RF-18-171 (2) C I V I L Reileh Engineering Corp.
(Consulting Engineer)
2370 Southwest 123`d Avenue
Miami,Florida 33175-1174
Tel:305-823-8008/305-397-6414
ENGINEER Fax:305-823-3300/305-884-8834
Website:www.reilehengineering.com
March 7, 2018
Cherry Roofing Enterprises
3901 Southwest 40 Avenue
Hollywood, Florida 33023-6223
Project: ROOF TILE UPLIFT TEST REPORT
Residential Home
1685 Northeast 104 Street Miami Shores, FloridaJ'A
Information provided by client:
Permit Number: Not Provided .
Date Completion: March 5, 2018
Roofing Contractor: Cherry Roofing Enterprises
Project Number: 18-0283
(Testing I.aborator5• Certificate,#11-0715.04)
Dear Sirs;
In accordance with your request and authorization, a representative of Reileh Engineering
Corporation completed the Roof Tile Uplift Test at the above referenced project. This testing was
performed in general accordance with Roofing Application Standard TAS No.106 -- Standard
procedure for field verification of the bonding of mortar or adhesive set tile system and mechanically
attached, rigid, discontinuous roof systems.
The total of the tested roof surface area was less than 10000 square feet, and the mean height of the
roof is less than 40 feet above ground surface. The type of tile used for this project was reported to
be concrete/clay Roof Tile. This tile was reported to have"been foamed in place.
At the time of our inspection,the entire area of the roof was examined for loose tiles. Not less than
one(1)tile in ten(10)of all components in the field area and one(1)tile in five(5)of all tiles in the
perimeter and comer areas were physically examined. A minimum of one(1)test per every two(2)
squares in the field, one (1)test per square in the perimeter area,ridge caps and one(1)tesvin each
corner were conducted.
_---�-�-- �, .._-_._ _ ._ .._ -Y -.�,,-•,.,r.�...�...,�-,r -. �. ,. _ Kms-._._�..a
Based on our.test.results, we conclude t''r at;tlie installation-of the-roof file.,at-the above referenced
'project meets the,test�requirement outlined inithe above-mentioned:protocol. 'Attache please find
a copy ofaour test.report,fo'r your review: .. ..t�i-
Reileh Engineering Corporation appreciates the opportunity of assisting you in this project. If you
have any questions or if we may be of further assistance, please do not hesitate to contact the
undersigned.
Respectfully submitted;
Reileh Engineering Corporation
f �
r
ohamad Sonny Salleh, P.E.49014
Project Manager
TILE UPLIFT TEST
Residential Home
1685 Northeast 104 Street k
Miami Shores,Florida
Cover Page
Page 2 thru 7 of 7
Drawing 18-0283
I
Reileh Engineering Corporation--Project Number-18-0283—Page 2 of 7
Report of
TILE UPLIFT TEST
for
Residential Home
1685 Northeast 104 Street
Miami Shores, Florida
Project Number: 18-0283
Test Number Test Load, Ib Test Status
1 ' 35 Pass }
2 35 Pass
3 35 Pass
G
4 35 Pass
5 35 Pass
1
6 35 Pass
7 35 Pass
8 35 Pass
9 35 Pass
10 35 Pass
11 35 Pass
12 35 Pass
13 35 Pass
14 35 Pass
P
15 35 Pass
16 35 Pass
17 35 Pass
18 35 Pass
19 35 Pass
i
20 35 Pass
21 35 Pass
22 35 Pass
23 35 Pass
i
,
24 35 Pass
- Reileh Engineering Corporation--Project Number-18-0283-Page 3 of 7
Test-Number Test Load lb Test Status
25 35 Pass
26 35 Pass
27 35 Pass
28 35 Pass
29 35 Pass
30 35,, Pass
31 35 Pass
32 35 Pass
33 35 Pass
34 35 Pass
35 35 Pass
36 35 Pass
37 35 Pass
38 35 Pass
39 35 Pass
40 35 Pass
41 35 Pass
42 35 Pass
43 35 Pass
f 44 35 Pass
f
45 35 Pass
46 35 Pass
47 35 Pass
48 35 Pass
49 35 Pass
50 35 Pass
51 35 Pass
52 35 Pass
53 35 Pass
54 35 Pass
Reileh Engineering Corporation--Project Number-18-0283—Page 4 of 7
Test Number Test Load lb Test Status
55 35 Pass
56 35 Pass
57 35 Pass
58 35 Pass
59 35 Pass
60 35 Pass
61 35 Pass
62 35 Pass
63 35 Pass
64 35 Pass
65 35 Pass
66 35 Pass
67 35 Pass
I
68 35 Pass
F f
69 35 Pass
70 35 Pass
71 35 Pass
72 35 Pass
73 35 Pass
I 74 35 Pass
i
75 35 Pass
76 35 Pass
77 35 Pass
78 35 Pass
a
79 35 Pass
80 35 Pass
81 35 Pass
82 35 Pass
r 83 35 Pass
84 1 35 Pass
Reileh Engineering Corporation--Project Number- 18-0283—Page 5 of 7
i
"Test Number Test Load lb Test Status
85 35 Pass
86 35 Pass
87 35 Pass
88 35 Pass
89 35 Pass
90 35 Pass
91 35 Pass
92 35 Pass
93 35 Pass I
94 35 Pass
95 35 Pass
96 35 Pass
97 35 Pass
98 35 Pass
99 35 Pass
a
100 35 Pass
101 35 Pass
102 35 Pass
103 35 Pass
104 35 Pass
105 35 Pass
106 35 Pass
107 35 Pass
108 35 Pass
109 35 Pass
110 35 Pass
111 35 Pass
112 35 Pass
113 35 Pass
114 35 Pass
Reileh Engineering Corporation--Project Number- 18-0283—Page 6 of 7
I
r
TestNumber Test Load(lbo Test Status ,
115 35 Pass
116 35 Pass
117 35 Pass
118 35 Pass
k
Test 1-16 Corner, 17-33 Ridge Caps, 34-56 Perimeter, 57-118 Field
i
r
r
I
Reileh Engineering Corporation--Project Number-18-0283-Page 7 of 7
14 s7 u
78 16
II
%14
IIS
19
1174015 55
116
el
85. 115
41 I
43 42 114
1
82
88 86 56 55 9
N 87 � 68
67
Bq 66 113 III 109
89 8554
10 55 1
112 110
44 11 65 65 108 101 106 58
90 12 61
94 64 62 60 5" I 52
92 96 101 102 b5 0459
98
I
91 95 100 `50 51 6
91 99
I
2 45 46 47 48 '19
3
150,
NUMMR OF t1;5t Mt;IWSk - 1800 5P 0 tuna-CAP 95t LOCATION
FEW - _ -62 - - �COf;W - 80 5P
MOfU
25 PENOT5 WOKEN
OWNW - 16 Mt?IM V 1715MNC�, a - 5' L MNOTF5 005 Uile 18'028
0126e CAP 6 11 COM AlTA- 3'X 5'
APMOX.POOP t5t LOCATION5,AMA5, ANP t9lWN51ON5