WS-17-1957 (2)INSPECTION RECORD
Miami Shores Village
10050 N.E. 2nd Avenue
Miami Shores, FL 33138-0000
Phone:(305)795-2204 Fax: (305)756-8972
POST ON SITE
Permit NO WS -8-17-1957
Issue Da
8/21/2017
Permit Type: Windows/Shutters
cation: Window/Door Replacement
Expires: 02/17/2018
INSPECTION REQUESTS: (305)762-4949 or Log on at https://bldg.miamishoresvillage.comlcap
REQUESTS ARE ACCEPTED DURING 8:30AM - 3:30PM FOR THE FOLLOWING BUSINESS DAY.
Requests must be received by 3 pm for following day +sgc ons.
Windows/Shutters
4.4
Parcel #:1 121360131540
Owner's Name:
Job Address: 157 NW 103 Street
Bond Number:
Miami Shores, FL 33150 -
Contractor(s)
Owner's Phone: (305)610-1905
Total Square Feet: 256.84
Total Job Valuation: $ 9,440.96
Phone Primary Contractor
JRA CONSTRUCTION GROUP LLC (305)819-7844 Yes
I/ORK IS ALLOWED:
U10NDAY THROUGH FRIDAY, 8:OOAM - 7:00PM.
SATURDAY 8:OOAM - 6:OOPM.
NO WORK IS ALLOWED ON SUNDAY OR HOLIDAYS.
BUILDING AND ROOFING INSPECTIONS ARE DONE
MONDAY THROUGH FRIDAY.
NO INSPECTION WILL BE MADE UNLESS THE PERMIT CARD IS DISPLAYED AND HAS BEEN, APPROVED. PLANS ARE READLY AVAILABLE. IT IS
THE PERMIT APPLICANT'SRESPONStBILITY TO ENSURE THAT WORK IS ACCESSIBLE AND EXPOSED FOR INSPECTION PURPOSES. NEITHER
THE BUILDING OFFICIAL NOR THE CITY SHALL BE LIABLE FOR EXPENSE ENTAILED IN THE REMOVAL OR REPLACEMENT OF ANY MATERIAL
REQUIRED TO ALLOW INSPECTION.
WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF
COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS,
TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDED
AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU1
INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN
ATTORNEY BEFORE COMMENCING WORK OR RECORDING YOUR NOTICE OF
COMMENCEMENT.
INSPECTION RECORD
WINDOWS
STRUCTURAL
INSPECTION
DATE
INSP
Foundation
Attachment
Water Service
Stemwall
2nd Rough
Slab
Excavation
FINAL
Columns (1st Lift)
DATE
INSP
Columns (2nd Lift)
Septic Tank
Tie Beam
Sewer Hook-up
Truss/Rafters
Roof Drains
Pool Deck Bonding
Roof Sheathing
Pool Wet Niche
Bucks
Underground
Interior Framing
Footer Ground
Insulation
Slab
Main Drain
Ceiling Grid
Wall Rough
Pool Piping
Drywall
Backflow Preventor
Firewall
Interceptor
Wire Lath
Catch Basins
Pool Steel
Condensate Drains
Pool Deck
HRS Final
Final Pool
FINAL
Final Fence
Screen Enclosure
Driveway
MECHANICAL
INSPECTION
DATE
Driveway Base
Underground Pipe
Tin Cap
Roof in Progress
Rough
Mop in Progress
Final Roof
Ventilation Rough
Shutters Attachment
Hood Rough
Final Shutters
Pressure Test
ELECTRICAL COMMENTS
Rails and Guardrails
Final Hood
ADA compliance
Final Ventilation
FINAL
Final Pool Heater
DOCUMENTS
Soil Bearing Cert
Soil Treatment Cert
MECHANICAL COMMENTS
Floor Elevation Survey
Reinf Unit Mas Cert
Insulation Certificate
Spot Survey
Final Survey
Truss Certification
STRUCTURAL COMMENTS
WINDOWS
& DOORS
INSPECTION
DATE
INSP
Attachment
Water Service
IIMMIMIlltkl
2nd Rough
PUBLIC WORKS
INSPECTION DATE INSP
Excavation
FINAL
ELECTRICAL
INSPECTION
DATE
INSP
Temporary Pole
Septic Tank
30 Day Temporary
Sewer Hook-up
Pool Bonding
Roof Drains
Pool Deck Bonding
Gas
Pool Wet Niche
LP Tank
Underground
Well
Footer Ground
Lawn Sprinklers
Slab
Main Drain
Wall Rough
Pool Piping
Ceiling Rough
Backflow Preventor
Rough
Interceptor
Telephone Rough
Catch Basins
Telephone Final
Condensate Drains
TV Rough
HRS Final
TV Final
FINAL
Cable Rough
Cable Final
Intercom Rough
MECHANICAL
INSPECTION
DATE
Intercom Final
Underground Pipe
Alarm Rough
Alarm Final
Rough
Fire Alarm Rough
Fire Alarm Final
Ventilation Rough
Service Work With
Hood Rough
FINAL
Pressure Test
ELECTRICAL COMMENTS
i
Final Hood
Final Ventilation
INSPECTION
FIRE
DATE
INSP
Final Sprinkler
Final Alarm
FINAL
PLUMBING
INSPECTION DATE
INSP
Rough
Water Service
2nd Rough
Top Out
Fire Sprinklers
Septic Tank
Sewer Hook-up
Roof Drains
Gas
LP Tank
Well
Lawn Sprinklers
Main Drain
Pool Piping
Backflow Preventor
Interceptor
Catch Basins
Condensate Drains
HRS Final
FINAL
PLUMBING COMMENTS
MECHANICAL
INSPECTION
DATE
INSP
Underground Pipe
Rough
Ventilation Rough
Hood Rough
Pressure Test
Final Hood
Final Ventilation
Final Pool Heater
Final Vacuum
FINAL
MECHANICAL COMMENTS