RF-17-1195 INSPECTION RECORD POST ON SITE
RF-5-17-1195
5�►ORES L Permit=NO.
Miami Shores Village
'@0050 N.E.2nd Avenue Pem►it Type:Roof,
--+. Miami Shores,FL 33138-0000
09.1 Phone: (305)795-2204 Fax: (305)756-8972 work CIaSSiIrCBtIOIIA Metal
FLQ �� Issue Date:5/2/2017
Expires: 10/29/2017
INSPECTION REQUESTS: (305762-4949
REQUESTS ARE ACCEPTED DURING 8:30AM-3:30PM FOR THE FOLLOWING BUSINESS DAY.
Roof Parcel #:1132050310030
Owner's Name:MARC AND ANNE LITZENBERG Owner's Phone:
Job Address: 1420 NE 103 Street Total Square Feet: 5000
Bond Number: Moami Shores_ Total Job Valuation: $ 45;000.00
WORK IS ALLOWED MONDAY THROUGH SATURDAY,
Contractors� f �,, ont r 7:30AM-6:OOPM.NO WORK IS ALLOWED ON
SUNDAY OR HOLIDAYS.
SHEET METAL AND ROOFING TECI "k)3-Q121 `-ejtfi f
BUILDING INSPECTIONS ARE DONE MONDAY
jjk -ION` THROUGH THURSDAY. ROOFING INSPECTIONS ARE
DONE MONDAY THROUGH FRIDAY. NO BUILDING
INSPECTIONS DONE ON FRIDAY.
COLOR THROUGH CONCRETE TILE OR SOLID CLAY TILE REQUIRED.
NO INSPECTION WILL BE MADE UNLESS THE PERMIT CARD IS DISPLAYED AND HAS BEEN APPROVED. PLANS ARE READLY AVAILABLE. IT IS
THE PERMIT APPLICANTS RESPONSIBILITY TO ENSURE THAT WORK IS ACCESSIBLE AND EXPOSED FOR INSPECTION PURPOSES. NEITHER
THE BUILDING OFFICIAL NOR THE CITY SHALL BE LIABLE FOR EXPENSE ENTAILED IN THE REMOVAL OR REPLACEMENT OF ANY MATERIAL
REQUIRED TO ALLOW-INSPECTION.
WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF
COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS
TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDED
AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU
INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR , AN
ATTORNEY BEFORE COMMENCING WORK OR RECORDING YOUR NOTICE OF
COMMENCEMENT.
INSPECTION RECORD
ZONING
PLUMBING
INSPECTION STRUCTUI .'DATE INSP INSPECTION DATE IIP INSPECTION DATE -INSP
Foundation < Zoning Final
Stemwall ZONING COMMENTS' Rough
Slab Water Service
Columns(1st Lift) 2nd Rough
Columns(2nd Lift) Top Out
Tie Beam Fire Sprinklers
Truss/Rafters Septic Tank'
Roof Sheathing Sewer Hook-upµ
Bucks Roof Drains
Windows/Doors ELECTRICAL Gas
Interior Framing INSPECTION DATE INSP LP Tank
Insulation Temporary Pole Well
Ceiling Grid 30 Day Temporary Lawn Sprinklers
Drywall Pool Bonding Main Drain
Firewall Pool Deck Bonding Pool Piping
Wire Lath Pool Wet Niche Backflow Preventor
Pool Steel Underground Interceptor
Pool Deck Footer Ground Catch Basins
Final Pool Slab Condensate Drains
Final Fence Wall Rough HRS Final
Screen Enclosure Ceiling Rough
Driveway .. Rough PLUMBING COMMENTS ;
Driveway f Telephone Rough
Tin Cap I Yj 17 Telephone Final
Roof in Progress TV Rough
Mop in Progress N Final
Final Roof Cable Rough-
Shutters
oughShutters Attachment Cable Final
Final Shutters Intercom Rough
Rails and Guardrails - _ Intercom Final MECHANICAL
ADA compliance Alarm Rough INSPECTION DATE '' INSP
Alarm Final ' .Underground Pipe ,
DOCUMENTS Fire Alarm,Rough
SoiLBearing.Cert -- _ _ Fire-Alarm-Final-- — - — Rough—
Soil Treatment Cert , Service Work With
Floor Elevation Survey ' Ventilation Rough
Reinf Unit Mas Cert v ELECTRICAL COMMENTS Hood Rough
Insulation Certificate Pressure Test
Spot Surve%1
-p- Final Hood
Final Survey Final Ventilation
Truss,Certification Final Pool Heater
STRUCTURAL COMMENTS Final Vacuum
MECHANICAL COMMENTS
INSPECTION JDATE, INSP
Final Sprinkler
Final Alarm i