RC-17-618Certificate of Completion
Miami Shores Village
10050 NE 2 Ave, Miami Shores FL, 33138
Tel: 305-795-2204 Fax: 305-756-8972
Building Inspection Department
This certificate issued pursuant to the requirements of the Florida Building Code 106.1.2 certifying that at the time of issuance this structure was in
compliance with the various ordinances of the jurisdiction regulating building construction or use. For the following:
Permit Type RESIDENTIAL CONSTRUCTION Bldg. Permit No. RC -3-17-618
Owner CASSA GROUP LLC Contractor 904 INVESTMENTS
Subdivision/Project NONE Date Issued February 28, 2018
Occupancy
Construction Type V- B Load N/A
Occupancy
Square Footage 1000 Type R-3
Description of INTERIOR RENOVATION Applicable
Work Code 2014 FLORIDA BUILDING
Location
157 NW 103 ST
Miami Shores FL 33138
.o2/071
Building Officials Approval Ismael Naranjo, CBO
Not Transferable
POST IN A CONSPICUOUS PLACE
INSPECTION RECORD
Miami Shores Village
10050 N.E. 2nd Avenue
Miami Shores, FL 33138-0000
Phone: (305)795-2204 Fax: (305)756-8972
POST ON SITE
Permit No. RC -3-17-618
Issue Date 7/1 /2017
INSPECTION REQUESTS: (305)762-4949 or Log on at https://bldg.miamishoresvillage.comicap
REQUESTS ARE ACCEPTED DURING 8:30AM - 3:30PM FOR THE FOLLOWING BUSINESS DAY.
Requests must be received by 3 pm for following day inspections.
Residential Construction
Owner's Name:
Parcel #:1 121360131540
Job Address: 157 NW 103 Street
Miami Shores FL 33150 -
Bond Number: 3455
Owner's Phone: (305)610-1905
Total Square Feet: ` 1000
Contractor s
904 INVESTMENTS
Phone im r ntra
(754)245-
ALLOWED:
THROUGH FRIDAY, 8:00AM - 7:OOPM.
Y 8:OOAM - 6:00PM.
RK IS ALLOWED ON SUNDAY OR HOLIDAYS.
G AND ROOFING INSPECTIONS ARE DONE
THROUGH FRIDAY.
o I f r 1� e^'
- - rI\ s"e
z�C
NO INSPECTION WILL BE MADE UNLESS THE PERMIT CARD IS DISPLAYED AND HAS BEEN APPROVED. PLANS ARE READLY AVAILABLE. IT IS
THE PERMIT APPLICANT'S RESPONSIBILITY TO ENSURE THAT WORK IS ACCESSIBLE AND EXPOSED FOR INSPECTION PURPOSES. NEITHER
THE BUILDING OFFICIAL NOR THE CITY SHALL BE LIABLE FOR EXPENSE ENTAILED IN THE REMOVAL OR REPLACEMENT OF ANY MATERIAL
REQUIRED TO ALLOW INSPECTION.
WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF
COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENT
TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDE
AND POSTED ON THE JOB TE BEFORE THE FIRST INSPECT N. IF YOU
INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR A
ATTORNEY BEFORE COMMENCING WORK OR RECORDING YOUR NOTICE O
COMMENCEMENT.
INSPECTION RECORD
STRUCTURAL
INSPECTION
DATE
INSP
Foundation
PUBLIC WORKS
INSPECTION DATE
INSP
Stemwall
FINAL
Slab
ELECTRICAL
INSPECTION DATE
INSP
Columns (1st Lift)
30 Day Temporary
Columns (2nd Lift)
Pool Bonding
Tie Beam
Pool Deck Bonding
russ/Rafters '
//0� ?
Roof Sheathing
underground
;1ergground
Bucks
Footer Ground
Interior Framing
/1/ 7
Slab
Insulation (Na 1 jO
i
Wall Rough
Ceiling Grid
Ceiling Ro •
Drywall
Z/07
Ai
Firewall
Telephone Rough
k=' Wire Lath
Telephone Final
Pool Steel
TV Rough
Pool Deck
TV Final
Final Pool
Cable Final
Final Fence
Intercom Rough
Screen Enclosure
Intercom Final
Driveway
Alarm Final
Driveway Base
Fire Alarm Rough
Tin Cap
ire_Alarm .Final
Roof in Progress
;� `,i
!/;j�r�Ci%'�
CO' MENT
. Lc
Mop in Progress
Final Roof
Shutters Attachment
al Shutters
s and Guardrails
DA compliance
JFNAL •
•
I DOCUMEN
Soil Bearing Cert
Soil Treatment Cert
Floor Elevation Survey
Reinf Unit Mas Cert
Insulation Certificate
Spot Survey
Final Survey
russ Certification
STRUCTURAL COMMENTS
WINDOWS & DOORS
INSPECTION DATE INSP
Attachment
FINAL
PUBLIC WORKS
INSPECTION DATE
INSP
Excavation
FINAL
ELECTRICAL
INSPECTION DATE
INSP
Temporary Pole
30 Day Temporary
Pool Bonding
Pool Deck Bonding
Pool Wet Niche
underground
;1ergground
Footer Ground
Slab
Wall Rough
Ceiling Ro •
Roug Mr.
- 4)/.
Telephone Rough
Telephone Final
TV Rough
TV Final
Cable Rough
Cable Final
Intercom Rough
Intercom Final
Alarm Rough
Alarm Final
Fire Alarm Rough
ire_Alarm .Final
Service Work Witt
FINAL I�
ELECTRICAL
;� `,i
!/;j�r�Ci%'�
CO' MENT
. Lc
INSPECTION
FIRE
DATE
INSP
Final Sprinkler
Final Alarm
FINAL
INSPECTION
PLUMBING
DATE
INSP
Rough
Water Service
2nd Rough
Top Out
Fire Sprinklers
Septic Tank
Sewer Hook-up
Roof Drains
Gas
LP Tank
Well
Lawn Sprinklers
Main Drain
Pool Piping
Backflow Preventor
Interceptor
Catch Basins
Condensate Drains
HRS Final
PLUMBING COMMENTS
MECHANICAL:
INSPECTION
DATE
INSP
Underground Pipe
— -Rough
g
(Lk
Ventilation Rough
Hood Rough
Pressure Test
Final Hood
Final Ventilation
Final Pool Heater
Final Vacuum
MECHANICAL COMMENTS
It