Loading...
WS-17-4 INSPECTION RECORD POST ON-SITE Permit IVO. r 1/S-1 1 74 �oaes N e "'"" ��� Miami Shores Village Type: ����� 10050 N.E.2nd Avenue Permit T WindowslShutters un nm� „. -�- Miami Shores,FL 33138-0000 UVOric Classifcation:Window/Door Replacement`� `�tioy iPhone: (305)795-2204,,Fax: (305)756-8972 Issue Date:4/17/2017 �O1tiDp' Expires: 10/14/2017 INSPECTION REQUESTS: (305)762-4949 or Log on at https://bidg,miamishoresvillage.conVcap REQUESTS ARE ACCEPTED DURING 8:30AM-3:30PM FOR THE FOLLOWING BUSINESS DAY. Requests must be received by 3 pm for following day inspections. Windows/Shutters Parcel #1132050310030 Owner's Name:MARC AND ANNE LITZENBERG Owner's Phone: Job Address: 1420 NE 103 StreOt "g-in n tit v oir n Total Square Feet: 0 - Miami Shp4s FLk.�'� ON - -* Total Job Valuation: $ 144,756.20 0 Bond Number: - � �- IS ALLOWED: DAY THROUGH FRIDAY,8:00AM-7c00PM. Contractors Phone Primary Co tra , SATURDAY 8:00AM-6:00PM. EJD CONSTRUCTION CONSTRACT (305)433-4843 �, "s` NOW ORK IS ALLOWED ON SUNDAY OR HOLIDAYS. BUILDING AND ROOFING INSPECTIONS ARE DONE MONDAY THROUGH FRIDAY. R NO INSPECTION WILL BE MADE UNLESS THE PERMIT CARD IS DISPLAYED AND HAS BEEN APPROVED. PLANS ARE READLY AVAILABLE. IT IS THE PERMIT APPLICANT'S RESPONSIBILITY TO ENSURE THAT WORK IS ACCESSIBLE AND EXPOSED FOR INSPECTION PURPOSES. NEITHER THE BUILDING OFFICIAL NOR THE CITY SHALL BE LIABLE FOR EXPENSE ENTAILED IN THE REMOVAL OR REPLACEMENT OF ANY MATERIAL REQUIRED TO ALLOW INSPECTION. WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE COMMENCING WORK OR RECORDING YOUR. NOTICE OF COMMENCEMENT. /Sf�Ip�/�'�!�� �✓�lv�� J� yy'�'L. �t.f 3S`✓ � �/ � GCI✓� INSPECTION RECORD ZONINGI STRUCTURAL �� PLUMBING INSPECTION DATE INSP INSPECTION DATE' INSP , INSPECTION DATE INSP Foundation. Zoning Final I . -- Stemwall ZONING COMMENTS Rough Slab Water Service Columns(1st Lift) 2"d Rough Columns(2nd Lift) Top Out ' Tie Beam Fire Sprinklers Truss/Rafters Septic Tank Roof Sheathing Sewer Hook-up Bucks Roof Drains Windows/Doors TELECTRICAL Gas Interior Framing iNSPECTION DATE INSP LP Tank Insulation Temporary Pole Well Ceiling Grid 30 Day Temporary Lawn Sprinklers Drywall Pool Bonding ' Main Drain Firewall Pool Deck Bonding Pool Piping Wire Lath Pool Wet Niche Backflow Preventor Pool Steel Underground Interceptor Pool Deck Footer Ground Catch Basins Final Pool Slab Condensate Drains Final Fence Wall Rough HRS Final Screen Enclosure Ceiling Rough r _ Driveway Rough PLUMBING COMMENTS Driveway Base Telephone Rough Tin Cap Telephone Final Roof in Progress TV Rough Mop in Progress TV Final ` Final Roof Cable Rough Shatters Attachment Cable Final Final Shutters Intercom Rough Rails and Guardrails Intercom.Final MECHANICAL ADA compliance Alarm Rough INSPECTION DATE INSP Alarm Final Underground Pipe DOCUMENTS Fire Alarm,Rough Soil Bearing Cert Fire Alarm Final Rough Soil Treatment Cert -- Service Work-With Floor Elevation Survey Ventilation Rough Reinf Unit Mas Cent ' ELECTRICAL COMMENTS Hood Rough Insulation Certificate Pressure Test Spot Survey' Final Hood ` Final Survey ` "' Final Ventilation Truss Certification final Pool Heater STRUCTURAL COMMENTS Final Vacuum 7flnalAIarM MECHANICAL COMMENTS DATE INSP kler `