DEMO-17-1935 (2)INSPECTION RECORD
,POST ON SITE
ermit'NO.DEM0-7=17=1935
$oRrs
Nlianii Shores Village
10050 N.E. 2nd Avenue
Miami'Shores, FL33138-0000
;Ph6he: (305)795-2204 Fax: (305)756-8972
issue Date: 8/16/2017,°
Penrrit,Type: Demolition
Work Classification: Building
Expires: 02/12/2018
INSPECTION BEQUESTS: (305)76224949:or Log on at'https.//bIdg.miamishoresvillage.com/cap
REQUESTS ARE ACCEPTED DURING 8:30AM - 3:30PM FOR THE FOLLOWING BUSINESS DAY.
Requests must be received by 3 pm for following day inspections.
Demolition
Parce14:1132060.142130
Owner's Name:
Job Address: 731 NE 95 St
Miami Shores
Bond Number:
DILBERT`ENTERPRISES, INC
wa w s� rr.J ► r* Ar
Dim c4)
Owner's Phone: (305)796-5460
Total Square Feet: 0
Total Job Valuation: $ 1,500.00
WORK IS ALLOWED:
MONDAY THROUGH FRIDAY, 8:OOAM--•7i00PM.
SATURDAY 8:6OA1V1 - 6:OO141.
NO WORK IS ALLOWED ON SUNDAY OR HOLIDAYS.
BUILDING AND ROOFING INSPECTIONS ARE,DONE
MONDAY THROUGH FRIDAY.
NO INSPECTION WILL BE MADE UNLESS THE PERMIT CARD IS DISPLAYED AND HAS BEEN APPROVED. PLANS ARE READLY AVAILABLE. IT IS
THE PERMIT APPLICANT'S RESPONSIBILITY TO ENSURE THAT WORK IS ACCESSIBLE AND EXPOSED FOR INSPECTION PURPOSES. NEITHER
THE BUILDING OFFICIAL NOR THE CITY SHALL BE LIABLE FOR EXPENSE ENTAILED IN THE REMOVAL OR REPLACEMENT OF ANY MATERIAL
REQUIRED TO ALLOW INSPECTION.
WARNING TO OWNER: YOUR FAILURE TO " RECORD A NOTICE OF
COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS
TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDED
AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU
-,INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN
- ATTORNEY BEFORE COMMENCING WORK OR RECORDING YOUR NOTICE .OF
COMMENCEMENT.
INSPECTION
INSPECTION RECORD
STRUCTURAL
DATE ; INSP
Foundation
Stemwall
Slab
Columns'(1st Lift)
Colurn`ns (2nd Lift)
Tie Beam
Truss%Rafters
Roof Sheathing
Bucks
Interior Framing
Insulation
Ceiling Grid
Drywall
Firewall
Wire Lath
Pool Steel
Pool Deck
Final Pool
Final Fence
Screen Enclosure
Driveway
Driveway Base
Tin Cap
Roof in Progress
Mop in Progress
Final Roof
Shutters Attachment
Final Shutters
Rails and Guardrails
ADA corripllan e
Soil Bearing Cert
Soil Treatment Cert "! _
rioor Eievation Survey
1Reinf Unit Mas Cert
Insulation Certificate
Spot Survey
Final Survey
Truss Certification
STRUCTURAL COMMENTS
WINDOWS & DOORS
INSPECTION
Attachment
FINAL
DATE
INSP
MEN
PUBLIC WORKS
INSPECTION
Excavation
FINAL
DATE
INSP
ELECTRICAL
INSPECTION
DATE
INSP
Temporary -Pole
30 Day Temporary
Pool Bonding
Pool Deck Bonding
Pool Wet Niche
Underground
Footer Ground
Slab
Wall Rough
Ceiling' Rough
Rough
Telephone Rough
Telephone Final
TV Rough
TV Final
Cable Rough
Cable,Final
Interco—m Rough
intercom Final
Alarm Rough
Alarm Final
Fire Alarm Roug
Fire Alarm Fir}
Service`Wor�W
INSPECTION
FIRE
, DATE INSP
Final Sprinkler
Final Alarm
FINAL
__PLUMBING _
INSPECTION
DATE
INSP._
Rough
Water Service
2nd Rough
Top Out
Fire Sprinklers
Septic Tank
Sewer Hook-up
Roof Drains
Gas
'LP Tank
Well
Lawn Sprinklers,
Main Drain
Pool Piping
Backflow Preventor
Interceptor
Catch Basins
Condensate Drains
HRS Final
FINAL
PLUMBING COMM TS, ,.•
MECHANICAL
INSPECTION
DATE
INSP
Underground Pipe
Rough,
Ventilation Rough
Hood Rough
Pressure Test
Final Hood
rinal Ventilation
Final Pool Heater
Final Vacuum
a
FINAL
MECHANICAL COMMENTS