL BE MADE UNLESS THE PERMIT CARD IS DISPLAYED AND HAS BEEN APPROVED. PLANS ARE READLY AVAILABLE. IT IS THE PERMIT APPLICANT'S RESPONSIBILITY TO ENSURE THAT WORK IS ACCESSIBLE AND EXPOSED FOR INSPECTION PURPOSES. NEITHER T: 'E PU;LDiNC OFFICIAL NOR THE CITY SHALL BE LIABLE FOR EXPENSE ENTAILED IN THE REMOVAL OR REPLACEMENT OF. ANY MATERIAL REQUIRED TO ALLOW INSPECTION. WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS O YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE COMMENCING WORK OR RECORDING YOUR NOTICE OF COMMENCEMENT. INSPECTION RECORD STRUCTURAL INSPECTION DATE INSP Foundation Stemwall Slab Columns (1st Lift) Columns (2nd Lift) Tie Beam Truss/Rafters Roof Sheathing Bucks Interior Framing Insulation Ceiling Grid Drywall Firewall Wire Lath Pool Steel Pool Deck Final Pool Final Fence Screen Enclosure Driveway Driveway Base Tin Cap Roof in Progress Mop in Progress Final Roof Shutters Attachment Final Shutters Rails and Guardrails ADA compliance IMINI i71L DOCUMENTS Soil Bearing Cert Soil Treatment Cert Floor Elevation Survey Reinf Unit Mas Cert Insulation Certificate Spot Survey Final Survey Truss Certification STRUCTURAL COMMENTS WINDOWS INSPECTION & DOORS DATE INSP Attachment FINAL PUBLIC WORKS INSPECTION DATE INSP Excavation FINAL ELECTRICAL , INSPECTION DATE INSP Temporary Pole 30 Day Temporary Pool Bonding Pool Deck Bonding Pool Wet Niche Underground Footer Ground Slab Wall Rough Ceiling gh Rou j) d `L'SA �J 4 Tel one Rough Telephone Final TV Rough TV Final Cable Rough Cable Final Intercom Rough Intercom Final Alarm Rough Alarm Final Fire Alarm Rough Fire Alarm Final Service Work With tOL.Ot 1 FINAL ELECTRICAL `4 ■ , MENTS 1-4-R.E ..; a -yr C.Prq>" INSPECTION FIRE DATE INSP Final Sprinkler Final Alarm FINAL rs PLUMBING INSPECTION DATE INSP Rough t „ , Z,li4/ -c7 Water Service 2nd Rough cr/11/3 <. > Top Out Fire Sprinklers Septic Tank Sewer Hook-up Roof Drains Gas LP Tank Well Lawn Sprinklers Main Drain Pool Piping Backflow Preventor Interceptor Catch Basins Condensate Drains HRS Final FINAL // I)A3/,(� COMMENTS —a--- PLUMBING 1 MECHANICAL INSPECTION DATE INSP Underground Pipe Rough ! If i.O 1 i Ventilation Rough Hood Rough Pressure Test Final Hood Final Ventilation Final Pool Heater Final Vacuum FINAL MECHANICAL , COMMENTS