Loading...
MC-17-2927Project Address 9537 NE 2 Avenue Miami Shores, FL 33138 - Miami Shores Village 10050 N.E. 2nd Avenue NE Miami Shores, FL 33138-0000 Phone: (305)795-2204 Permit Permit NO. MC -12-17-2927 Permit Type: Mechanical - Commercial Work Classification: Addition/Alteration Permit Status: APPROVED Issue Date: 12/18/2017 Expiration: 06/16/2018 Parcel Number 1132060133910 Block: Lot: Applicant DVS LLC Owner Information Address Phone CeII DVS LLC 9400 NE 2 Avenue MIAMI FL 33138- (305)756-3711 Contractor(s) JV & VR SERVICES CORP Phone CeII Phone (786)301-3029 Valuation: Total Sq Feet: $ 13,500.00 0 Tons: Additional Info: WALK-IN COOLER/ FREEZER INTERIOR I Classification: Commercial Approved: In Review Comments: Date Denied: Scanning: 3 Date Approved: : In Review Type of Work: WALK-IN COOLER/ FREEZER INTER Fees Due CCF DBPR Fee DCA Fee Education Surcharge Permit Fee Scanning Fee Technology Fee Total: Amount $8.40 $6.08 $4.05 $2.80 $405.00 $9.00 $11.20 $446.53 Pay Date Pay Type Invoice # MC -12-17-65889 12/18/2017 Credit Card 12/13/2017 Credit Card Amt Paid Amt Due $ 396.53 $ 50.00 $ 50.00 $ 0.00 Available Inspections: Inspection Type: Ventilation Final Rough Rough Duct Duct Detector Test Review Mechanical In consideration of the issuance to me of this permit, I agree to perform the work covered hereunder in compliance with all ordinances and regulations pertaining thereto and in strict conformity with the plans, drawings, statements or specifications submitted to the proper authorities of Miami Shores Village. In accepting this permit I assume responsibility for all work done by either myself, my agent, servants, or employes. I understand that separate permits are required for ELECTRICAL, PLUMBING, MECHANICAL, WINDOWS, DOORS, ROOFING and SWIMMING POOL work. OWNERS AFFIDAVIT: I certify that all the foregoing information is accurate and that all work will be done in compliance with all applicable laws regulating construction and zoning. Futhermore, I authorize the above-named contractor to do the w. rk stat Authorized Signature: Owner / Applicant / Contractor / Agent Building Department Copy ecember 18, 2017 Date December 18, 2017 1 Miami Shores Village Building Department 10050 N.E.2nd Avenue, Miami Shores, Florida 33138 Tel: (305) 795-2204 Fax: (305) 756-8972 INSPECTION UNE PHONE NUMBER: (305) 762-4949 C.4.2cvS REC DEC 112017 DY G81A/ FBC 2O(x5 BUILDING Master Permit No. GC -2;17— 3 PC:, PERMIT APPLICATION Sub Permit No. INAC 13 - Z9 27 ❑BUILDING D ELECTRIC ❑ ROOFING D REVISION ❑ EXTENSION ❑RENEWAL ❑PLUMBING Q MECHANICAL ❑PUBLIC WORKS ❑ CHANGE OF ❑ CANCELLATION ❑ SHOP CONTRACTOR DRAWINGS JOB ADDRESS: 95-3 7 /0.F. -Z AvE City: Miami Shores County: Miami Dade Zip:3313 Folio/Parcel#: -f+-1(3 20 C.0 O 1331 (O Is the Building Historically Designated: Yes NO Occupancy Type: Grove Load: Construction Type: 11A Flood Zone: BFE: FFE: OWNER: Name (Fee Simple Titleholder): VC LLC • Phone#: 3 0- 7 5 42 - 3 7 1 ( Address: pis 3 `1 Iv' (7 2 A Ve_ City: N'7 4.eft: S'11.ofeg� n /ytState: P 1• Zip: 3 3 l 3 R' Tenant/Lessee Name: Svr"T t7Gt'G Co, 4Cle l v.,AciA) 6c9,,JUTs Phone#: 231-22_ st -727k Email: CONTRACTOR: Company Name: JV & VR SERVICES CORP Phone#: 954-548-8111 Address: 11870 W STATE RD 84 SUITE C14 City: DAVIE State: FL zip: 33325 Qualifier Name: EDUARDO A DELFINO Phone#: 954-548-8111 State Certification or Registration #: CAC057011 Certificate of Competency #: DESIGNER: Architect/Engineer: Phone#: Address: ` 3/500 City: State: Zip: Value of Work for this Permit: $ . Square/Linear Footage of Work: Type of Work: ❑ Addition ❑ Alteration ❑■ New E Repair/Replace ❑ Demolition Description of Work: WALK-IN COOLER/FREEZER INTERIOR INSTALLATION Specify color of color thru tile: (C Submittal Fee $ 5W )� id Permit Fee $ `y 05j, V OCF $ CO/CC $ Scanning Fee $ Radon Fee $ DBPR $ Notary $ Technology Fee $ Training/Education Fee $ Double Fee $ Structural Reviews $ Bond $ TOTAL FEE NOW DUE $ .3C;(6) •S3 (Revised02/24/2014) a Bonding Company's Name (if applicable) Bonding Company's Address City State Zip Mortgage Lender's Name (if applicable) Mortgage Lender's Address City State Zip Application is hereby made to obtain a permit to do the work and installations as indicated. 1 certify that no work or installation has commenced prior to the issuance of a permit and that all work will be performed to meet the standards of all laws regulating construction in this jurisdiction. I understand that a separate permit must be secured for ELECTRIC, PLUMBING, SIGNS, POOLS, FURNACES, BOILERS, HEATERS, TANKS, AIR CONDITIONERS, ETC OWNER'S AFFIDAVIT: I certify that all the foregoing information is accurate and that all work will be done in compliance with all applicable laws regulating construction and zoning. "WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT." Notice to Applicant: As a condition to the issuance of a building permit with an estimated value exceeding $2500, the applicant must promise in good faith that a copy of the notice of commencement and construction lien law brochure will be delivered to the person whose property is subject to attachment. Also, a certified copy of the recorded notice of com ement must be posted at the job site for the first inspection which occurs seven (7) days after the building permit is issued. In t bsence of such posted notice, the inspection will not be approved and a reinspection fee will be charged. Signature OWNER or AGENT The foregoing instrument was acknowledged before me this J' day of Co 14/ , 20 1 % , by �/1" / ! Qf � - Oa 'C'4 /21 iVwho is personally known to cwe.or who has produced as identification and who did take an oath. NOTARY PUBLIC: Sign: Print: Seal: ********** `I''' ELIZABETH ELORRIAGA MY COMMISSION # FF953536 140/I311n.O S3 f APPROVED BY (Revised02/24/2014) Signature CONT The foregoing instrument was acknowledged before me this 1/ day of , 20 by A—TO ) ' "who is personally known to me or who has produced Fn, -L"' identification and who did take an oath. NOTARY PUBLIC: Sign: Print: Seal: 1P157 Examiner Structural Review LZOZ '60 J0go100 13oJ0x3 uo4sc ww00 hyo 4.fs • 9086P DO # uo:sslwwoo of qnd AieloN-eppoi j 4o ale3$ as Zoning Clerk Proposal # JV & VR Services Corp Est Sheet JV & VR SERVICES CORP cACos7o11 1097 Shotgun Road, Sunrise FL. 33326 Ph: (954) 548-8111 )Project Name: Dunkin Donut Plan Date: Atte.Mion: N�re Venttwa By. Eddie Deffino Project Location: 9545 NE 2nd Av Niami Pian Pages: General Contractor. Ventura Architecture & Shores FL Development Bid Date: 1W28/2017 Engineer. G.C. Address: G.C. Phone/ Fax Total: $ 3,500 INCLUDED ITEMS The installation of walk-in cooler/freezer a• • • - bor only. The walk in cooler/freezer combo shall be provided owner •• •• � O DDD f ' • • • • •• • • e • • • • • • • •• •• • • • • • . • • . •. •• • 1 �1 ; - .®�1 E� 0� r. • 41000 • •• •• • • • • • • •• . • EXCLUDED ITEMS I Rices quoted are valid for 30 days from the date this proposal. Net price includes any and all rebates. pricing is per machanickolam and division 15 saecifieations unless specifically noted otherwise. Ae prices based on materials as scheduled or equals and are contingent on the mechanical engineer's approval. At material is guaranteed to be as specified. AH work to be completed in a workmanlike manner according to standard practices. Payments are to be made as project progresses unless specifically indicated above. Any alteration or deviation from above specifications involving extra costs will be executed only upon written orders, and wile become an ware charge over and above the estimate. All agreements contingent upon strikes, accidents, or delays beyond our direct control. Owner to tarty fire, tornado, and other necessary insurance. Our workers are fully covered by Workman's Compensation Insurance. Acceptance of Proposal - The above prices, specifications and conditions are satisfactory and are hereby accepted_ You are hereby authorized to do the work spec lied. Payment will be made as outlined above. Date of Acceptance / D --Z. g' --/ 7 e - Signature Page 1 of 1 "Kolpak anitowoc Walk-in Division Order Summary: (1) Dunkin Brands INDOOR :Walk In Cooler/Freezer (2) 'Refrigeration Quoted as Pre -Charged Remote (3) 'Line Length for Pre -Charged Line systems 50 (4) Exterior Finish : z6ia EMBOSSED GALVALUME (5) Clearance required from top of box to ceiling : isee below for clearance'r (6)_Clearance required around the perimeter of the box' 2" (7)_,DOOR SIZE L36} (8) Watkin Voltage/Cycle/Phase: 115V/60/1 -phase (9) Refrigeration Voltage/Cycle/Phase: 208/230-60-3 (10) Manufacturing Lead time 15 Business Days (11) Transit time 5-6business days (delivered from MFG to site) (12) Watkin Installation by : (GC or Equipment Consolidator) (13) Refrigeration Installation/Start up by: (GC or Equipment Consolidator) Final connection required by GC hired refrigeration (HVAC contractor) Manufacturer Warranty 2 Year Parts and Labor — 5 Year Extended Compressor 24 Hour Service Hotline 800-225-9916 v II IEVX� ► SI7E I l� -D 6 9' 0" Quotation #: A098064 Rev. 5 Date: 11/30/2017 Project: Dunkin Donuts PC #356863 Cooling Controls, Inc 3111 SW 138th Ave Miami, FL 33175 (14 mi) (305) 226-8651 y'oel@coolingcantroisinc.com Danart AC & Refrigeration 12103 SW 114th PI • Miami, FL'3`3111; (13 t '• (305) 66l- . • •• • •• • • •••• • x 7'-0" x 20' 0' • • ••••••• • � • • •• •• •• • •• S_ 1;' 11' 0' 10' 6' • • • • • •• • COOLER +35 Polar Pak Refrigeration - Mlnimum of 38.5" clearance required for Installation, Service and Airflow FREEZER -10 .• •• • • • • • •• • • • ••• • • • •• Pre -Charged Line Refrigeration (Pre -assembled Remote) - Minimum of 24" clearance required for Installation, Service, and Airflow • • Drawing 1 - Indoor / Outdoor Polar Pak Refrigeration x GC Approval Date Franchisee Approval Date Drawing 2 - Indoor / Outdoor Pre -Charged Line Refrigeration • -151 inti ll;l //-' 1 "• in 't _ ac o x+x x u) I0 J y 1410"_ =m=== =_ __� r- 4a 4am L —4!' M14110. - I QM ® COOLER +35 Polar Pak Refrigeration - Mlnimum of 38.5" clearance required for Installation, Service and Airflow FREEZER -10 .• •• • • • • • •• • • • ••• • • • •• Pre -Charged Line Refrigeration (Pre -assembled Remote) - Minimum of 24" clearance required for Installation, Service, and Airflow • • Drawing 1 - Indoor / Outdoor Polar Pak Refrigeration x GC Approval Date Franchisee Approval Date Drawing 2 - Indoor / Outdoor Pre -Charged Line Refrigeration • SHOP DRAWING DOCUMENT REVIR`�l These documents have been reviewed for conformance ;:pith the design concept and intent, and general compliance with the contract documents. The Contractor is responsible for conforming and correlating all quantities and dimensions, fabrication and construction methods, and coordination of this trade with other applicable trades. No changes in contract sum .re authorized unless stated in a .separate letter or of ; nge order. APPROVED NO EXCE MAKE CORRECTIONS REJECTED ' SUBMI TIONS TAKE NDICATED ••• • • • ••• • • •• • • • • • • • • • • • • • • •• •• •• • • • • • • ••• • • • • • • • • • • • 4100 • • • • *00 • • ••• • ••• • • • •• • • •• • •• • • •• • • • • • • • • • • • • • • • • • • .•. • • • oche •• ••• •• • • • •• • • • • • • • • 000 • • • • • •• r. • . ••• • • • ••• •• •• • • • •• •• • • • • • • • • • • • • • • ••• • • • • • • • • • • • N • • • • • • • DIMEI4DSA7 LMirk SIZE••: 20'-0" x 7'-0" x 8'-6.25" .. .. •• • •. • • • • • • • • • • • • • • • • • • • • • • •-- 9,_0" CV 0,s•• • • • • • • • ••• • 11'-0" •• •.• •• • • • N1%18113 d1211S AWN 11111 02 •� , 42IC II I II I 'InI OWI 11 JI 11 91 11.I 11 I II mI II "1-1 II 1 II 1 Ll'-= / 421C i. 7 —45 MN. CLEAR - .• • • • ••• •• COOLER +35 / FREEZER -10 SI‘;011.V1,l;llH -1ya00-3d TlV 1-.11M 314 I ls-?tNJO ld:a`C1CSI LOCKS AT 11.5' ;. SpiacI Jf cN\ ik7 �_d3C Lh'i L' acs REFRIG: AIR COOLED / PRE -CHARGED LINES SCROLL PCL248LZOP-3E 2-1/2hp R -448A 208/230-60-3 12.3 AMPS L=33', W=40 1/8',H=22 1/4',LBS.=213 INCLUDES FAN CYCLE CONTROLS KEL26-066-2EC-PCL-8 EVAPORATOR 208/230-60-1 9.8 AMPS L=43.625', W=15.5',H=16.75',LBS.=55 50' PRE -CHARGED LINES OUTDOOR PACKAGE 50' WIRING HARNESS 12' 230v HEATED DRAIN LINE KIT SCROLL PCL68MZOP-3E 3/4hp R -448A 208/230-60-3 12.8 AMPS L=33', W =25 1/2',H=19 1/4',LBS.=169 INCLUDES FAN CYCLE CONTROLS KAM16-066-1EC-PCL-8 EVAPORATOR 115-60-1 0.8 AMPS L=27.125", W=15.5',H=16.75',LBS.=50 50' PRE -CHARGED LINES OUTDOOR PACKAGE 50' WIRING HARNESS O Z ce Z A098064R5 - U z DEALER, HATCH-JENNINGS PROJECT, DUNKIN PC #356863 MIAMI, FL Y 0 -J O Y WALK-INS 421B < 421A > 48' 1810 LED I �-NZ rc-- 48 1810 LED 2 ,<.,--3,,. N t% !'I n�06.2s G o J 421B > <421A COOLER +35 / FREEZER -10 SI‘;011.V1,l;llH -1ya00-3d TlV 1-.11M 314 I ls-?tNJO ld:a`C1CSI LOCKS AT 11.5' ;. SpiacI Jf cN\ ik7 �_d3C Lh'i L' acs REFRIG: AIR COOLED / PRE -CHARGED LINES SCROLL PCL248LZOP-3E 2-1/2hp R -448A 208/230-60-3 12.3 AMPS L=33', W=40 1/8',H=22 1/4',LBS.=213 INCLUDES FAN CYCLE CONTROLS KEL26-066-2EC-PCL-8 EVAPORATOR 208/230-60-1 9.8 AMPS L=43.625', W=15.5',H=16.75',LBS.=55 50' PRE -CHARGED LINES OUTDOOR PACKAGE 50' WIRING HARNESS 12' 230v HEATED DRAIN LINE KIT SCROLL PCL68MZOP-3E 3/4hp R -448A 208/230-60-3 12.8 AMPS L=33', W =25 1/2',H=19 1/4',LBS.=169 INCLUDES FAN CYCLE CONTROLS KAM16-066-1EC-PCL-8 EVAPORATOR 115-60-1 0.8 AMPS L=27.125", W=15.5',H=16.75',LBS.=50 50' PRE -CHARGED LINES OUTDOOR PACKAGE 50' WIRING HARNESS O Z ce Z A098064R5 - U z DEALER, HATCH-JENNINGS PROJECT, DUNKIN PC #356863 MIAMI, FL Y 0 -J O Y WALK-INS EQUIPMENT SCHEDULE • development inc t A VENTURA michael a. ventura 11870 w state rd 84 C-14 davie, florida 33325 AA 0 0 0 3 1 2 3 EQUIPMENT SCHEDULE EQUIPMENT te.uAthex, aEc'Inw .. a WASTE ea I f 11111- w . aa mew ••••14•1101•1 .� ETA. a 00, c. 0.• .1 ., as. WINN W. WV•10.109.305.1.0.013 WM. I011.06,10 WNW Yr 3W 34/7. 1101.1110.,50911100 .aw .,«.....« " 4. z ��__ �1 ' HIG11iISEATING HIGH SEATING 1 /J - , � � m..x. Tie ra F x. I T .ea I W.aMwaet� , °vole T ' arra«., . . . . < � e.. ...m ® r� / '®n,xn.p" ..ww.ex w . r.o..ae m::'mune ,' .► ® Kne• II V �� `- ( ,,[ ° �^° « ° ore .. e<, 1/100 •IlladeM111.140 16 TIMINVOMM. seem. army mita ir«,_, aro moues lo ...IT m`N.Y.Y.' ans. 3 Tile Flour Tbm,t �... ..,.e i =qWS I 1 I I'Id( , .asx.xas •.x..e. ..._. .. ••• Tei.._. .e,. , w :;: TO--- /la C t • , ♦ / , r O / ` I ..m • , , -r---�r-t II I ���. win. SIMea • • •• A R 0 0 1 6 1 5 2 • r U. 10 01111011.801811061119 4 WM., Mt O. OM la 31 WS ... _ 44 .44m44.444.44— II: Y0.91 `�[�� %I/' �• �'' OO • v" , « . . xcw•. o.�.ws.�< .•. �y e ©,, afi54r P / H` VOA • MI WI.. enurniumemoni roam ammo-----� —= — �� 1 ---• a- — !�16 TA s • \��..• , `2�`'�' S�DOO SWING AI • f • • • • • • • • • • • • •��.. ••{ RYTII • { •• " • • CO M ( 7 �— J �..L O co z w = CO Z - M Ili m 0- 0w..e_.0 MVO WTI. m , r,x..«s mw«s <aa.wreevua asn„«uw.t. •r w ,.m „m,•w.nrrw[ TY Floor Transition _- O �{--al '0��, ®' WM.. {rO w Tb s \�o E Team « ,me...m..a.._.x - / ,�i�a {�,?a Y L ® �I • 000 mw .s�..«n1x.,.r"m ....I..w, �.. tiaOTM rn _ J Imo.. 2-3 t j..8 I� FA 11111iO4 • } 9�g� -gyp4;, 04 0 .n[ .. a..,,.m. .....".. elle o.„R Ilii 1; ��tl7i+• 4 X • 1 i '�i ':[�7 ' WOW 1011/010•10000161.• .10 jilagp Pi �1 VIM . WSTIOLI <D�t G ••�• FF I ,o ;"OK I :I _, , .. ••• _.. Fa .101•00..1 e__ieombe.�014•0• o„®A SVP,X103.00.10.010 Imo, .wm_...x.mu_ •� v, a � ��' ql 1>tr�.i.ii '.■M■ �J Sink 1 Fimen 17 F.I : PMq I I �+ . I .. we«x .a.A�. a a Wt. ...... _ .,..: P'�' .... •ree_"anr.[n.w.. .J:.•� L s1 �` 3laylfl Xwa w• eer«.•a ......+.x1.n,w 0 .a.mo wawa 'aIle o I �,,,,.. T-0" ._........ e.. a...w. ® wore.. .«., ii o 1-1 S ��', d --iii, QNie_ yY�y�Yrl� 1� A� Aolei F,_411hole aX3Ao a3yDvDsal IS I 1 I I I I •M1ed Nalae.l3 1 . «,< ..m�..a ee,.....e,as,wa.m..w..a. aam.. .«»•• so , e..._.a mx.,vner.rle.w•.«ae wa.aw wens 1. - - - /RIM MOW mi. . • WO 010.01,111 M. IV ,,,..• I y '.' ( 1 - `--1 � 1. 2017 1 ,s.. • ..xrmwla.en.,wal..r wwncas,ew «o.. w .w.__[...w "' , m•.va . • r us. .ao.x •ee.em 01.013.11/0.• m,.x..dnv..xe«su III eine yr NOV ...:.m.,..� . M° : w�« _ � w [ 1046..603. W �LO el 7 iM.�5. EQUIPMENT PLAN A , V• VOTE: ` - — _ . «-......,.e,.....0 ,./ ,0 .weex,..,w..._..mw1 M. �.,.u.m.. ..wn. „ «.» ,.I.. se. ,x , „ Hwa, ' ( W. to Bos Schedule M Archie.* - -- xvrceiar. ..Pr.,snwW .a[x. �" zee. ` Wea n Sox Merlin .. ._... .1...as...w«, ,mw Colin /.�i.^•.hea MI heleal.a�lkas,la) 12.0' revisions: 0 1 O - 2 4 - 1 7 d Exterior a.es bat need to bowled? N/A REFER TO DUNKIN' BRANDS MULTIBRAND EQUIPMENT SPECIFICATIONS a w"°"" ` 0Extotr's Mescal sa,a.,•p Ms box, MA ` ON DUNKIN' BRANDS WEB SITE, http://extranef.dunkinbrands.wm, FOR a` ' _I'-_„„1. ,_______������M��I=IN ( DowelDmanlmameBca 2voXTaxe-T COMPLETE EQUIPMENT AND UTILITY INFORMATION. DUNKIN' BRANDS ,�,,,, „�, 'Rome[n..,sian 1To•xT-vxa-r /1 Y PRECEDENCE OVER DRAWINGS IN INSTANCE ` 'Cooler oasok.b voxnmxB-r703 \ (T]F1GONFLICT •. (, I ;XISTING CONDmoN-fm 1 2 - 1 6 - 1 7 11NGCONDmoN-fm 00 00.000. '�"�P �”erreareme•omns 00041 •Aliaoan CI WA 1 1 1 v 1 1 4 1 ..f i ... Y,`.. L. RE IEW w ,a FtISI ` Retgoalim System PmAasendad lm .awnn [au /7 Ref„watla, Location (It REMOTE) REMOTE ` ""°�"'"�""°""�"' "°" " .x. mos E "�P ]These (20pi2p) APPROVE: DATE 1 , Optional A¢e_.i.e Zy v. me 1311 .0.......5.0 ,,n.nm .< wz ` pyelo Pimp alWeide Odom alCooler YES INSTALLATION NOTES: ..-„-- _. __ _ -- /*mca.BeDan No -_ -__ - Drawn by: Pedro Seism ic ik Darn NO 1. EQUIPMENT SUPPLIER TO PLACE ALL NEW EQUIPMENT Specs`� .J o� co.dyM....., `� v� `� S`� `� `� onastenceofbat toMoor Dpckwound asteriaDat NO 2. GENERAL CONTRACTOR TO PLACE ALL EXISTING EQUIPMENT date: 12 -08 -1 7 'S8BMaNWidth °Mirki lft InenVnint,onnonskid mmyrwa.sahes QosrleegthandwMM Pim. note : P d dab reached Br •I Rush haloWa• h CorderAND 3. GENERAL CONTRACTOR TO MAKE ALL MECHANICAL, PLUMBING, pwdon nchon ELECTRICAL CONNECTIONS FOR ALL EQUIPMENT Refrigeration Not.: 1 w J M 0 s•BContained ReNpeamN.beth th•ctwwkytint and e. .t..ystemmonwa,tn.apofm.wrkM. 1/is system requires 2C d..oee bw.9.nthe Io cane bax and the ceiling logi Matknum can eruminl she is T x io DUCK CONNECT START tor' BY GENERAL CONTRACTOR (NO REFRIO'ECM NEEDED) Standard MINT OWN. new uskq mm mtp.n on Is r 4. THEASTERISKS'”"INTHE"ITEMNO."INDICATESTHATTHERE ARE MULTIPLE CHOICES AVAILABLE FOR THE RESPECTIVE PIECE OF EQUIPMENT OR MILLWORK. 5. IT IS UP TO THE FRANCHISEE AND/OR FIELD TEAM TO MAKE THE W 30X SCHI Remote SSB Contained R.If stn. hes the e.eyaala mounted on tap NM. walk n and the cm/Arran udtu wade. 11.9.90.0 ,.0Th 2900.1919.09 b.4*..o 919909 clIl. 00. d 91. cOl 0.hl. MmMwn canpsnlay sae Is T s 14 Cannot Escasd 504 91.0O Ito the Cada/Fmw.r.Pm-charged unes dptosdunpns. and. wick ascan.• keduded. START tor' SY REFiSG TEC{ Sud. Mg9 o(wek In Box using SM 1.rgemtlan I. Tr APPROPRIATE SELECTION FOR THE LOCATION 6. BEFORE ORDERING,VERIFY WITHDUNKIN'DONUTS C.N.BO.M. TO ENSURE THE RIGHT ( p(x ) IS ORDERED FOR THE IMAGE SELECTED KEW WALK IN Pre-Assembled Remote Refrigeration M. the compressor' remmry keeled and the eapaser is mantel imps the Week n. The system is prison. old requires . Min an .d law drain. T • me where Me boi Mg beleaed must h.. a m *,,,, M9X drV P1►choged Inas up to 50' lengths, and a peck disconnect am Unaided. NO Marko= cmgeuad size START UP BY REFRIG TECH Standard height of Welk In Bo using this letip.dim Is S r • • • T, • • • •• • • 1 • • • • •