Loading...
RC-17-1488 (2)i , ,"........< t, Certificate of Completion Miami Shores Village 10050 NE 2 Ave, Miami Shores FL, 33138 Tel: 305-795-2204 Fax: 305-756-8972 Building Inspection Department This certificate issued pursuant to the requirements of the Florida Building Code 106.1.2 certifying that at the time of issuance this structure was in compliance with the various ordinances of the jurisdiction regulating building construction or use. For the following: Permit Type RESIDENTIAL CONSTRUCTION Bldg. Permit No. RC -6-17-1488 Owner JUAN DEL RIO Contractor ALZATE CONSTRUCTION INC Subdivision/Project NONE Date Issued November 27, 2017 Occupancy Construction Type V- B Load N/A Occupancy Square Footage 552 Type R-3 Description of INTERIOR RENOVATION Applicable 2014 FLORIDA BUILDING Work - - Code Location 123 NE 97 ST Miami Shores FL 33138 Building Officials Approval Not Transferable POST IN A CONSPICUOUS PLACE // ti'/% Ismael Naranjo, C 0 11.4:4 INSPECTION RECORD Miami Shores Village 10050 N.E. 2nd Avenue Miami Shores, FL 33138-0000 Phone: (305)795-2204 Fax: (305)756-8972 P•. T !NS TE Permit NO. RC -6-17-1488 Issue Date: 6/29/2017 ►on: Additionfi Expires: 12/26/2017 26/2017 INSPECTION REQUESTS: 1305)7624949 or Log on at https://bldg.miamishoresviUage.com/Cap REQUESTS ARE ACCEPTED DURING 8:30AM - 3:30PM FOR THE FOLLOWING BUSINESS DAY. Requests must be received by 3 pm for following day inspections. Residential Construction Owner's Name: JUAN R. DEL RIO Job Address: 123 NE 97 Street Miami Shores, FL 33138y Bond Number: 3443 Contractor(s1 ALZATE CONSTRUCTION INC (954)599-8434 Yes Phone Pri ary Contrac Parcel #:1132060132440 Owner's Phone: Total Square Feet: Total Job Valuation: 552 $ 17,500.00 • Ai, ORK IS ALLOWED: ONDAY THROUGH FRIDAY, 8:OOAM - 7:0OPM. r SATURDAY 8:00AM - 6:OOPM. NO WORK IS ALLOWED ON SUNDAY OR HOLIDAYS. BUILDING AND ROOFING INSPECTIONS ARE DONE MONDAY THROUGH FRIDAY. G Ofj TD C4- 1--01r 1*' 6(71' 02A-011 Te 0,4 ,_4voll NO INSPECTION WILL BE MADE UNLESS THE PERMIT CARD IS DISPLAYED AND HAS BEEN APPROVED. PLANS ARE READLY AVAILABLE. IT IS THE PERMIT APPLICANTS RESPONSIBILITY TO ENSURE THAT WORK IS ACCESSIBLE AND EXPOSED FOR INSPECTION PURPOSES. NEITHER THE BUILDING OFFICIAL NOR THE CITY SHALL BE LIABLE FOR EXPENSE ENTAILED IN THE REMOVAL OR REPLACEMENT OF ANY MATERIAL REQUIRED TO ALLOW INSPECTION. WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE COMMENCING WORK OR RECORDING YOUR NOTICE OF COMMENCEMENT. illilh�arsrrr..ru.�,�� INSPECTION DATE INSP INSPECTION RECORD Foundation Stemwall Slab Columns (1st Lift) Columns (2nd Lift) Tie Beam Truss/Rafters Roof Sheathing Bucks Interior Framing Insulation Ceiling Grid Drywall Firewall .0,41} 424> Wire Lath Pool Steel Pool Deck Final Pool Final Fence Screen Enclosure Driveway Driveway Base Tin Cap Roof in Progress Mop in Progress Final Roof Shutters Attachment Final Shutters Rails and Guardrails ADA compliance Soil Bearing Cert Soil Treatment Cert Floor Elevation Survey Reinf Unit Mas Cert Insulation Certificate Spot Survey Final Survey Truss Certification STRUCTURAL COMMENTS WINDOWS INSPECTION & DOORS DATE INSP Attachment FINAL - "'"m"'nftu F PUBLIC WORKS " INSPECTION DATE INSP Excavation' FINAL ELECTRICAL oil INSPECTION DATE INSP Temporary Pole 30 Day Temporary Pool Bonding Pool Deck Bonding Pool Wet Niche Underground Footer Ground Slab Wall Rough Ceiling Rou Roug A t',` Telephone Rough Telephone Final TV Rough ` TV Final Cable Rough Cable Final Intercom Rough Intercom Final Alarm Rough Alarm Final Fire Alarm Rough Fire Alarm Final Service Work Wit , rI ,- L ELECTRICAL //04- ' 'e COMMENTS INSPECTION DATE INSP Rough cram) Water Service 2nd Rough Top Out tee* Fire Sprinklers it I� If I �a- Septic Tank Sewer Hook-up Roof Drains Gas LP Tank Well Lawn Sprinklers Main Drain Pool Piping Backflow Preventor Interceptor Catch Basins Condensate Drains HRS Final FINAL /o11a PLUMBING COMMENTS INSPECTION K MECHANICAL DATE INSP Underground Pipe Rough Ventilation Rough Hood Rough Pressure Test Final Hood Final Ventilation Final Pool Heater Final, Vacuum MECHANICAL COMMENTS