Loading...
PW-09-1209Project Address F602 96 Street Miami Shores, FL Miami Shores Village 10050 N.E. 2nd Avenue Miami Shores, FL 33138-0000 Phone: (305)795-2204 Permit Permit NO. PVII-7-09-1209 Perrot Type: Public Works Work Classification: Public Works Perrnit Status: APPROVED Issue Date: 8/20/2009 Expiration: 11/18/2009 Parcel Number Applicant 1132060141410 Block: Lot: MIAMI SHORES PRESBYTERIAN Owner Information Address MIAMI SHORES PRESBYTERIAN CHURC 602 NE 96 ST MIAMI FL 33138-2742 Phone (305)754-9541 Cell Contractor(s) FLORIDA SOL SYSTEMS INC Phone Cell Phone Approved: In Review Comments: Date Approved: : In Review Date Denied: Type of Construction: DIRECTIONAL BORE Stories: Front Setback: Left Setback: Plans Submitted: Certification Date: Bond Return : Occupancy Load: Exterior: Rear Setback: Right Setback: Certification Status: Additional Info: Classification: Commercial Fees Due CCF Education Surcharge Permit Fee Scanning Fee Technology Fee Total: Amount $13.20 $4.40 $1,790.00 $12.00 $44.75 $1,864.35 Invoice # PW -8-09-35678 Check #: 0041442 Total Amt Paid Amt Due $ 1,864.35 $ 1,864.35 $ 0.00 For Inspections please call: (305)762-4949 Available Inspections: Inspection Type: Final PE Certification Window Door Attachment Tie Beam Slab Termite Letter Framing Store Front Attachment Insulation Drywall Screw Window and Door Buck Ceiling Grid Fill Cells Columns In consideration of the issuance to me of this permit, I agree to perform the work covered hereunder in compliance with all ordinances and regulations pertaining thereto and in strict conformity with the plans, drawings, statements or specifications submitted to the proper authorities of Miami Shores Village. In accepting this permit I assume responsibility for all work done by either myself, my agent, servants, or employes. I understand that separate permits are required for ELECTRICAL, PLUMBING, MECHANICAL, WINDOWS, DOORS, ROOFING and SWIMMING POOL work. OWNERS AFFIDAVIT: I certify that all the foregoing information is accurate and that all work will be done in compliance with all applicable laws regulating construction and zoning. Futhermore, I authorize the above-named contractor to do the work stated. September 08, 2009 Authorized Signature: Owner / Applicant / Contractor / Agent Building Department Copy Date September 08. 2009 1 FTTCS-SITE 6MD1113A PRESBYTERIAN CHURCH 602 NE 96TH ST, MIAMI, FL 33138 001 OF 005 TO 004 OF 005 PLANS & PROFILES 005 OF 005 DETAIL MIAMI SHORES VILLAGE RIGHT OF WAY LOCATION MAP N.T.S. FEC RIGHT OF WAY F.D.O.T. RIGHT OF WAY 004 OF 004 003 OF 004 002 OF 004 001 OF 004 OVERVIEW N.T.S. DIRECTION OF ENGINEERING. N FDRSIANON ON 1149 DOCUNOTT 19 PROPIET Rf AND OWL NOT B E USED, CalEDD, REPRODUCED OR DISCLOSED N .POLE OR 94 PART NRHOUF BATTEN cceisort OF FPL FI ER ET • • MM'L BERNET. LLC mimic FLAGTSIZ•St • FPC •. • : .. PAW. FL 33174. • FI .LLC NOC i X66-551'r21SK .... . • .•.. •. ..•. . •. . . • • .• .. . . ••• . •. •. . .•.. . . ...• • .. •. . •.. • • . . UNIT OUANf11Y REVISIONS/APPROVALS DATE DESCRIPTION INRUL co+nb: MIAMI DADE ab: MIAMI SHORES Township: 53 Rang= 42 s«uon: 06 PROJECT: FTTCS—SITE 611D1113A PRESBYTERIAN CHURCH OSP-Eng: BOY LOPEZ (606) 202-1307 APPV BY: PROJECT COOS: 7349-110-027MCI DRAWN BY: APPROVED ORIGINAL ISSUE SCALE: N.T.S. MD -7349-110-027 COVER O O O+ N O z O O w< wI— S N Nw w? W J N U 1— O / /' 47 ;,/ 5� / 5 EO DIRECTIO�BOR� 5// i / IyySTALL 4-1.5' ,-(OPE// _� ----r�— QNDUil'S do Auu: �T" , F.O.C. FOR FPL F,1BERNET / / (48' MINIMUM C01t�_ FlBERT RISER // ,/ / e/ / FN MARKER' / 0-1-00//' Y / / / ; / / / /Y/ 59 EXISTING FIBERNET FIBER OPTIC CABLE CONDUIT NOTE: MAINTAIN A MIN BENDING RADIUS OF 5' ON ALL DUCT CONFIGURATIONS TOTAL UNDERGROUND THIS SHEET : 110' DIRECTIONAL BORE = 110' PL. 2-1.5"HDPE E/W PULL ROPES CONSTRUCTION NOTES: — RESTORE ALL SURFACES TO EQUAL OR BETTER CONDITION. — VERIFY ALL MEASUREMENTS AND DISTANCES. — FOR COORDINATION CONTACT EDDY LOPEZ: (305) 202-1337 NE 96TH ST ASP-1IALT� 40 EXISTING FlBERNET FIBER OPTIC CABLE RO INSTALL 24"WX36"LX30'1) HANDHOLE FOR FPL FlBERNET (LEAVE 100' COIL) RING CUT PULL EXISTING AERIAL COIL INTO NEW HANDHOLE AND SPUCE 1-24CT F.O.C. TO EXISTING FIBER, INSIDE NEW HANDHOLE FOR FPL FlBERNET. USE FOSC 450D SPUCE CLOSURE. (LEAVE 100' COIL) ALCATEL 3B13NT-432-03-2001 STA. 0+00 NORTH: SPLICE: SLACK COIL: 100' ADDC-024—LT-06—DR-09—OFNG STA. 0+00 NORTH: SPLICE: SLACK COIL: 100' 0+00 REMOVE AERIAL SLACK,CLEAT DOWNPOLE, PLACE STACK IN NEW FN HANDHOLE 0+00 PLACE 1-4" PVC U—GUARD AND U—GUARD BOOT 0+06 REMOVE & RESTORE 50 SQ. OF CONCRETE SIDEWALK 0+06 NEW FPL FIBERNET HANDHOLE 0+06 START DIRECTIONAL BORE WEST 335' DIRECTION OF ENGINEERING. INFORMATION ON THIS DOCUMENT IS PROPiEETMY NO SNAIL NOT BE USED. aPin. REPRODUCED OR DOOMED ED N MOLE OR 54 PART MRNOUT MERFN COGENT OF EFL RBER ET •••• • FPL • L • • •• • • • WAW, FL 33174• • • • • FIBFP1t�lEaT� LLC • • • • • • •' . NOC 1-866-55;-4237• • •••• • • • • •••• • • • •• •• • • • • • • • • • • •• • ••• • • • •• • •••• • • •••• • •• • • • •••• • • •• • • • • UNIT QUANMY REVISIONS/APPROVALS DATE DESCRIPTION INITIAL County: MIAMI DADE Ctb: MIAMI SHORES Tor/11016p: 53 Range 42 S.ctlon: 06 w0 cno o wo + V)0 ALCATEL 3613NT-432-03-2001 ADDC-024—LT-06—DK-09—OFNG 50' 50' ALCATEL 3613NT-432-03-2001 OD' NEW FPL FN HANDHOLE PROJECT: FTTCS—SITE 6HD1113A PRESBYTERIAN CHURCH OSP-Eng: E00! UW12 (306) 202-1337 APPV eV: PROJECT CODE 7349-110-027 DRAWN 0!: 11001 APPROVED ORIGINAL ISSUE: SCALE: 1 "=50' MD -7349-110-027 001 OF 004 EXISTING F.O.C. FOR FPL FlBERNET AB INSTALL 247Wx36"Lx30"D HANDHOLE FOR FPL FlBERNET (LEAVE 100' COIL) T.AB•I 60.0' EXISTING F.O.C. FOR FPL FlBERNET 120.0' 60.0' BIS YNE BLVD. GRADE LEVEL 9.00 8.00 7.00 6.00 5.00 4.00 3.00 2.00 1.00 0.00 — 1.00 — 2.00 —3.00 —4.00 — 5.00 t OT oT QIT r s 0 INSTALL 4 1.57 HOPE CONDUITS & • 1-24CT FOR . L FBERNET F 0.C. (12 0" MINIM M COVER). 0+00 1- rn 03 p W z O QO =m J W Z cO m~ U tz ap z WW M co M O O O O ++ O O PROFILE — NE 96TH STREET HORIZONTAL SCALE 1 "=50' VERTICAL SCALE 1 "=5' 0+50 1+00 1+50 2+00 2+50 NQIE: ALL FACILITIES INDICATED ON THESE PRINTS WAS FURNISHED BY THE VARIOUS UTIUTY COMPANIES. NO GUARANTEES WERE GIVEN TO THERE EXACT LOCATION OR DEPTH. IT WILL BE THE CONTRACTORS RESPONSIBILITY TO LOCATE ALL UTILITIES PRIOR TO ANY CONSTRUCTION ACTIVITIES. Mom - DIRECTION OF ENGINEERING. NFOR M110N ON 116 DOCUMENT Ei PROPRErAM' MD MOLL NOT 6E USED, COPED, REPRODUCED OR =LAMED 0104W ORM PARI 71T11OUT WRMET1 COMM OF FPL MENET • FPC. ••• • FI.T. LLC • •..• • • •.•• • • •• •• • • . • • • • • • • •• • • FPL 1 BERNET, • nee w. FLAG1 t • . W(IAW, FL 33174. • • • NOC i66-553-4237 • • • • .•• • • • •• • •••• • • •••• • •. • • • •••• • • •• • • UNIT QUANMY REVISIONS/APPROVALS DATE DESCRIPTION INITIAL Caw*: MIAMI DADE ab: MIAMI SHORES Township: 53 Range: 42 Section: 06 PROJECT: FTTCS-SITE 6101113A PRESBYTERIAN CHURCH OSP—Eng: EDDY LOPEZ (306) 202-1337 APP/ EIY: PROJECT 000E 7349-110-027 DRANO BY: WOO APPROVED ORDINAL ISSUE: SCALE: 1"=50' MD -7349-110-027 PROFILE_001 40 0 CONDUIT NOTE: MAINTAIN A MIN BENDING RADIUS OF 5' ON ALL DUCT CONFIGURATIONS TOTAL UNDERGROUND THIS SHEET : 655' DIRECTIONAL BORE = 655' PL. 2-1.5"HDPE E/W PULL ROPES CONSTRUCTION NOTES: — RESTORE ALL SURFACES TO EQUAL OR BETTER CONDITION. — VERIFY ALL MEASUREMENTS AND DISTANCES. — FOR COORDINATION CONTACT EDDY LOPEZ: (305) 202-1337 MAINTAIN MINIMUM 12" SEPARATION BETWEEN PROPOSED FPL FIBERNET DUCTS & EXISTING UTILITIES DIRECTIONAL BORE INSTALL 2-1.5" HDPE CONDUITS & PULL 1-24CT F.O.C. FOR FPL FIBERNET (48" MINIMUM COVER). ROW— - - ROW— EOP ROW— REMOVE & RESTORE 40SQFT OF GRASS AREA TO EQUAL OR BETTER CONDTIION ROW— ROW— U1 W 3 0 CO -J Z 0 sr0 0 CX GI TI Z 5cre:04, COCW a M M M M M M BORE PR PROPOSED TIE IN ROW— DIRECTIONAL BORE INSTALL 2-1.5" HDPE CONDUITS & PULL 1-24CT F.O.C. FOR FPL FIBERNET (48" MINIMUM COVER). ROW.. EOP- 60 EOP —E0 E0 1 I , T EOP BOP 0 -----+------( - ---- a a—ori0 - I I I I I 1 1 I I 03 EOP E0P- - M -- -- -- -NE -96Tk�ST- (ASPHALT) EOP.--E0 EO E0 E0 E P --Eo EO E0 O J03 J03 ,Oa J03 J03 EO E0 E EO PEO E EO ea a 8 0' ROW— Fi to M1ii : • 842 / op o +L —O Z o O (flF- L,1 w w Z J(/) = w W U Q Q DIRECTION OF ENGINEERING. INFORMATION a1 NIS ',acumen' IS PROPRIETARY NO SHALL NOT BE USED, COPED, R PRODUCED OR DISCL0911 N WHOLE OR N PART YR111OUT ARUM CONSENT OF FPI menu • • • •• • FPL FIBERNF4T4.J FPL•?I bRN• ET. LW • • 9260.1. FIAGLER ST. 1QAM1? t 83I74. NOC 1466-553-423,7• • •••• • • •••• • • •• •• • • • • • • • • • • •• • • • • ••• • • • •• • •••• • • •••• • •• • • • •••• •••• • ••• ••• ••• • ••• • •• • • UNIT QUANTITY REVISIONS/APPROVALS DATE DESCRIPTION INITIAL County: MIAMI DADE city: MIAMI SHORES TowaehIgn 5.3 Rage: 42 Section: 06 ADDC-024-LT-06-DK-09-0FNGSEE SHEET W0 NO 0 Wo + N O PROJECT: F1TCS-SITE 611D1113A PRESBYTERIAN CHURCH OSP-Eng: EDGY LOPEZ (305) 202-1337 IPPV BY: PROJECT COOS: 7349-110-027 DRAIN BY: WDa APPROVED ORIGINAL ISSUE SCALE: 1"=50' MD -7349-110-027 002 OF 004 • •• • .. •• • • • • • •• • 9.00 8.00 7.00 6.00 5.00 4.00 3.00 2.00 1.00 0.00 - 1.00 - 2.00 - 3.00 - 4.00 - 5.00 DIRECTIONAL BORE INSTALL 2-1.5" HDPE CONDUITS & PULL 1-24CT F.O.C. FOR FPL FIBERNET (48" MINIMUM COVER). REMOVE & RESTORE 40SQFT OF GRASS AREA BORE PIT VW./ NE STH AVE (ASP ALT) CTO EQUAL ONDITION OR BETTER PROPOSED TIE IN [LEVEJ. a I z z � E c co Y t T o" 0 a DIRECTIONAL 3ORE Ow TIN CON INSTALL SI do 2-1.5" BULL 1 `IDPE 4C— F.O F.O . (41' OR IPL MUM FIB C NE— ). OC UIRELfluNnl BORE -MIN ALL 2-1.5" HDPE CON) F.O.C. . & OR PULL FPL 1-24CT FIBERNET (48 MINIMUM COVER). +10 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+50 e— co - W La 5 3 W W 0 O m m J • Z ZZ 0 O V ▪ W a' Crag 0 z ZOW I'') W mm PROFILE — NE 96TH STREET HORIZONTAL SCALE 1 "=50' VERTICAL SCALE 1"=5' ALL FACILITIES INDICATED ON THESE PRINTS WAS FURNISHED BY THE VARIOUS UTILITY COMPANIES. NO GUARANTEES WERE GIVEN TO THERE EXACT LOCATION OR DEPTH. R WILL BE THE CONTRACTORS RESPONSIBILITY TO LOCATE ALL UTILITIES PRIOR TO ANY CONSTRUCTION ACTIVITIES. DIRECTION OF ENGINEERING. *FORMATION ON 1H5 DOCUMEIR 15 PROPlE111RY AND 91ILL NOT B E USED. OOPED, REPRODUCED OR DISCLOSED N WHOLE OR 11 PARI 1NRIDUT MIEN CONSENT OF FPL FEFIEET ® • • • •• FPL FIBERNhTy24.0 .••• • • •••• • • •• •• •••• • • •••• •••• FPL MEWL LLC 926b•t.• GLER ST. MIAMI. tFli 38174' • •' .• NOC 1-866-553-4 r' • • . ... • • • •• • •. • •••• •. • • • •••• • • • .• . • .• • • • ..•• •• • •• • •• •..• • •.. ••• •.• • ••• • e • UNIT QUANTITY REVISIONS/APPROVALS DATE DESCRIPTION INITIAL Count MIAMI DADE Clt, MIAMI SHORES Township: 53 Rcnge 42 Section: 06 PROJECT: FTTCS-SITE 61ID111SA PRESBYTERIAN CHURCH OSP-Erg: 1100Y LOPE (300) 202-1337 APPv BY: PROJECT CODE 7349-110-027 DRAWN BY: woe APPROVED ORIGINAL ISSUE SCALE: 1"=50' MD -7349-110-027 PROFILE_002 . • • •. • • .. • • 0 0 LL + 0 M OZ 0 0 • wv, ✓1 w wZ N O 1— a CRO SING 27617F ID LOCATE AT 359 2287 MILE POST 100.0' FEC ROW MAINTAIN MINIMUM 12" SEPARATION BETWEEN PROPOSED FPL FIBERNET DUCTS & EXISTING UTILITIES — RESTORE ALL SURFACES TO EQUAL OR BETTER CONDITION. CONSTRUCTION NOTES: REMOVE & RESTORE 40SQFT OF GRASS AREA TO EQUAL OR BETTER CONDITION 11 W W W 0O 0 m CD 0 J Z Z z2 O V La.La SEX ao G L` z ZL4Laco Z Lai C•1 Z m CD 01 01 + + + 0 O 0 — VERIFY ALL MEASUREMENTS AND DISTANCES. — FOR COORDINATION CONTACT EDDY LOPEZ: (305) 202-1337 DIRECTIONAL BORE INSTALL 2-1.5" HDPE CONDUITS & PULL 1-24CT F.O.C. FOR FPL FlBERNET (48" MINIMUM COVER). CONDUIT NOTE: MAINTAIN A MIN BENDING RADIUS OF 5' ON ALL DUCT CONFIGURATIONS TOTAL UNDERGROUND THIS SHEET : 633' DIRECTIONAL BORE = 633' PL. 2-1.5"HDPE E/W PULL ROPES BORE PIT PROPOSED TIE IN INSTALL 24"WX36"LX30"D HANDHOLE FOR FPL FIBERNET (LEAVE 100' COIL) REMOVE & RESTORE 40SQFT OF GRASS AREA TO EQUAL OR BETTER CONDITION fl W w W W O O m m J J z ZO 0 0 O W W OC IX a. o o z W zow* WE CO (`I U3CO 00 1.0 n n n — ROW— ROW— ROW..... R ROW— may___-m_-_�y___�-__ IRE 9.6 HIS.R __ (ASPHALT) EOE—EOr EOP-�E r 750 i 760 766 j 790 • %h. e 4-i , tIL•�:' DIRECTIONAL BORE INSTALL 2-1.5" HDPE CONDUITS & PULL 1-24CT F.O.C. FOR FPL FIBERNET (48" MINIMUM COVER). Ln 0 +Il ro N O0 1— .. N1— w UJw Z_ J = w w (..)- N DIRECTION OF ENGINEERING. NFCI•N1ION ON DRS DOCUMENT PROPRIETARY NO SWILL NOT 6E USED. COPED. REFRODUCED OR DOOMED N UNCLE OR N PNU % OUT VICTIM CORLIEIU OF FPI. F1U10ET •••• • FPL • 1Q MGM Sly • • • FPL • • • • • mai. FL 33174* • • • FIBFW46T& LLC • • 1-866-55-4237• •••• • • •••• • • •• •• • • • • • • • • • • •• • • • • ••• • • • •• • •••• • • •••• • •• • • • ••• • • • • •• • 4 •••••f • 1 UNIT QUANTITY REVISIONS/APPROVALS DATE DESCRIPTION INITIAL Comb: MIAMI DADE City: MIAMI SHORES Township: 53 Range 42 swum: 06 ADDC-024-LT-06-DK-09-OFNG rn 0 0 NEW FPL FIBERNET HANDHOLE ADDC-024-LT-06-DK-09-OFNG PROJECT: FTTCS—SITS 6MD1113A PRESBYTERIAN CHURCH OSP-Eng: BOY LOPEZ (206) 202-1557 APPV HT: PROJECT CODE: 7349-110-027 DRAWN BY: w6a APPROVED ORIGINAL ISSUE: SCALE: 1 "=50' MD -7349-110-027 003 OF 004 GRADE GRADE LEVEL 80.0' CLUB DR (ASPHALT) EEQ CROSSING 27617F ID # LOCATE AT 359 2287 MILE POST 100.0' FEC ROW PTS T1 TSF N C—o& RESTORE 40SQ FT. OF GRASS TO EQUAL OR BETTOR CONDITION REMOVE 40SQFT TO EQUAL 0 CONDITION k OF RESTORE GRASS AREA R ESTER \ INSTAL 24-Wx36-Lx30-D HANUHOLE-WR TML RBERNE (LEAVE 100' COIL) QIRECT10 INSTALL VAL BORE 2-15- HDPE CONDU F.O.C. FO R FPL FN (48 - MINI PFS .k PULL AUM COVER). 2 E Ow S FOC DIRECTIONAL BO INSTAL 2-1.5' H PE CONDUITS & PULL 1-24C- F .0.0 FOR FPL FN (48 M INIMUM COVER). 7+50 8+00 BORE - WEST 9+00 9+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 PROFILE - NE 96TH STREET HORIZONTAL SCALE 1 "=50' VERTICAL SCALE 1 "=5' 1— V! W 3 W 3 � W m=0 <ZZJ 2 z Z W tiO m V J W G a. m Z 0 W W Z m Z 4 07 O7 O O O O O O 9.00 8.00 7.00 6.00 5.00 4.00 3.00 2.00 1.00 0.00 1.00 2.00 3.00 4.00 14+00 5.00 liQTE: ALL FACILITIES INDICATED ON THESE PRINTS WAS FURNISHED BY THE VARIOUS UTILITY COMPANIES. NO GUARANTEES WERE GIVEN TO THERE EXACT LOCATION OR DEPTH. IT WILL BE THE CONTRACTORS RESPONSIBIUTY TO LOCATE ALL UTILITIES PRIOR TO ANY CONSTRUCTION ACTIVITIES. DIRECTION OF ENGINEERING. /s0l•6OIOR ON TRIS DOCl3ENT IS PROPRIETARY ARO SOIL NOT BE USIM. COPA. REPRODUCED OR D6CLOSED W MIRE OR 14 MRr "amour M1IfER COGENT OF FPL F1BEIQET •••• 40 ' ni„ j BERNS$•Iis• • • 9266 W. FLAGLER 3�! FPL•e • ••tritn, YL 99174 • FI____ IT? LLC NOCr1-866-553-4237 • • . • • •••• . • •••• • • •• •• • ••• • • • •• • • • 1 • • • • • • • •• •••• • • • • ..•. • • • • • • •• • • •. • • • • seise UNIT QUANTITY REVISIONS/APPROVALS DATE DESCRIPIION INITIAL County: MIAMI DADE art: MIAMI SHORES Township: 53 Range: 42 s.cUon: 06 PROJECT: F1TC8-SITE 61ID1113A PRESBYTERIAN CHURCH OSP— APPY BY: Eny Off UM (301) 202--1337 PROJECT CODE: 7349-110-027 DRAWN BY: WDa APPROVED ORIGINAL ISSUE: SCALE: 1"=50' MD -7349-110-027 PROFILE_003 CONDUIT NOTE: MAINTAIN A MIN BENDING RADIUS OF 5' ON ALL DUCT CONFIGURATIONS TOTAL UNDERGROUND THIS SHEET : DIRECTIONAL BORE = PL. 2-1.51HDPE E/W PULL ROPES CONSTRUCTION NOTES: - RESTORE ALL SURFACES TO EQUAL OR BETTER CONDITION. - VERIFY ALL MEASUREMENTS AND DISTANCES. - FOR COORDINATION CONTACT EDDY LOPEZ: (305) 202-1337 C MAINTAIN MINIMUM 12" SEPARATION BETWEEN PROPOSED FPL FIBERNET DUCTS & EXISTING UTILITIES ROW— ROW— INSTALL 24"WX36"LX30"D HANDHOLE FOR FPL FIBERNET. (LEAVE 100' COIL). ROW— W W EX O= m G J Z N Z== 0Z 0 U1`la �arZ I - 01`'Z 0 C Ww Zm HO M M M (t)11(0(0 ROW— REMOVE & RESTORE 70SQFT OF CONCRETE SIDEWALK TO EQUAL 0 BETTER CONDITION 1- u) W W W 0 m J Z 0 Cal 0 C W Oaf Z w0 0 0 off m in w — M M M PAP ROP .:OP ROS—For EOP O p0pp 0 /0a 0a_d0a N E ROP E 1—R0/ RO (ASPHALT) Ror--so Oa�0a�0a�0/ /0 w R0 EOP 0 / REMOVE & t�EsSTTOR • /REMOVE OF, RASS i AREATO EQUAL OR / /BETTER 50NDMON DIRECTIbNI�L BORE / L Ag -'LEONDUNS - F.O.C. FOR IPL FIBERN"' (48" MIIRIM JM C q / INSTALL 1,. HDP & BORE PR PROPOSED TIE IN ). EO R0 ROW-- j 21+90 END EXISTING CONDUIT 21+90 NEW FPL FIBERNET CABINET REMOVE & RESTORE 200SQFT OF CONCRETE SIDEWALK TO EQUAL OR BETTER CONDITION 6.01.0414D TRENCH.''=_-- 16+9t` MORE PIT 16+90 BEGIN DIRECTIONAL BORtz40 %, K^' BENCH 100' INSTALL 2-1.5" HDPE CONDUITS & PULL 1-24CT F.O.C. FOR FPL FIBERNET (36" MINIMUM COVER). j� 602 PULL 1-12CT F.O.C. THROUGH EXISTING CONDUIT FOR FPL FIBERNET 1, / �/ (14)��7+90 .� �/ 17+90 E CI / 17+90w°BE DIRECTIO INSTALL 2 IRECTIONAL BORE SOUTH CONDUITS F o UIFOR P FPL FIBERNET HANDHOLE W/ FILTER .C. MI�MUM IN EXISTING CONDUIT REMOVE & RESTORE 70SQFT OF CONCRETE SIDEWALK TO EQUAL OR BETTER CONDITION SPUCE 1-12CT F.O.C. TO NEW 48CT F.O.C. INSIDE HANDHOLE FOR FPL FIBERNET. USE FPSE 4500 SPUCE CLOSURE. (LEAVE 50' COIL) ALL 24"WX36"LX30"0 DHOLE W/ FILTER FOR FPL FIBERNET (LEAVE 100' COIL) 'no O O +w 0 Z N O Q O (/)1- w ww Z_= J =w DIRECTION OF ENGINEERING. INFORMS= 0 TO DOCUMENT 6 PROPRIETARY NO SHALL NOT HE USED, COPED, REPR00UCED CR0°EDPART EO OPOLE OR W1 coma. W FPL • •• • •.•- • FPL• • FIBEhNET, LLC • IF •••- • • • • • • • • • • •• • •••• •• • • • a •• • •• FPI?SLC • i $250jr. ST. • • •111+1(11 FL 33.17i • . • • • MC.1166-553-423? •• 7 • • •• •••• • • •••• • •• • • • •••• • UNIT QUANT IY REVISIONS/APPROVALS DATE DESCRIPTION INfTmiL County: MIAMI DADE ay: MIAMI SHORES Township: 53 Rang*: 42 suction: 06 CABINET ADDC-024-LT-06-DK-09-OFNG ?' ADDC-024-LT-06-DK-09-OFNG 5.00' ADDC-024-LT-06-DK-09-OFNG t0l+ NEW FPL FIBERNET CABINET 0 CO + FILTER NEW FPL FIBERNET HANDHOLE NEW FPL FIBERNET HANDHOLE O 1') + t0 �O W o = Ha NO CO W in V)o PROJECT: FTTCS-SITE 611D1119A PRESBYTERIAN CHURCH OSP-Eng: BOY L@Q (700) 2U2-1537 APPV BY: PROJECT COOS 7349-110-027 DRAWN BY: wga APPROVED ORIGINAL ISSUE: SCALE: 1 "=50' MD -7349-110-027 004 OF 004 0 oLn Lo L� o+ o Z o 0 w< uJI— = V) LA Z W V) 0 1--• ftse— DIRECTION OF ENGINEERING. I ARMON ON 1N3 DOCUMENT t5 PRONETMY AND 94 LL NOT BE USED. COPED. REPRODUCED ce DISCLOSED PI %RUE OR IN • PART warm CONDIT OF FPL FL Ej• •• • FPL*....(400:00 0000 04100 • FIBEI', LLC •• •• • 0000 • 0000 s••• • skip FPL• FIBERNE'C •41 C • • 9250 1. H AGI E ST. • • •105110, FL 33.17i. • • • • NOC 1166-553-*fl1 • ••- • • • • • • • • • • •• • •• • 0000 • • •0•• • •• • • • •••• •• • • UNIT QUANTITY REVISIONS/APPROVALS DATE DESCRIPTION INITIAL Coo MIAMI DADE Clb: MIAMI SHORES Township: 53 Rang*: 42 section: 06 PROJECT: FITCS—SITE 6101113A PRESBYTERIAN CHURCH OSP-APPV Br: Ena mor LOPEZ (306) 202-1337 PROJECT CODE: 7349-110-027 DRAWN BY: WINO APPROVED ORIGINAL AL ISSUE: SCALE: 1 "=50. MD -7349-110-027 PROFILE_004(1) -1 40' 40' PARK (ASPHALT) DR GRADE LEVEL --\ 9.00 ORc PIT nPosFn TIF IN g ` 8.00 z10 REMOVE 711S0 & FT REStO OF SID ALK INSTALL 30Wx49"Lx36'DSOFTOFGRASSAREAaOTTO 7.00 OVE Ac RESTORE TO EC EC UAL 10N OR 9 MATH FILTE0EQUAL °OND(iION C OR BETTCR6.00 �- � ^� � DELCS 5.00 4.00 o ow DIRECTIONAL INSTAI I 2— BORE 5' HDPF CONDUITS 8 FUJI 1-241T 3 00 F.O.C. FOR FPL FN (48" MINIMUM COVER,. W o 2.00 1.00 0.00 1.00 D ftECTIONAL BORE -2.00 INSTALL 2-1.5" HOPE CONDUITS & PULL 1 24CT FO.C. FOR FP_ FN (48" MINIMUM COVER). 3.00 -4.00 5.00 1-00 14+50 15+00 15+00 15+50 16+00 16+50 17+00 17+50 18+00 18+50 J I- cn wx to W 2 3 3 z W K =_ W 0 W 15 mm 0m m J <30 Q Z czo z o of USW W M—IX ILI a GW Z a aWZ W 5. �m10 Wmm MMM MMM 1D CO CD +++ .-.-.- PROFILE — NE 96TH STREET NQI ALL FACILITIES INDICATED ON THESE PRINTS WAS FURNISHED BY THE VARIOUS UTILRY COMPANIES. NO GUARANTEES WERE GIVEN TO THERE EXACT LOCATION OR DEPTH. IT WILL BE THE CONTRACTORS HORIZONTAL SCALE 1 "=50' \/�RTlrel crel 1 ''c'ANY RESPONSIBILITY TO LOCATE ALL UTIUTTIES PRIOR TO CONSTRUCTION ACTIVITIES. ftse— DIRECTION OF ENGINEERING. I ARMON ON 1N3 DOCUMENT t5 PRONETMY AND 94 LL NOT BE USED. COPED. REPRODUCED ce DISCLOSED PI %RUE OR IN • PART warm CONDIT OF FPL FL Ej• •• • FPL*....(400:00 0000 04100 • FIBEI', LLC •• •• • 0000 • 0000 s••• • skip FPL• FIBERNE'C •41 C • • 9250 1. H AGI E ST. • • •105110, FL 33.17i. • • • • NOC 1166-553-*fl1 • ••- • • • • • • • • • • •• • •• • 0000 • • •0•• • •• • • • •••• •• • • UNIT QUANTITY REVISIONS/APPROVALS DATE DESCRIPTION INITIAL Coo MIAMI DADE Clb: MIAMI SHORES Township: 53 Rang*: 42 section: 06 PROJECT: FITCS—SITE 6101113A PRESBYTERIAN CHURCH OSP-APPV Br: Ena mor LOPEZ (306) 202-1337 PROJECT CODE: 7349-110-027 DRAWN BY: WINO APPROVED ORIGINAL AL ISSUE: SCALE: 1 "=50. MD -7349-110-027 PROFILE_004(1) GRADE LEVEL REMOVE & RESTORE 70SQ FT OF SIDEWALK TO EQUAL OR BETTER CONDRION INSTALL 24"WX361LX30"D HANDHOLE FOR FPL FIBERNET. (LEAVE 100' COIL). BORE PIT PROPOSED TIE IN REMOVE & RESTORE 4050 FT OF CONCRETE AREA TO EQUAL OR BETTER CONDITION REMOVE & RESTORE 50SQ FT OF SIDEWALK TO EQUAL OR BETTER CONDITION INSTALL 24'WX36"LX30"D HANDHOLE WITH FILTER FOR FPL FIBERNET. (LEAVE 100' COIL). M f z BENCH INSTALL 2- 1.5' HD DJ J \_ �a DIRECTIONAL BORE �NSTALL2� 5—HDRECONDUITS._& PUI L F.O.C. FOR FPL FN (48" MINIMUM COVER: PE 1—Z ACT CONDUITS F.O.C. FOR & PULL FPL FIB 1-24CT ERNE1 (36" MINIM UM COVER). +00 14+50 15+00 PROFILE - PARK DR HORIZONTAL SCALE 1 "=50' VERTICAL SCALE 1"=5' 15+00 15+50 16+00 y0 Lam 3Z W < �= x 01_1- ta -IC H w OZo VW W cc1.1_1 ix a. oz ZW W- WZm� 000 +++ mm c0 16+50 17+00 _ 1- O 1/1 O m 1-= J oZ (/O) O 0 S V z �_ Sao 1 Z W OOC70 Z O W O W 07 07 .- 000 +++ 40 40 10 17+50 18+00 3 O O= yo W Q 0: = = G O Z .0=2 � 0 zee (9 Om Z F- W H U ccLAI a. W oL oaa z o3 5 ZW W W Z 03 00 0 Ol Ol 01 ++ + nn n 18+50 9.00 8.00 7.00 6.00 5.00 4.00 3.00 2.00 1.00 0.00 —1.00 2.00 3.00 4.00 5.00 =XL ALL FACILITIES INDICATED ON THESE PRINTS WAS FURNISHED BY THE VARIOUS UTILITY COMPANIES. NO GUARANTEES WERE GIVEN TO THERE EXACT LOCATION OR DEPTH. R WILL BE THE CONTRACTORS RESPONSIBILITY TO LOCATE ALL UTILITIES PRIOR TO ANY CONSTRUCTION ACTIVITIES. DIRECTION OF ENGINEERING. REDRVATION ON TES 000111E)R ▪ PROPIET/M' MO 94111 NOT IN USED. COPED. REPROOUCPD 0R mum IN"HOLE OR M' PMR MR1031 CONSENT OF PPL. • •. • • •••• • •••• •• • •• • • • FPL FIDERPISC.LTR • •• •••• 8250 N. FLAGLER ST. • FPL• • .. MOM FL 34,17‘„ FIBEItNET, LLC• • fr ,1 -G66 -553-'I f • •• •• • • . • • • • • • • • •• • .• • •••• • • •••• • •• • • • •••• .• •� • 1 • UNIT QUANTITY REVISIONS/APPROVALS DATE DESCRIPTION INRUL C•ui17: MIAMI DADE cry: MIAMI SHORES Township: 53 Rang*: 42 s.enon: 06 PROJECT: F1TCS-SITE 614DIIISA PRESBYTERIAN CHURCH OSP-Eng: 00Y LORI (306) 102-1337 APP/ BY: PROJECT 000E: 7349-110-027 DRAM BY: MOO APPROVED ORIGINAL ISSUE SCALE: 1 "=50' MD -7349-110-027 PROFILE_004(2) 7TH FLR ELEV. 100' 6TH FLR ELEV. 80' 5TH FLR ELEV. 60' 4TH FLR ELEV. 40' 3RD FLR ELEV. 20' 2ND FLR ELEV. 10' 1ST FLR ELEV. 0' NEW FPL FlBERNET CABINET SOUTH ELEVATION N.T.S. DIRECTION OF ENGINEERING. INFDRILANON ON THS DOCUMENT IS PROPRIETARY NC NOT muff PflH P NOF FPI. REIERNET • •••• •.•• ••• • •• • •.•• • ® •..• ...• FPL FIBERNEI; 41•C • ••• FPL ,in r. LLc 925G W. FLLGLER YM, FIb 85174. • • • . NOC 1-866 S3-423 r . • • . • • • • • . .. • •••• • • •••• • •• • • • •••• ••• • ••• • UNIT QUANTITY REVISIONS/APPROVALS DATE DESCRIPTION INITIAL . THE IAVA 1-800-432-4770 CcNt7: MIAMI DADE cb: MIAMI SHORES To.nuNp: 53 Rap•: 42 Section: 06 PROJECT: FTTCS—SITE WADI IISA PRESBYTERIAN CHURCH OSP-Enc BOY !OR (309) 202-1337 APpv BY: PROJECT CODE 7349-110-027 DRAWN BY: .Da APPROVED OR10941 ISSUE: SCALE: N.T.S. MD -7349-110-027 DETAIL 1 •• • • •• • •. • • 1 ••• • • • ••• • ••. • INSTALL NEW CABINET FOR FPL FlBERNET PROPOSED CUSTOMER CONDUIT SITE DETAIL - STEEPLE 6TH FLOOR N.T.S. DIRECTION OF ENGINEERING. INFORMATION ON MIS DOCUMENT 6 PROPRIETARY NO SHALL NOT BE USED, COPED, RRPROOIICED OR DISCUXED N MOLE OR N • PMT IWIEOUT WRIWEN CONSENT OF FPL • • n .• •• .4i• •• • •••• • •••• •• • • • FPL• FIBERNE1: •••• 40250 i. FLGLER ST. • FPI? •.• # !.Ma ?, FL 9i1't•• Mit -a66-553-21121 FIBERNET, LLC • • • • ••• • •• • • • • • • . • • • • • • •• • • •• •••,P • .. • ••i• • • • a •• • • • • • UNIT QUANTITY REVISIONS/APPROVALS DATE DESCRIPTION !NMI. Counb: MIAMI DADE Clb: MIAMI SHORES Township: 53 Range: 42 Section: 06 PROJECT: FTTCS-SITE 6MD111SA PRESBYTERIAN CHURCH /PPS BY: OSP-Eng: E DDY LOPEZ () 102-1337 PROJECT CODE: 7349-110-027 DRAWN BY: WOO APPROVED ORIGINAL ISSUE: SCALE: N.T.S. MD -7349-110-027 DETAIL 2 •••.• • • • . • • • • _••• •• • _• ii•• • • • .E•••••111 • • - •.• • � • •f_ Tt 1 !F7 Yal • 4:4 • 111u4 �•;••S.. • • • • • • • . • •.•. •• • NagTzmpfpjg JUL 2 1 Zppg -REKNIT :C, -am MIAMI SHORES VILLAGE APPROVED DATE ZONING STRUCTURJ,.. ELECTRICAL PLUMBING MECHANICAL BLDG. a04C �./'c' SUBJECT TO COMPLIANCE WITH ALL FEDERAL STATE AND COUNTY RULES AND REGULATIOt'