WS-18-328 (2)POST ON SITE
INSPECTION RECORD
' SN,ORFS
It
��ORiDp`/
Miami Shores Village
10050 N.E. 2nd Avenue
Miami Shores, FL 33138-0000
Phone: (305)79'5-2204 Fax: (305)756-8972
Perm/tWO. YYS-2 188328
Permit Type: Windows/Shutters
Work Classification. Wilndow/Doan. Replacement
Issue Date: 2/8/2018
Expires: 0 8/0 7/2 01 8
INSPECTION REQUESTS: (305)762-4949 or Log on at https://bldg.miamishoresvillage:conUcap
REQUESTS ARE ACCEPTED DURING'8:30AM - 3:30PM FOR ITHE FOLLOWING BUSINESS DAY.
Requests must be received by 3 pm for following day inspections.
Windows/Shutters
Parcel #:1132060142130
Owner's Name:
Job Address: 731 NE 95 Street
Miami Shores. FL
Bond Number:
Contractor(s)
DILBERT ENTERPRISES, INC
a �. ihiinttl
ttSPEtT
Owner's Phone: 1(305)796-5460
Total Square Feet: 0
Total Job Valuation: $ 100.00
WORK IS ALLOWED:
MONDAY THROUGH FRIDAY, 8:OOAM - 7:OOPM.
SATURDAY 8:00AM - 6:OOPM.
NO WORK IS ALLOWED ON SUNDAY OR HOLIDAYS.
BUILDING AND ROOFING INSPECTIONS ARE DONE
MONDAY THROUGH FRIDAY.
NO INSPECTION WILL BE MADE UNLESS THE PERMIT CARD IS DISPLAYED AND HAS BEEN APPROVED. PLANS ARE READLY AVAILABLE. IT IS
THE PERMIT APPLICANTS RESPONSIBILITY TO ENSURE THAT WORK IS ACCESSIBLE AND EXPOSED FOR INSPECTION PURPOSES. NEITHER
THE BUILDING OFFICIAL NOR THE CITY SHALL BE LIABLE FOR EXPENSE ENTAILED IN THE -REMOVAL OR REPLACEMENT OF ANY MATERIAL
REQUIRED TO ALLOW INSPECTION.
WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF
COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS
TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDED
AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU
INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN
ATTORNEY BEFORE COMMENCING WORK OR RECORDING YOUR NOTICE OF
COMMENCEMENT.
INSPECTION,
STRUCTURAL
DATE
INSPECTION RECORD
INSP
Foundation
Stemwall
Slab
Columns (1st Lift)
Columns (2nd Lift)
Tie Beam
Truss/Rafters
Roof Sheathing
Bucks
Interior Framing
Insulation
Ceiling Grid
Drywall
Firewall
Wire Lath
Pool Steel
Pool Deck,
Final Poo!
Final Fence
Screen Enclosure
Driveway
Driveway Base
Tin Cap
Roof in Progress
Mop in Progress
Final Roof
Shutters Attachment
Final Shutters
Rails and Guardrails
ADA compliance
ENTS
Soil Bearing Cert
Soil Treatment Cent
FloorElevation Survey
3
Reinf Unit Mas Cert
Insulation Certificate
Spot Survey
Final Survey
Truss •Certification
`STRUCTURAL COMMENTS
WINDOWS & DOORS
INSPECTION DATE + SD
Attachment P 1
Id'
FINAL
''i' 1
PUBLIC WORKS
INSPECTION DATE
INSP
Excavation
FINAL
ELECTRICAL
INSPECTION
DATE
INSP
Temporary Pole
30 Day Temporary
Pool Bonding
Pool Deck Bonding
Pool Wet Niche
Underground
Footer Ground
Slab -
—_
Wall Rough
Ceiling Rough
Rough
Telephone Rough
, Telephone Final
TV Rough
TV Final
Cable Rough
Cable Final
Intercom Rough
Intercom rFinal
Alarm Rough
Alarm Final
Fire Alarm Rough
Fire Alarm Final
Service Work With
NINJIMINIIIIIM
_
ELECTRICAL COMMENTS
INSPECTION
FIRE
DATE INSP
Final Sprinkler
Final Alarm
FINAL
INSPECTION
PLUMBING
DATE
INSP
Rough
Water Service
2nd Rough
1
Top Out -
Fire Sprinklers
Septic Tank
Sewer Hook-up
Roof Drains
Gas
LP Tank
Well
Lawn Sprinklers
Main Drain
Pool Piping
Backflow Preventor
Interceptor
Catch Basins
Condensate Drains
HRS Final
FINAL
PLUMBING COMMENTS
MECHANICAL
INSPECTION
DATE
INSP
Underground Pipe
Rough
Ventilation,F,tough.t
Hood Rough
Pressure. Test
Final Hood
Final Ventilation
Final Pool Heater
Final Vacuum
FINAL
MECHANICAL COMMENTS