DS-17-1239Miami Shores Village
10050 N.E. 2nd Avenue NE
Miami Shores, FL 33138-0000
Phone: (305)795-2204
Project Address
mi
Permit Na: DS-5-17-1239
Permit Type: Driveways/Sidewalks/Slabs
Work Classification: AdditionlAlteration
Permit Status: APPROVED
Issue Date: 11/13/2017
Expiration:' 05/12/2018
Parcel Number
Applicant
1070 NE 93 Street
Miami Shores, FL 33138-2932
1132050160010
Block: Lot:
ALFONSO DEL CASTILLO
Owner Information
Address
Phone
Cell
ALFONSO DEL CASTILLO
1051 NE 92 Street
MIAMI SHORES FL'33138-
(305)613-5552
1051 NE 92 Street
MIAMI SHORES FL 33138-
Contractor(s)
HOME OWNER
Phone
Cell Phone
Valuation:
Total Sq Feet:
$ 6,000.00
920
Approved: In Review
Comments:
Date Approved: : In Review
Date Denied:
Type of Work: REMOVE THE OLD AND BUILD THE NEW
Bond Return :
Scanning: 5
Additional Info: REMOVE THE OLD AND BUILD THE
Classification: Residential
Fees Due
CCF
DBPR Fee
DCA Fee
Education Surcharge
Notary Fee
Permit Fee
Scanning Fee
Technology Fee
Total:
Amount
$3.60
$2.00
$2.00
$1.20
$5.00
$125.00
$15.00
$4.80
$158.60
Pay Date Pay Type
Invoice # DS-5-17-63918
11/13/2017 Credit Card
05/05/2017 Credit Card
Amt Paid Amt Due
$ 108.60 $ 50.00
$ 50.00 $ 0.00
Available Inspections:
Inspection Type:
Final
Foundation
Review Planning
Review Building
In consideration of the issuance to me of this permit, I agree to perform the work covered hereunder in compliance with all ordinances and regulations
pertaining thereto and in strict conformity with the plans, drawings, statements or specifications submitted to the proper authorities of Miami Shores Village. In
accepting this permit 1 . --ume responsibility for all work done by either myself, my agent, servants, or employes. 1 understand that separate permits are
required for ELECTRIC PLUMBING, MECHANICAL, WINDOWS, DOORS, ROOFING and SWIMMING POOL work.
OWNERS AFFIDAVIT
•construction and zoni
cert
at all the foregoing information is accurate and that all work will be done in compliance with all applicable laws regulating
ermore, I authorize the above -named contractor to do the work stated.
Auth. • i ' ature: Owner / Applicant /
Buildin • D - artment Copy
Contractor / Agent
November 13, 2017
Date
November 13, 2017 1
BUILDING
PERMIT APPLICATION
❑ BUILDING ❑ ELECTRIC
❑PLUMBING ❑ MECHANICAL
Miami Shores Village
Building Department
10050 N.E.2nd Avenue, Miami Shores, Florida 33138
Tel: (305) 795-2204 Fax: (305) 756-8972
INSPECTION LINE PHONE NUMBER: (305) 762-4949
❑ ROOFING
'ED
MA 5 2017
/14t
FBC 20t4 Sth
Master Permit No.bS t 1— t 2.39
Sub Permit No.
❑ REVISION ❑ EXTENSION ❑RENEWAL
❑ PUBLIC WORKS ❑ CHANGE OF . ❑ CANCELLATION ❑ SHOP
CONTRACTOR DRAWINGS
rd
JOB ADDRESS: /0 7o wt 943 cST
City: Miami Shores
County: Miami Dade
zip: 3313 8
Folio/Parcel#: // - 3205 - O/6 - Oo/ C, Is the Building Historically Designated: Yes NO
Occupancy Type: Load: Construction Type:
Flood Zone:
BFE: FFE:
OWNER: Name (Fee Simple Titleholder): A t- 'VS 7 Zx2 G/+ S T/C_� 0 Phone#: 3L 3988v7�j
rci
Address: AO70 NE 72 SST
City: /N / A VIA / S1-18/2 ES State: {Z Zip• S 1 3S
Tenant/Lessee Name: Phone#:
Email: Oc. c t S
as h'I10G
CONTRACTOR: Company Name: Phone#:
Address:
,se_K(Ara .ne,&
Evan !ate t • COU.L_
Hn M F o
City: State: Zip:
Qualifier Name: Phone#:
State Certification or Registration #: Certificate of Competency #:
DESIGNER: Architect/Engineer: Phone#:
Address: City: State:
Value of Work for this Permit: $ Square/Linear Footage of Work:'\
Type of Work: ❑ Addition ❑ Alteration
❑ New ❑ Repair/Replace
Description of Work: /F o VPr 7Ojfe (NZ ''vE AIN/ ed /LT 7?
?2t a AWOL lc ' -. c)e-- .
q2
Zip:
Ti Demolition
/?V4/
Specify color of color thru tile:
Submittal Fee $ Pc S Permit Fee $ 1 ZS • CO CCF $ 3 • GO CO/CC $ X
Scanning Fee $ , (S ' CO Radon Fee $ : " r� DBPR $ 2- ` CZ Notary $ - 00
Technology Fee $ : -Training/Education Fee $ (" 2-� Double Fee $ 0
Structural Reviews $ ( _ Bond $-) - - 1 z q (
TOTAL FEE NOW DUE $ `OH . GO
(Revised02/24/2014)
Bonding Company's Name (if applicable)
Bonding Company's Address
City State Zip
Mortgage Lender's Name (if applicable)
Mortgage Lender's Address
City _ State Zip
Application is hereby made to obtain a permit to do the work and installations as indicated. I certify that no work or installation has
commenced prior to the issuance of a permit and that all work will be performed to meet the standards of all laws regulating
construction in this jurisdiction. I understand that a separate permit must be secured for ELECTRIC, PLUMBING, SIGNS, POOLS,
FURNACES, BOILERS, HEATERS, TANKS, AIR CONDITIONERS, ETC
OWNER'S AFFIDAVIT: I certify that all the foregoing information is accurate and that all work will be done in compliance with all
applicable laws regulating construction and zoning.
"WARNIN&TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY
RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO 'YOUR PROPERTY. IF YOU INTEND
TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING
YOUR NOTICE OF COMMENCEMENT."
Notice to Applicant: As a condition to the issuance of a building permit with an estimated value exceeding $2500, the applicant must
promise in good faith that a copy of the notice of commencement and construction lien law brochure will be delivered to theperson
whose property is subject to attachment. Also, a certified copy of the recorded notice of commencement must be posted at the job site
for the first inspection which occurs seven (7) days after the building permit is issued. In the absence of such posted notice, the
inspection will not be approved and a reinspection fee will be charged. _
Signature
Signature
or AGENT CONTRACTOR
The foregoing instrument was acknowledged before me this The foregoing instrument was acknowledged before me this
.D\ IN day of MCI , 20 V1 , by day of , 20 , by
-AAFCr$OCC154A who is personally known to , who is personally known to
me or who has produced D1 ;vet as me or who has produced as
identification and who did t
NOTARY P
Sign:
Print:
Seal:
t rd iYPRI 'aJ ,
Y
e ,,, M • ISSION # FF 4031
•.: ,;pper EXPIRES: March 25, 2019
Bonded 'Mu Notary Public Undenwiter;
APPROVED BY
identification and who did take an oath.
NOTARY PUBLIC:
Sign:
f
Print:
Seal:
i / Plans Examiner ' / // / 2 Zoning
Structural Review Clerk
(Revised02/24/2014)
Miami Shores Village
Building Department
10050 N.E.2nd Avenue
Miami Shores, Florida 33138
Tel: (305) 795.2204
Fax: (305) 756.8972
OWNER BUILDER DISCLOSURE STATEMENT
NAME: 4-LFO/VSO ,pEZ, L,4ST/j. 4 DATE: 011 % 25/ )7
ADDRESS: /070 NE g3rJs, M/AUK./ SHOZCJ f F'c. 33I33
Do hereby petition the Village of Miami Shores to act as my own contractor pursuant to the laws of the State of Florida, F.S 489.103(7). And I have
read and understood the following disclosure statement, which entitles me to work as my own contractor; I further understand that I as the owner
must appear in person to complete all applications.
State Law requires construction to be done by a licensed contractor. You have applied for a permit under an exception to the law. The exemption
allows you, as the owner of your property, to act as your own contractor even though you do not have a license. You must supervise the
construction yourself. You may build or improve a one -family or two-family residence. You may also build or improve a commercial building at a
cost of $25,000.00 or less (The new form states 75,000). The building must be for your own use and occupancy. It may not be built for sale or
lease. If you sell or lease a building you have built yourself within one year after the construction is complete, the law will presume that you built
for sale or lease, which is a violation of this exemption. You may not hire anunlicensed person as a contractor. It is your responsibility to make
sure the people employed by you have licenses required by'state law and by county or municipal licensing ordinances. Any person working on
your building who is not licensed must work under your supervision and must be employed by you, which means that you must deduct F.I.C.A and
with -holdings tax and provide workers' compensation for that employee, all as prescribed by law. Your construction must comply with all
applicable laws, ordinances, buildings codes and zoning regulations.
Please read and initial each paragraph.
1. I understand that state law requires construction to be done by a licensed contractor and have applied for an owner -builder permit under an
exemption from the law. The exemption specifies that I, as the owner of the property listed, may act as my own contractor with certain
restrictions even though I do not have a license.
Initial / -
2. I understand that building permits are not required to be signed by a property owner unless he or she is responsible for the construction and
is not hiring a licensed contractor to assume responsibility.
Initial /T C
3. I understand that, as an owner builder, I am the responsible party of record on a permit. I understand that I may protect myself from potential
financial risk by hiring a licensed contractor and having the permit filed in his or her name instead of my own name. I also understand that the
contractor is required by law to be licensed in Florida and to list his or license numbers on permits and contracts.
Initial
4. I understand that I may build or improve a one family or two-family residence or a farm outbuilding. I may also build or improve a commercial
building if the costs do not exceed $75,000. The building or residence must be for my use or occupancy. It may not be built or substantially
improved for sale or lease. If a building or residence that I have built or substantially improved myself is sold or leased within 1 year after the
construction is complete, the law will presume that 1 built or substantially improved it for sale or lease, which violates the exemption.
Initial /TC
5. I understand that, as the owner -builder, 1 must provide direct, onsite supervision of the construction.
Initial /4
6. I understand that I may not hire an unlicensed person to act as my contractor or to supervise persons working on my building or residence. It
is my responsibility to ensure that the persons whom I employ have the license required by law and by county or municipal ordinance.
Initial /J K...
At
7. I understand that it is frequent practices of unlicensed persons to have the property owner obtain an owner -builder permit that erroneously
implies that the property owner is providing his or her own labor and materials. I, as an owner -builder, may be held liable and subjected to
serious financial risk for any injuries sustained by an unlicensed person or his or employees while working on my property. My homeowner's
insurance may not provide coverage for those injuries. I am willfully acting as an owner -builder and am aware of the limits of my insurance
coverage for injuries to workers on my property.
Initial AC
8. I understand that I may not delegate the responsibility for supervising work to be a licensed contractor who is not licenses to perform the
work being done. Any person working on my building who is not licensed must work under my direct supervision and must be employed by
me, which means that 1 must comply with laws requiring the withholding of federal income tax and social security contributions under the
Federal Insurance Contributions Act (FICA) and must provide workers compensation for the employee. I understand that my failure to follow
these may subject to serious financial risk.
Initial
9. I agree that, as the party legally and financially responsible for this proposed Construction activity, I will abide by all applicable laws and
requirement that govern owner -builders as well as employers. I also understand that the
Construction must comply with all applicable laws, ordinances, building codes, and zoning regulations.. /
Initial (i
10. I understand that I may obtain more information regarding my obligations as an employer from the Internal Revenue Service, the United States
Small Business Administration, and the Florida Department of Revenues. I also understand that I may contact the Florida Construction Industry
Licensing Board at 850.487.1395 or http://www.myfloridalicense.com/dbpr/pro/cilb/index.html
Initial /7 C.-
11. I am aware of, and consent to; an owner -builder building permit applied for in my name and understands that I am the party
legally and financially responsible for the proposed construction activity at the following address:
/a 70 Ai( 9grcl
Initial
12. I agree to notify Miami Shores Village immediately of any additions, deletions, or changes to any of the information that I have provided on
this disclosure.
Initial AC -
Licensed contractors are regulated by laws designed to protect the public. If you contract with a person who does not have a license, the
Constr4uction Industry Licensing Board and Department of Business and Professional Regulation may be unable to assist you with any financial
loss that you sustain as a result of contractor may be in civil court. It is also important for you to understand that, if an unlicensed contractor or
employee of an individual or firm is injured while working on your property, you may be held liable for damages. If you obtain an owner -builder
permit and wish to hire a licensed contractor, you will be responsible for verifying whether the contractor is properly licensed and the status of
the contractor's workers compensation coverage.
Before a building permit can be issued, this disclosure statement must be completed and signed by the property owner and returned to the local
permitting agency responsible for issuing the permit. A copy of the property owner's driver license, the notarized signature of the property
owner, or other type of verification acceptable to the local permitting agency is required when the permit is issued.
Was acknowledged before me this .Z c5 day of 419A L , 20 / 7
By Pt\c(*) So E - \s
who was personally known to me or who has
Produced there ic- ► e or Drivu UO t 'e
OWNER
ntification.
4044. YANADY PRIETO
;,_- MY COMMISSION # FF 214031
ljL ' EXPIRES: March 25 2019
'•?„Rt 4"P Bonded Thni Notary Public Underwriters
i
Miami Shores Village
Building Department
10050 N.E.2nd Avenue
Miami Shores, Florida 33138
Tel: (305) 795.2204
Fax: (305) 756.8972
OWNER BUILDER DISCLOSURE STATEMENT
NAME: AL-FONsa j1 CAST/1 -O DATE: 04/u25i77
ADDRESS: /070 Ne- %3rd Sr Ml.4Wt/ SicKeS Fr 138
Do hereby petition the Village of Miami Shores to act as my own contractor pursuant to the laws of the State of Florida, F.S 489.103(7). And I have
read and understood the following disclosure statement, which entitles me to work as my own contractor; I further understand that I as the owner
must appear in person to complete all applications.
State Law requires construction to be done by a licensed contractor. You have applied for a permit under an exception to the law. The exemption
allows you, as the owner of your property, to act as your own contractor even though you do not have a license. You must supervise the
construction yourself. You may build or improve a one -family or two-family residence. You may also build or improve a commercial building at a
cost of $25,000.00 or less (The new form states 75,000). The building must be for your own use and occupancy. It may not be built for sale or
lease. If you sell or lease a building you have built yourself within one year after the construction is complete, the law will presume that you built
for sale or lease, which is a violation of this exemption. You may not hire anunlicensed personas a contractor. It is your responsibility to make
sure the people employed by you have licenses required by state law and by county or municipal licensing ordinances. Any person working on
your building who is not licensed must work under your supervision and must be employed by you, which means that you must deduct F.I.C.A and
with -holdings tax and provide workers' compensation for that employee, all as prescribed by law. Your construction must comply with all
applicable laws, ordinances, buildings codes and zoning regulations.
Please read and initial each paragraph.
1. 1 understand that state law requires construction to be done by a licensed contractor and have applied for an owner -builder permit under an
exemption from the law. The exemption specifies that I, as the owner of the property listed, may act as my own contractor with certain
restrictions even though I do not have a license.
Initial 416
2. I understand that building permits are not required to be signed by a property owner unless he or she is responsible for the construction and
is not hiring a licensed contractor to assume responsibility.
Initial
3. I understand that, as an owner builder, I am the responsible party of record on a permit. I understand that I may protect myself from potential
financial risk by hiring a licensed contractor and having the permit filed in his or her name instead of my own name. I also understand that the
contractor is required by law to be licensed in Florida and to list his or license numbers on permits and contracts.
Initial k
4. I understand that I may build or improve a one family or two-family residence or a farm outbuilding. I may also build or improve a commercial
building if the costs do not exceed $75,000. The building or residence must be for my use or occupancy. It may not be built or substantially
improved for sale or lease. If a building or residence that I have built or substantially improved myself is sold or leased within 1 year after the
construction is complete, the law will presume that I built or substantially improved it for sale or lease, which violates the exemption.
Initial Ac
5. I understand that, as the owner -builder, I must provide direct, onsite supervision of the construction. /�
Initial /`�C
6. I understand that I may not hire an unlicensed person to act as my contractor or to supervise persons working on my building or residence. It
is my responsibility to ensure that the persons whom I employ have the license required by law and by county or municipal ordinance.
Initial
7. I understand that it is frequent practices of unlicensed persons to have the property owner obtain an owner -builder permit that erroneously
implies that the property owner is providing his or her own labor and materials. I, as an owner -builder, may be held liable and subjected to
serious financial risk for any injuries sustained by an unlicensed person or his or employees while working on my property. My homeowner's
insurance may not provide coverage for those injuries. I am willfully acting as an owner -builder and am aware of the limits of my insurance
coverage for injuries to workers on my property.
Initial /'((/
8. I understand that I may not delegate the responsibility for supervising work to be a licensed contractor who is not licenses to perform the
work being done. Any person working on my building who is not licensed must work under my direct supervision and must be employed by
me, which means that I must comply with laws requiring the withholding of federal income tax and social security contributions under the
Federal Insurance Contributions Act (FICA) and must provide workers compensation for the employee. I understand that my failure to follow
these may subject to serious financial risk.
Initial /46
9. I agree that, as the party legally and financially responsible for this proposed Construction activity, I will abide by all applicable laws and
requirement that govern owner -builders as well as employers. I also understand that the
Construction must comply with all applicable laws, ordinances, building codes, and zoning regulations.
Initial AC
10. I understand that I may obtain more information regarding my obligations as an employer from the Internal Revenue Service, the United States
Small Business Administration, and the Florida Department of Revenues. I also understand that I may contact the Florida Construction Industry
Licensing Board at 850.487.1395 or http://www.mvfloridalicense.com/dbpr/pro/cilb/index.html
Initial
11. 1 am aware of, and consent to; an owner -builder building permit applied for in my name and understands that I am the party
legally and financially responsible for the proposed construction activity at the following address:
/27, Ale" 9L3ST-
Initial 46
12. I agree to notify Miami Shores Village immediately of any additions, deletions, or changes to any of the information that I have provided on
this disclosure.
Initial
Licensed contractors are regulated by laws designed to protect the public. If you contract with a person who does not have a license, the
Constr4uction Industry Licensing Board and Department of Business and Professional Regulation may be unable to assist you with any financial
Toss that you sustain as a result of contractor may be in civil court. It is also important for you to understand that, if an unlicensed contractor or
employee of an individual or firm is injured while working on your property, you may be held liable for damages. If you obtain an owner -builder
permit and wish to hire a licensed contractor, you will be responsible for verifying whether the contractor is properly licensed and the status of
the contractor's workers compensation coverage.
Before a building permit can be issued, this disclosure statement must be completed and signed by the property owner and returned to the local
permitting agency responsible for issuing the permit. A copy of the property owner's driver license, the notarized signature of the property
owner, or other type of verification acceptable to the local permitting agency is required when the permit is issued.
Was acknowledged before me this -2 5 day of f4PA /L , 20 /7
By-/60FOr$o c"e\ Cos -It \C' ornrto who was personally known to me or who has
Produced here License or
_Thr1 V'e r Lc\en s
tification.
YANADY PRIETO
MY COMMISSION N FF 214031
EXPIRES: March 25, 2019
.r. ' Bonded Thru Notary Public Undenwiters
Miami Shores Village
Building Department
�..r 10050 N.E.2nd Avenue
W �_�..�.,6 Miami Shores, Florida 33138
iZORIDp► V Tel: (305) 795.2204
,M,O a Fax: (305) 756.8972
—
wow.. m
❑.
Immei
mum.rO =PARED BY:
L7
rmty
re) re-)
w i ▪ sr.: PO Li -
mum rs r -
ewre c - CC:
c. w
ni
uA-, r, C.
sated and being in Miami Shores Village, Florida:
H _
s) Block of eZ UAL& COO ' 7 - (Subdivision), according to the plat thereof, as recorded in the Plat Book
=� z v Page of the Public Records of Miami -Dade County, Florida, (address) /0 70 Ai--9 S 7 and
E' "`• WHEREAS, the undersigned owner(s) have sought certain development approval from Miami Shores and are providing this document in consideration thereof
ri w 4c�c
`'} `La of to induce the Village to grant same: •
NOW, THEREFORE, for good and valuable consideration, the receipt and sufficiency of which is adknowfedged, the undersigned do(es) hereby declare and
DECLARATION OF USE
agree:
KNOW ALL MEN BY THESE PRESENTS:
WHEREAS, the undersigned ALF SD - CI S77L -J is/are the fee simple owner(s) of the following described property ('Property')
1. That the Property will not be used in violation of any ordinance of Miami Shores Village or Miami -Dade County now in effect or hereinafter enacted.
2. That the property will be used for a single family residence only.
3. That he/she will not convey or cause to be conveyed the title to the above property without requiring the successor in title to abide by all terms and
conditions set forth herein.
FURTHER, the undersigned declare(s) that this covenant is intended and shall constitute a restrictive covenant conceming the use, enjoyment and title to the
above Property and shall constitute a covenant running with the land and shall be binding upon the undersigned, his/her successors and assigns and may only be released
by Miami Shores Village, or its successors, in accordance with the codes, rules and regulations of said Village then in effect
IN WITNESS WHEREOF, the undersigned has/have caused hand(s) and seal(s) to be affixed hereto on this 3 day of
20a.
Signature
and Print K av - r c I Cz '
Signature
and Print l aDi I C \ f L.VA
STATE OF FLORIDA )
COUNTY OF MIAMI-DADE )
Signature
and Print
T I HEREBYr)
CERTIFY that on this day personally appeared before me 44FUO M. (fi -,11r) who is personally known to me or has produced
1 )r r' V l\ ('•Q \S'& (type of identification) as identification and he/she acknowledge that he/she executed the foregoing, freely and voluntarily, for
purposes therein expressed.
HA C ei t i f F�befon: me An _ day of M Cl 20
HER AFY tY1f�t she copy —give
PUBLIC, STATE OF
"" '., YANADY PRIETO
MY COMMISSION # FF 214031
EXPIRES: March 25, 2019
Bonded Tim Notary Public Undereifeis
iimuiiimiiiiiiumuumimiiiiiimi
C:FH 2017R4256381 OR BK 30523 F'9s 4694-4695 2F'9s
RECORDED i i5/i i5/2017 13:34: i i2
HARVEY RUVIw AERK. OF C r t1IANI-D E :OUNTYr FLORIDAe
9
iami hores Villa
Building Department
10050 N.E.2nd Avenue
Miami Shores, Florida 33138
Tel: (305) 795.2204
Fax: (305) 756.8972
COVENANT OF CONSTRUCTION WITHIN RIGHT OF WAY
Whereas, (owner) Ai -Font (,-,9 sr-n-1-o hereinafter referred to as the owner of
the following described property (address): /070 /vE q:3 1-1 s7 At/Arty skteizej f ' - 33l38
Legal Description Lot Block Subdivision
Folio # /1-32 - 5 -0/6 - 00/ 0
Requests permission to install (describe work): R674L4-011-i— 771E OLD O/C
By/7E Za,
Within the public right of way of (address)
93 r `�
/O 70 A/E
sr
IN CONSIDERATION of the approval of this permit by the Village, the owner agrees as follows:
1. To maintain and repair, when necessary, the above -mentioned item(s) installed within the dedicated right of
way. If it becomes necessary for Miami Shores Village or Dade County to make repairs or maintain said
items within public right of way including restoration of street by reason of the Owner's failure to do so,
such expense shall be paid by the Owner or shall constitute a lien against the above described property
until paid.
2. The owner does hereby agree to indemnify and hold Miami Shores Village or Dade County harmless from any
and all liability, which may rise by virtue of permitting the installation of these items within the public right of way.
1
OR Bkti 30523 PG 4695
LAST PAGE
3 The Owner does hereby agree to remove or relocate their facilities at their own expense, within 60 days
notice by the Village to do so. Failure to comply with this notice will result in the Village causing the item(s)
to be removed and a lien being placed on the property and/or assessed against the Owner for all costs
incurred in the removal and disposal of the item(s).
4. The undersigned further agrees that these conditions shall be deemed a covenant running with the land
and shall remain in full force and effect and be binding on the undersigned, their heirs and assigns, until
such time as this obligations has been canceled by an affidavit filed in the Public Records of Dade County,
Florida by the Village Manager of Miami Shores Village (or his fully authorized representative).
SIGNED, SEALED, EXECUTED AND ACKNOWLEDGE on this
SIG ED, SEALED, AND DELIVERED in the presence of:
;ui, YANADY PRIETO
•': ; MY COMMISSION # FF 214031
+.i�h EXPIRES: March 26, 2019
"i p� w? Bonded Thru Wry Public U�®fwritbr4
2
day o
,2017
0
'wner's Signature )
/4L5ON�O .TEL CAT /LLO
DRAINAGE REPORT
FOR
1070 NE 93 st
MIAMI SHORES VILLAGE, FL 33138
scs's°
51,p11
Prepared by:
• .
•
..
.. •
......
.
••..
. .
••..
......
. .
•••
••
......
•
.•
• .
. .
. ..
.. .
REMBERTO CONTRERAS, PROFESSIONAL
ENGINEER
7066 S.W. 44TH STREET
MIAMI, FLORIDA 33155
TEL: 786-306-4724
JULY, 2016
••..
• •
••..
••••
• ••
•.•
•
•.••
• •
.• ..
•...
• ••
•• •
• .• •
• •
••
,0111111//,,/
E�ABERr /
Via;• �{; g,:��
.m _
Coritreray
. No -Y5$'
/ ENG1N������`
/f11111ii�
I. PROJECT DESCRIPTION
The project consists of the renovation of an existing single family home. Storm water
runoff will be retained on -site.
II. SITE STORAGE CALCULATIONS
Project Site Area = 23,000 SF
Required Site Storage = 1-in x 23,000 SF / 12-in/ft = 1,917 CF
Provided Site Storage:
Swale Area I Storage (Front) = Swale Area x Shallowest Depth of Swale Area
Swale Area I Storage = 506 SF x (10.85-ft — 10.50-ft) = 177 CF
Swale Area II Storage (Back) = 2,650 SF x (11.20-ft — 10.50-ft) = 1,855 CF
Swale Area I Storage + Swale Area II Storage = 177 CF + 1855 CF= 2,.032 CF
• ••.
• • •
••
• •
••••
•
•
•.•••.
Swale Area Storage Provided = 2,032 CF > Required Site Stoma•. 1,91a.CF ; ......
• •
•• ••
••••..
• • •
• •
• •
• • •
•• •
• •••
• • •
•• •
• •
i•••..
•
••• •
00000
• •
•••••
••••••
•
•
•
• • • • • •
• •
••••••
• •