Loading...
DEMO-17-1935 (2)INSPECTION RECORD ,POST ON SITE ermit'NO.DEM0-7=17=1935 $oRrs Nlianii Shores Village 10050 N.E. 2nd Avenue Miami'Shores, FL33138-0000 ;Ph6he: (305)795-2204 Fax: (305)756-8972 issue Date: 8/16/2017,° Penrrit,Type: Demolition Work Classification: Building Expires: 02/12/2018 INSPECTION BEQUESTS: (305)76224949:or Log on at'https.//bIdg.miamishoresvillage.com/cap REQUESTS ARE ACCEPTED DURING 8:30AM - 3:30PM FOR THE FOLLOWING BUSINESS DAY. Requests must be received by 3 pm for following day inspections. Demolition Parce14:1132060.142130 Owner's Name: Job Address: 731 NE 95 St Miami Shores Bond Number: DILBERT`ENTERPRISES, INC wa w s� rr.J ► r* Ar Dim c4) Owner's Phone: (305)796-5460 Total Square Feet: 0 Total Job Valuation: $ 1,500.00 WORK IS ALLOWED: MONDAY THROUGH FRIDAY, 8:OOAM--•7i00PM. SATURDAY 8:6OA1V1 - 6:OO141. NO WORK IS ALLOWED ON SUNDAY OR HOLIDAYS. BUILDING AND ROOFING INSPECTIONS ARE,DONE MONDAY THROUGH FRIDAY. NO INSPECTION WILL BE MADE UNLESS THE PERMIT CARD IS DISPLAYED AND HAS BEEN APPROVED. PLANS ARE READLY AVAILABLE. IT IS THE PERMIT APPLICANT'S RESPONSIBILITY TO ENSURE THAT WORK IS ACCESSIBLE AND EXPOSED FOR INSPECTION PURPOSES. NEITHER THE BUILDING OFFICIAL NOR THE CITY SHALL BE LIABLE FOR EXPENSE ENTAILED IN THE REMOVAL OR REPLACEMENT OF ANY MATERIAL REQUIRED TO ALLOW INSPECTION. WARNING TO OWNER: YOUR FAILURE TO " RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU -,INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN - ATTORNEY BEFORE COMMENCING WORK OR RECORDING YOUR NOTICE .OF COMMENCEMENT. INSPECTION INSPECTION RECORD STRUCTURAL DATE ; INSP Foundation Stemwall Slab Columns'(1st Lift) Colurn`ns (2nd Lift) Tie Beam Truss%Rafters Roof Sheathing Bucks Interior Framing Insulation Ceiling Grid Drywall Firewall Wire Lath Pool Steel Pool Deck Final Pool Final Fence Screen Enclosure Driveway Driveway Base Tin Cap Roof in Progress Mop in Progress Final Roof Shutters Attachment Final Shutters Rails and Guardrails ADA corripllan e Soil Bearing Cert Soil Treatment Cert "! _ rioor Eievation Survey 1Reinf Unit Mas Cert Insulation Certificate Spot Survey Final Survey Truss Certification STRUCTURAL COMMENTS WINDOWS & DOORS INSPECTION Attachment FINAL DATE INSP MEN PUBLIC WORKS INSPECTION Excavation FINAL DATE INSP ELECTRICAL INSPECTION DATE INSP Temporary -Pole 30 Day Temporary Pool Bonding Pool Deck Bonding Pool Wet Niche Underground Footer Ground Slab Wall Rough Ceiling' Rough Rough Telephone Rough Telephone Final TV Rough TV Final Cable Rough Cable,Final Interco—m Rough intercom Final Alarm Rough Alarm Final Fire Alarm Roug Fire Alarm Fir} Service`Wor�W INSPECTION FIRE , DATE INSP Final Sprinkler Final Alarm FINAL __PLUMBING _ INSPECTION DATE INSP._ Rough Water Service 2nd Rough Top Out Fire Sprinklers Septic Tank Sewer Hook-up Roof Drains Gas 'LP Tank Well Lawn Sprinklers, Main Drain Pool Piping Backflow Preventor Interceptor Catch Basins Condensate Drains HRS Final FINAL PLUMBING COMM TS, ,.• MECHANICAL INSPECTION DATE INSP Underground Pipe Rough, Ventilation Rough Hood Rough Pressure Test Final Hood rinal Ventilation Final Pool Heater Final Vacuum a FINAL MECHANICAL COMMENTS