RC-16-67BUILDING
PERMIT APPLICATION
//
�[ 13UILDING 1 I ELECTRIC
PLUMBING
JOB ADDRESS:
City:
Miami Shores Village
Building Department
10050 N.E.2nd Avenue, Miami Shores, Florida 33138
Tel: (305) 795-2204 Fax: (305) 756-8972
INSPECTION LINE PHONE NUMBER: (305) 762-4949
ROOFING
MECHANICAL 7PUBLIC WORKS
3/
II
Master Permit No.
Sub Permit No.
INTRA')
JAN 1 1 2015
QS
FBC 20r1
V--c1-Coil
REVISION I I EXTENSION
RENEWAL
CHANGE OF n CANCELLATION n SHOP
CONTRACTOR Al, DRAWINGS
// / G' g ?,c..c,G.
4 �
Folio/Parcel#:
Miami Short ANrFIL ty: Miami Dade
Occupancy Type:
Zip:
Is the Building Historically WWI;
Load: Construction Type: Flood Zone: �� oN0
:
Phone#: 6-94)
OWNER: Name (Fee Simple Titleholder):
Address: l :) 9 S
City: mi /' /o.,
Tenant/Lessee Name:
Email: r , vl e
/0 y 3
State:
3ve
()
/',/»ot CStyG
Phone#:
Zip: 3 3/14,,
CONTRACTOR: Company Name:
Address:
City: State: ®m ; Zip:
Qualifier Name: / Phone#:
State Certification or Registration #: Certificate of Competency #:
DESIGNER: Architect/Engineer: ) Phone#:
I
Address: City: State: Zip:
6t 7/ Soo . co
0
Phone#:
Value of Work for this Permit: $
Type of Work:
I1
Description of Work:
Addition
II
Alteration
Square/Linear Footage of Work:
New
epair/Replace
5', vvC' sF
II
Demolition
t aa/4/ 1 cM 33 /17h 135— 'S im
Specify color of color thru tile:
Submittal Fee $�� Permit Fee $ CCF $ CO/CC $
Scanning Fee $ Radon Fee $ DBPR $ Notary $
Technology Fee $ Training/Education Fee $ Double Fee $
Structural Reviews $ Bond $
TOTAL FEE NOW DUE $
(Revised02/24/2014)
•
Bonding Company's Name (if applicable)
Bonding Company's Address
City State Zip
Mortgage Lender's Name (if applicable)
Mortgage Lender's Address
City State Zip
Application is hereby made to obtain a permit to do the work and installations as indicated. I certify that no work or installation has
commenced prior to the issuance of a permit and that all work will be performed to meet the standards of all laws regulating
construction in this jurisdictio I understand that a separate permit must be secured for ELECTRIC, PLUMBING, SIGNS, POOLS,
FURNACES, BOILERS, HEATER' 40% S, AIR CONDITIONERS, ETC
OWNER'S AFFIDAVI � that all the foregoing information is accurate and that all work will be done in compliance with all
applicable laws r- i _ struction and zoning.
"WARNI 'Pc 2 OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY
RESULT IN 'OUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND
TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING
YOUR NOTICE OF COMMENCEMENT."
Notice to Applicant: As a condition to the issuance of a building permit with an estimated value exceeding $2500, the applicant must
promise in good faith that a copy of the notice of mencement and construction lien law brochure will be delivered to the person
whose property is subject to attachment. Also, a certifie copy of the recorded notice of commencement must be posted at the job site
for the first inspection which occurs seven (7) days afte the building permit is issued. In the absence of such posted notice, the
inspection wilt no approved and a reinspection fee will b charged.
A
Signature
Signature
OWNER or AGENT 1 CONTRACTOR
The, foregoing instrument was acknowledged before me this The foregoing instrument was acknowledged before me this
day of 7 A'J , 20I co , by day of , 20 , by
�PADilifV10 CertiN who is personally known to , who is personally known to
D2-1•Jga--
me or who has produced
identification and who did take an oath.
NOTARY PUBLIC:
Sign:
Print:
Seal:
,,\\111111111/////,��//
as me or who has produced as
identification and who did take an oath.
NOTARY PUBLIC:
- �ipo �__
- •
- •
•���
%i V ,
...... SSP•\'<.,,.
/////!/// 1111v���
Sign:
Print:
Seal:
************************************************************************************************************
APPROVED BY
(Revised02/24/2014)
Plans Examiner Zoning
Structural Review Clerk
NAME:
ADDRESS:
OWNER BUILDER DISCLOSURE STATEMENT
u 9 ✓ /v /0 s /c. Cz
DATE:
Miami Shores Village
Building Department
10050 N.E.2nd Avenue
Miami Shores, Florida 33138
Tel: (305) 795.2204
Fax: (305) 756.8972
Do hereby petition the Village of Miami Shores to act as my own contractor pursuant to the laws of the State of Florida, F.S 489.103(7). And I have
read and understood the following disclosure statement, which entitles me to work as my own contractor; I further understand that I as the owner
must appear in person to complete all applications.
State Law requires construction to be done by a licensed contractor. You have applied for a permit under an exception to the law. The exemption
allows you, as the owner of your property, to act as your own contractor even though you do not have a license. You must supervise the
construction yourself. You may build or improve a one -family or two-family residence. You may also build or improve a commercial building at a
cost of $25,000.00 or less (The new form states 75,000). The building must be for your own use and occupancy. It may not be built for sale or
lease. If you sell or lease a building you have built yourself within one year after the construction is complete, the law will presume that you built
for sale or lease, which is a violation of this exemption. You may not hire an unlicensed person as a contractor. It is your responsibility to make
sure the people employed by you have licenses required by state law and by county or municipal licensing ordinances. Any person working on
your building who is not licensed must work under your supervision and must be employed by you, which means that you must deduct F.I.C.A and
with -holdings tax and provide workers' compensation for that employee, all as prescribed by law. Your construction must comply with all
applicable laws, ordinances, buildings codes and zoning regulations.
Please read and initial each paragraph.
1. I understand that state law requires construction to be done by a licensed con'ffW j id have applied for an owner -builder permit under an
exemption from the law. The exemption specifies that I, as the owner of the property liste
restrictions even though I do not have a license.
as mown contractor with certain
Initial
2. I understand that building permits are not required to be signed by a property owner unless e „ she is responsible for the construction and
is not hiring a licensed contractor to assume responsibility. 1
Initial
3. I understand that, as an owner builder, I am the responsible party of record on a permit. I understand that I may protect myself from potential
financial risk by hiring a licensed contractor and having the permit filed in his or her name i. - . • of my own name. I also understand that the
contractor is required by law to be licensed in Florida and to list his or license numbers on per i s an. o ract
Initial
4. I understand that I may build or improve a one family or two-family residence or a farm outbuilding. I may also build or improve a commercial
building if the costs do not exceed $75,000. The building or residence must be for my use or occupancy. It may not be built or substantially
improved for sale or lease. If a building or residence that 1 have built or substantially impr. • -. If is sold or leased within 1 year after the
construction is complete, the law will presume that I built or substantially improved it for sale o I ase, • . ich vi. ates e exemption.
Initial
5. I understand that, as the owner -builder, I must provide direct, onsite supervision of the construc
Initial
6. I understand that I may not hire an unlicensed person to act as my contractor or to supervise persons working on my building or residence. It
is my responsibility to ensure that the persons whom I employ have the license required by law . <. by cou t ,or m,pnicipal ordinance.
Initial
•
7. I understand that it is frequent practices of unlicensed persons to have the property owner obtain an owner -builder permit that erroneously
implies that the property owner is providing his or her own labor and materials. I, as an owner -builder, may be held liable and subjected to
serious financial risk for any injuries sustained by an unlicensed person or his or employees while working on my property. My homeowner's
insurance may not provide coverage for those injuries. I am willfully acting as an owner-b61fclTh- d am aware of the limits of my insurance
coverage for injuries to workers on my property.
Initial
i
8. I understand that I may not delegate the responsibility for supervising work to be a licensed contractor who is not licenses to perform the
work being done. Any person working on my building who is not licensed must work under my direct supervision and must be employed by
me, which means that I must comply with laws requiring the withholding of federal income tax • d social security contributions under the
Federal Insurance Contributions Act (FICA) and must provide workers compensation for the emplo e- understand that my failure to follow
these may subject to serious financial risk.
Initial
9. I agree that, as the party legally and financially responsible for this proposed Construction activity, Twill abide by all applicable laws and
requirement that govern owner -builders as well as employers. I also understand that the
Construction must comply with all applicable laws, ordinances, building codes, and zoning regulati
Initial
10. I understand that I may obtain more information regarding my obligations as an employer from the 1 ternal Revenue Service, the United States
Small Business Administration, and the Florida Department of Revenues. I also understand thantact the Florida Construction Industry
Licensing Board at 850.487.1395 or http://www.myfloridalicense.com/dbpr/pro/cilb/index.html
Initial
11. I am aware of, and consent to; an owner -builder building permit applied for in my name and understands that I am the party
legally and financially responsible for the proposed construction activity at the following address:
b i% /L 7 o S`- S 4241
Initial
12. I agree to notify Miami Shores Village immediately of any additions, deletions, or changes to a
this disclosure.
y
Initial
that I have provided on
Licensed contractors are regulated by laws designed to protect the public. If you contract with a pers.n who (Ries of have a license, the
Constr4uction Industry Licensing Board and Department of Business and Professional Regulation may be unable to assist you with any financial
loss that you sustain as a result of contractor may be in civil court. It is also important for you to understand that, if an unlicensed contractor or
employee of an individual or firm is injured while working on your property, you may be held liable for damages. If you obtain an owner -builder
permit and wish to hire a licensed contractor, you will be responsible for verifying whether the contractor is properly licensed and the status of
the contractor's workers compensation coverage.
Before a building permit can be issued, this disclosure statement must be completed and signed by the property owner and returned to the local
permitting agency responsible for issuing the permit. A copy of the property owner's driver license, the notarized signature of the property
owner, or other type of verification acceptable to the local permitting agency is required when the permit is issued.
Was acknowledged before me this (( day of
By j3112--(
ced there License or
\ 1 n
,201?"
who was personally known to me or ,
wh9s
\\\0.
11iV haIli�,!!
c.. -r
as idof a rL;
NOTARY "7,,,
fr
I
FORM R405-2014
FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION
Florida Department of Business and Professional Regulation - Residential ormance Method
Project Name: ROBERT MORENO REMODELING Builder Name:iiii
Street: 671 NE 105 ST Permit Office:
City, State, Zip: MIAMI SHORES , FL , - Permit Number:
Owner: Jurisdiction: 231000 411141k 1,1004t-, .
Design Location: FL, Miami County:: Miami -Dade (Florida Climate,Zone. _
i i
1. New construction or existing Existing (Projecte
2. Single family or multiple family Single-family
3. Number of units, if multiple family 1
4. Number of Bedrooms 4
5. Is this a worst case? No
6. Conditioned floor area above grade (ft2) 5805
Conditioned floor area below grade (ft2) 0
Y. Windows(1248.6 sqft.) Description Area
a. U -Factor: Dbl, U=0.66 1248.60 ft2
SHGC: SHGC=0.32
b. U -Factor: N/A ft2
SHGC:
c. U -Factor: N/A ft2
SHGC:
d. U -Factor: N/A ft2
SHGC:
Area Weighted Average Overhang Depth: 2.000 ft.
Area Weighted Average SHGC: 0.320
8: Floor Types (1985.0 sqft.) Insulation Area
a. Slab -On -Grade Edge Insulation R=0.0 1985.00 ft2
b. N/A R= ft2
-•
c. N/A R= ft2
9. Wall Types (6480.0 sqft.) liti Ilea
a. Concrete Block - Int Insul, Extern .. 4.1 0.00 ft2
b. N/A - ft2
c. N/A R= ft2
d. N/A R= ft2
10. Ceiling Types (3820.0 sqft.) Insulation Area
a. Under Attic (Vented) R=19.0 3820.00 ft2
b. N/A R= ft2
c R= ft2
11. Ducts R ft2
a. Sup: Attic, Ret: AC 1, AH: AC 1 6 350
b. Sup: Attic, Ret: AC 2, AH: AC 1 6 300
c. Sup: Attic, Ret: AC 3, AH: AC 3 6 300
12. Cooling systems kBtu/hr Efficiency
a. Central Unit 36.0 SEER:17.00
b. Central Unit 36.0 SEER:17.00
c. Central Unit 36.0 SEER:17.00
13. Heating systems kBtu/hr Efficiency
a. Electric Strip Heat 34.0 COP:1.00
b. Electric Strip Heat 34.0 COP:1.00
c. Electric Strip Heat 34.0 COP:1.00
14. Hot water systems
a. Electric Tankless Ca 1 gallons
. i. •
• • • X0.990
b. Conservation features •
None •••• • • ••• ••
• . • •
15. Credits . • • • Pstat
Total Proposed Modified Loads: 223.73 ••••
••• p� �+
Glass/Floor Area: 0.215 '
Total Baseline Loads: 227.84 • • • •• • •PASS• • •
• •••
I hereby certify that the plans and specifications covered by
this calculation are in compliance with the Florida Energy
Code.
]f ,' t✓
PREPARE!) GY* l -f Li 1 ��' � I I V D%pl k!
••'' '
••
Review of the plans and t�',�8 ST
• • • �C �4
specifications covered by this • • p. ,•5
calculation indicates compliance : • • cr,,!��
with the Florida Energy Code. • • rr : • • `
Before construction is completed • _
this building will be inspected for " as _ I
compliance with Section 553.908
Florida Statutes.
D w •443
:x...,..0
BUILDING OFFICIAL:
DATE:
• . .
• • •
+� •
• rD • ••
_ II
DATE: "2-1 -i-
I hereby certviv that -this buiiding, as designed, is in compliance
with the Florida Eporgy Code.
OWNER/AGENT' I' Ta
DATE' � }i
_'� r %/�
- Compliance requires certification by the air handler unit manufacturer that the air handler enclosure qualifies as
certified factory -sealed in accordance with R403.2.2.1.
- Compliance requires an Air Barrier and Insulation Inspection Checklist in accordance with R402.4.1.1 and an envelope leakage
test report in accordance with R402.4.1.2.
5/16/2016 6:49 PM
EnergyGauge® USA - FlaRes2014 Section R405.4.1 Compliant Software Page 1 of 6
l
FORM R405.2014
5/16/2016 6:49 PM
EnergyGauge® USA - FlaRes2014 Section R405.4.1 Compliant Software Page 2 of 6
PROJECT
Title:
Building Type:
Owner: ,
# of Units:
Builder Name:
- Permit Office:
Jurisdiction:
Family Type:
New/Existing:
Comment:
ROBERT MORENO REMOD
User
1
231000
Single-family
Existing (Projected)
Bedrooms: 4
Conditioned Area: 5805
Total Stories: 2
Worst Case: No
Rotate Angle: 0
Cross Ventilation: No
Whole House Fan: No
Address Type: Street Address
Lot #
Block/SubDivision:
PlatBook:
Street: 671 NE 105 ST
County: Miami -Dade
City, State, Zip: MIAMI SHORES ,
FL , -
CLIMATE
/ IECC Design Temp
V Design Location TMY Site Zone 97.5 % 2.5 %
Int Design Temp Heating Design Daily Temp
Winter Summer Degree Days Moisture Range
FL,
Miami FL_MIAMI_INTL_AP 1 51 90
70
75 149.5 56 Low
BLOCKS
Number
Name Area
Volume
1
2
3
Blockl 1985
Block2 1930
Block3 1890
19850
19300
18900
SPACES
Number
Name Area
Volume Kitchen Occupants
Bedrooms
Infil ID Finished Cooled Heated
- 1
2
3
AC 1 1985
AC 2 1930
AC 3 1890
19850 No 3
19300 Yes 4
18900 No 4
0
1
3
1 Yes ••Ygs Yes
1 • • Ves • • •'Wes •ret• • •
1 • • Yes • • Yes! Yes••
•• •
FLOORS
-
'
0000 • • • 1
V #
Floor Type Space
Perimeter R -Value
Area
•••• • -lite 'Mood CAM • •
1 Slab
-On -Grade Edge Insulatio AC 1 295 ft 0
1985 ft2_
mi... 4 • ; • $ 0
•• •• •• • 1
ROOF
• • • 0.
• • •
V #
Type Materials
Roof Gable Roof
Area Area Color
Solar
Absor.
SA ; •tpiitt ETnitt Deck ;Qui.;
Tested • • • TVe 1 • isul. •(deg) '
1
Gable or shed Barrel tile
4138 ft2 796 ft2 Dark
0.96
No 0.9 No 0 22.6
ATTIC
#
Type Ventilation Vent Ratio (1 in)
Area
RBS IRCC
1
Full attic Vented 300
3820 ft2
N N
5/16/2016 6:49 PM
EnergyGauge® USA - FlaRes2014 Section R405.4.1 Compliant Software Page 2 of 6
FORM R40512014
5/16/2016 6:49 PM EnergyGauge® USA - FlaRes2014 Section R405.4.1 Compliant Software Page 3 of 6
CEILING
V#
Ceiling Type
Space
R -Value
Ins Type
Area Framing Frac Truss Type
1 Under Attic (Vented)
-2 Under Attic (Vented)
AC 2
AC 3
19
19
Blown
Blown
1930 ft2 0.11 Wood
1890 ft2 0.11 Wood
WALLS
` /
V #
Adjacent
ow
To WaU�ype
Space
Cavity
R -Vatic
Width
Ft In
Height
Ft -In
Sheathing
Area R
Framing
Fraction
Solar Below
Absor Grade%_
1
SW Exterior Concrete Block - Int Insul
_ -value_
610.0 ft2 0
AC 1
4.1
61
10
0
0
0.3
0
2
NW Exterior Concrete Block - Int Insul
AC 1
4.1
50
0
10
0
500.0 ft2 0
0
0.3
0
3
NE Exterior Concrete Block - Int Insul
AC 1
4.1
40
0
10
0
400.0 ft2 0
0
0.3
0
4
SE Exterior Concrete Block - Int Insul
AC 1
4.1
42
0
10
0
420.0 ft2 0
0
0.3
0
5
N Exterior Concrete Block - Int Insul
AC 1
4.1
90
0
10
0
900.0 ft2 0
0
0.3
0
6
E Exterior Concrete Block - Int Insul
AC 1
4.1
12
0
10
0
120.0 ft2 0
0
0.3
0
7
S Exterior Concrete Block - Int Insul
AC 1
4.1
9
0
10
0
90.0 ft2 0
0
0.3
0
8
SE Exterior Concrete Block - Int Insul
AC 2
4.1
37
0
10
0
370.0 ft2 0
0
0.3
0
9
SW Exterior Concrete Block - Int Insul
AC 2
4.1
18
0
10
0
180.0 ft2 0
0
0.3
0
10
NW Exterior Concrete Block - Int Insul
AC 2
4.1
36
0
10
0
360.0 ft2 0
0
0.3
0
11
NE Exterior Concrete Block - Int Insul
AC 2
4.1
50
0
10
0
500.0 ft2 0
0
0.3
0
12
N Exterior Concrete Block - Int Insul
AC 2
4.1
10
0
10
0
100.0 ft2 0
0
0.3
0
13
E Exterior Concrete Block - Int Insul
AC 2
4.1
12
0
10
0
120.0 ft2 0
0
0.3
0
14
S Exterior Concrete Block - Int Insul
AC 2
4.1
18
0
10
0
180.0 ft2 0
0
0.3
0
15
SW Exterior Concrete Block - Int Insul
AC 3
4.1
34
0
10
0
340.0 ft2 0
0
0.3
0
16
S Exterior Concrete Block - Int Insul
AC 3
4.1
7
0
10
0
70.0 ft2 0
0
0.3
0
17
W Exterior Concrete Block - Int Insul
AC 3
4.1
7
0
10
0
70.0 ft2 00
0.3
0
.•.•
18
SW Exterior Concrete Block - Int Insul
AC 3
4.1
36
0
10
0
360.0 ft2• 0 •
°•••••a-3
•••q•••
_
19
SE Exterior Concrete Block - Int Insul
AC 3
4.1
64
0
10
0
640.0 ft2 • • •a •
0 •
• • 9.3
01 •
•
• •
•
- 20
NE Exterior Concrete Block - Int Insul
AC 3
4.1
15
0
10
0
150.0 ft2 • • •Q • •
0 • •
d.3
•
• • •d •'
.
DOORS
• • • •
....
• ••
• .
•
.
..•
•
/
V
# Ornt Door Type
Space
Storms
U -Value Width. • • •
Height • • •
.
Area* • • •
Ft
Ft • • •l1i •_ ,
1 NW Wood
AC 1
Wood
_•••19.•
3
7
• •
.46
• • •
21 ft2 •
2 NE Wood
AC 1
Wood
3 • •
7 •
•
42• • • •
3 SE Wood
AC 1
Wood
.46
3 •••••:
7 •••••
21
4 SE Wood
AC 1
Wood
.46
.46
3
7 •••• :
21 ij2••••
21 ft2
5 SW Wood
AC 2
Wood
.46
3
7
21 ft2
6 NW Wood
AC 2
Wood
.46
3
7
21 ft2
7 NW Wood
AC 2
Wood
.46
3
7
21 ft2
8 SW Wood
AC 3
Wood
.46
3
7
21 ft2
5/16/2016 6:49 PM EnergyGauge® USA - FlaRes2014 Section R405.4.1 Compliant Software Page 3 of 6
FORM R405-2014
WINDOWS
Orientation shown is the entered, Proposed orientation.
1
Wall Overhang
V # Ornt ID Frame Panes NFRC U -Factor SHGC Area Depth Separation Int Shade Screening
1- SE 4 Metal Double (Tinted) Yes 0.66 0.32 3.6 ft2 2 ft 0 in 12 ft 0 in None None
2 SE 4 Metal Double (Tinted) Yes 0.66 0.32 3.6 ft2 2 ft 0 in 12 ft 0 in None None
3 SE 4 Metal Double (Tinted) Yes 0.66 0.32 3.6 ft2 2 ft 0 in 12 ft 0 in None None
4 NW 2 Metal Double (Tinted) Yes 0.66 0.32 10.0 ft2 2 ft 0 in 12 ft 0 in None None
5 NW 2 Metal Double (Tinted) Yes 0.66 0.32 10.0 ft2 2 ft 0 in 12 ft 0 in None None
6 NW 2 Metal Double (Tinted) Yes 0.66 0.32 10.0 ft2 2 ft 0 in 12 ft 0 in None None
7 NW 2 Metal Double (Tinted) Yes 0.66 0.32 10.0 ft2 2 ft 0 in 12 ft 0 in None None
8 NW 2 Metal Double (Tinted) Yes 0.66 0.32 10.0 ft2 2 ft 0 in 12 ft 0 in None None
9 NE 3 Metal Double (Tinted) Yes 0.66 0.32 10.0 ft2 2 ft 0 in 12 ft 0 in None None
10 NE 3 Metal Double (Tinted) Yes 0.66 0.32 10.0 ft2 2 ft 0 in 12 ft 0 in None None
11 NE 3 Metal Double (Tinted) Yes 0.66 0.32 56.0 ft2 2 ft 0 in 12 ft 0 in None None
12 NE 3 Metal Double (Tinted) Yes 0.66 0.32 56.0 ft2 2 ft 0 in 12 ft 0 in None None
13 N 5 Metal Double (Tinted) Yes 0.66 0.32 59.4 ft2 2 ft 0 in 12 ft 0 in None None
14 E 6 Metal Double (Tinted) Yes 0.66 0.32 79.1 ft2 2 ft 0 in 12 ft 0 in None None
15 S 7 Metal Double (Tinted) Yes 0.66 0.32 59.4 ft2 2 ft 0 in 12 ft 0 in None None
16 SE 8 Metal Double (Tinted) Yes 0.66 0.32 34.6 ft2 2 ft 0 in 1 ft 6 in None None
17 SE 8 Metal Double (Tinted) Yes 0.66 0.32 34.6 ft2 2 ft 0 in 1 ft 6 in None None
18 SE 8 Metal Double (Tinted) Yes 0.66 0.32 34.6 ft2 2 ft 0 in 1 ft 6 in None None
19 NW 10 Metal Double (Tinted) Yes 0.66 0.32 10.0 ft2 2 ft 0 in 1 ft 6 in None None
20 NW 10 Metal Double (Tinted) Yes 0.66 0.32 10.0 ft2 2 ft 0 in 1 ft 6 in None None
21 NW 10 Metal Double (Tinted) Yes 0.66 0.32 10.0 ft2 2 ft 0 in 1 ft 6 in None None
22 NW 10 Metal Double (Tinted) Yes 0.66 0.32 26.3 ft2 2 ft 0 in 1 ft 6 in NYcne• • None
•
23 NE 11 Metal Double (Tinted) Yes 0.66 0.32 26.3 ft2 2 ft 0 in It 6 ie • None • N•one • :
24 NW 10 Metal Double (Tinted) Yes 0.66 0.32 48.0 ft2 2 ft 0 in 1 ft 6 in • c ne• •
t: VD,% •: i
25 NW 10 Metal Double (Tinted) Yes 0.66 0.32 48.0 ft2 2 ft 0 in 1.ft.6,i:• • None. None
26 N 12 Metal Double (Tinted) Yes 0.66 0.32 28.5 ft2 2 ft 0 in 1 rEl'it • • I2dhe • • None
27 E 13 Metal Double (Tinted) Yes 0.66 0.32 38.0 ft2 2 ft 0 in 1 ft•6•in• None• • None. 1
• •••
28 S 14 Metal Double (Tinted) Yes 0.66 0.32 28.5 ft2 2 ft 0 in 1,jt•6`ip • • lcyg• ; Npp% • • ,
29 SW 15 Metal Double (Tinted) Yes 0.66 0.32 97.1 ft2 2 ft 0 in 1 4ft•6.ir • • None* None • •
• • • •
30 S 16 Metal Double (Tinted) Yes 0.66 0.32 32.4 ft2 2 ft 0 in 1 it 6 in • fie•: • None
31 SW 18 Metal Double (Tinted) Yes 0.66 0.32 97.1 ft2 2 ft 0 in 14t 6iA • : Nord• • NVIC • •
32 SW 18 Metal Double (Tinted) Yes 0.66 0.32 60.1 ft2 2 ft 0 in 1 ft 6 in Nom. : None
33 SW 18 Metal Double (Tinted) Yes 0.66 0.32 30.1 ft2 2 ft 0 in 1 ft 6 in None None
34 SW 15 Metal Double (Tinted) Yes 0.66 0.32 48.6 ft2 2 ft 0 in 1 ft 6 in None None
35 SE 19 Metal Double (Tinted) Yes 0.66 0.32 32.4 ft2 2 ft 0 in 1 ft 6 in None None
36 SW 18 Metal Double (Tinted) Yes 0.66 0.32 9.0 ft2 2 ft 0 in 1 ft 6 in None None
37 SE 19 Metal Double (Tinted) Yes 0.66 0.32 32.4 ft2 2 ft 0 in 1 ft 6 in None None
38 SE 19 Metal Double (Tinted) Yes 0.66 0.32 7.9 ft2 2 ft 0 in 1 ft 6 in None None
39 NE 20 Metal Double (Tinted) Yes 0.66 0.32 33.3 ft2 2 ft 0 in 1 ft 6 in None None
5/16/2016 6:49 PM EnergyGauge® USA - FlaRes2014 Section R405.4.1 Compliant Software Page 4 of 6
FORM R405-2014
5/16/2016 6:49 PM
• •
• . •
•• •
•
••••
• • •
•• •
•
•
•
EnergyGauge® USA - FlaRes2014 Section R405.4.1 Compliant Software Page 5 of 6
•
INFILTRATION
# Scope Method
SLA CFM 50
ELA EqLA ACH ACH 50
Wholehouse Proposed CFM(50)
.000099 1500
82.35 154.87 .0837 1.5504
HEATING SYSTEM
# System Type
Subtype
Efficiency
Capacity
Block Ducts
1 Electric Strip Heat
2 Electric Strip Heat
3 Electric Strip Heat
None
None
None
COP:1
COP:1
COP:1
34 kBtu/hr
34 kBtu/hr
34 kBtu/hr
1 sys#1
2 sys#2
3 sys#3
COOLING SYSTEM
# System Type
Subtype
Efficiency
Capacity Air Flow SHR
Block Ducts
1 Central Unit
2 Central Unit
3 Central Unit
Split
Split
Split
SEER: 17
SEER: 17
SEER: 17
36 kBtu/hr 1050 cfm 0.75
36 kBtu/hr 1050 cfm 0.75
36 kBtu/hr 1050 cfm 0.75
1 sys#1
2 sys#2
3 sys#3
HOT WATER SYSTEM
V#
System Type SubType
Location EF
_ Cap _ _
Use SetPnt Conservation
1 Electric Tankless
AC 1 0.99
1 gal 60
gal 120 deg None
SOLAR HOT WATER SYSTEM
FSEC
Cert # Company Name
Collector Storage
System Model # Collector Model # Area Volume
FEF
• •" " •
••••
None None
ft2
• •
DUCTS
•
•' 00
• • ' •
•• •
---- Supply ----
# Location R -Value Area
---- Return ----
Location Area
Leakage Type
Air CFM 25 •Ci'r 23
Handler TOT • •C?I 1' • QN:'.R1%
•
1-141C•4 •
Heat* Cool
--•–_••-- --_•a•••
• •.. 1 IA..
• • •
• • ' 2 '''L'I•
• • • •3 . • 3•:1
1 Attic 6 350 ft2
2 Attic 6 300 ft2
3 Attic 6 300 ft2
AC 1 25 ft2
AC 2 25 ft2
AC 3 25 ft2
Default Leakage
Default Leakage
Default Leakage
••-•-•— __
AC 1 (Default).(PA,ayi{ti)
• •
AC 1 (Default)'(Je}atalt)
AC 3 (Default):(Detau)
5/16/2016 6:49 PM
• •
• . •
•• •
•
••••
• • •
•• •
•
•
•
EnergyGauge® USA - FlaRes2014 Section R405.4.1 Compliant Software Page 5 of 6
•
FORM R405-2014
TEMPERATURES
Programable Thermostat: Y Ceiling Fans:
Cooling X Jan X] Feb X] Mar X Apr X] May X] Jun X Jul X Aug X Sep X] Oct X[[] Nov X Dec
Heating X� Jan lX] Feb lX] Mar X1 Apr lX] May f X] Jun tX Jul �X Aug lX Sep tX] Oct [X] Nov lXDec
Venting X Jan X Feb X Mar X Apr X May X Jun X Jul X Aug X Sep X Oct [X Nov X Dec
Thermostat Schedule: HERS 2006 Reference Hours
• Schedule Type 1 2 3 4 5 6 7 8 9 10 11 12
Cooling (WD) AM 78 78 78 78 78 78 78 78 80 80 80 80
PM 80 80 78 78 78 78 78 78 78 78 78 78
Cooling (WEH) AM 78 78 78 78 78 78 78 78 78 78 78 78
PM 78 78 78 78 78 78 78 78 78 78 78 78
Heating (WD) AM 66 66 66 66 66 68 68 68 68 68 68 68
PM 68 68 68 68 68 68 68 68 68 68 66 66
Heating (WEH) AM 66 66 66 66 66 68 68 68 68 68 68 68
PM 68 68 68 68 68 68 68 68 68 68 66 66
• •
• . .
•. •
.
••• •
• •
• •
•• ••
• • •
• •
• •
• • •
•• •
••••
• •
••••
• •••
•
•• •
•
••
• •
•• • • •
• • •
• ••
• •••
• • •
•• •
.
• •
•
••••
• • •
• •
••
• •
•
5/16/2016 6:49 PM EnergyGauge® USA - FlaRes2014 Section R405.4.1 Compliant Software Page 6 of 6
FORM R405-2014
TABLE 402.4.1.1
AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA
Project Name: ROBERT MORENO REMODELING Builder Name:
Street: 671 NE 105 ST Permit Office:
City, State, Zip: MIAMI SHORES , FL , - Permit Number:
Owner: Jurisdiction: 231000
Design Location: FL, Miami
COMPONENT
CRITERIA
CHECK
Air barrier and thermal barrier
A continuous air barrier shall be installed in the building envelope.
Exterior thermal envelope contains a continuous barrier.
Breaks or joints in the air barrier shall be sealed.
Air -permeable insulation shall not be used as a sealing material.
V
Ceiling/attic
The air barrier in any dropped ceiling/soffit shall be aligned with the
and any gaps in the air barrier shall be sealed.
Access openings, drop down stairs or knee wall doors to unconditioned attic
spaces shall be sealed.
iinsulation
V
Walls
Corners and headers shall be insulated and the junction of the foundation
and sill plate shall be sealed.
The junction of the top plate and the top or exterior walls shall be sealed.
Exterior thermal envelope insulation for framed walls shall be installed in
substantial contact and continuous alignment with the air barrier.
Knee walls shall be sealed.
1/
Windows, skylights and doors
The space between window/door jambs and framing and skylights and
framing shall be sealed.
Rim joists
Rim joists are insulated and include an air barrier.
•
••••
• •
Floors (including above -garage
and cantilevered floors)
Insulation shall be installed to maintain permanent contact with underside of
subfloor decking. •
The air barrier shall be installed at any exposed edge of insulation.
• •••
• : •.•
• 1/ •
• • •
Crawl space walls
Where provided in lieu of floor insulation, insulation shall be perrnarier,t y
attached to the crawlspace walls.
Exposed earth in unvented crawl spaces shall be covered with a•Glass, 1
vapor retarder with overlapping joints taped.
• •
•
•
••
• •
•
• • • • d-•••
• • • • •'
•
• • • •'
•
Shafts, penetrations
Duct shafts, utility penetrations, and flue shaft openings to exterior or
unconditioned space shall be sealed. • • • •
••••••
__,
' •
••
Narrow cavities
Batts in narrow cavities shall be cut to fit, or narrow cavities shall be filled by
insulation that on installation readily conforms to the available cavity
spaces.
•
•
• •
Garage separation
Air sealing shall be provided between the garage and conditioned spaces.
r/'
Recessed lighting
Recessed light fixtures installed in the building thermal envelope shall be air
tight, IC rated, and sealed to the drywall.
4,;"
Plumbing and wiring
Batt insulation shall be cut neatly to fit around wiring and plumbing in
exterior walls, or insulation that on installation readily conforms to available
space shall extend behind piping and wiring.
l/
Shower/tub on exterior wall
Exterior walls adjacent to showers and tubs shall be insulated and the air
barrier installed separating them from the showers and tubs.
„�
Electrical/phone box on
The air barrier shall be installed behind electrical or communication boxes or
air sealed boxes shall be installed.
v
HVAC register boots
HVAC register boots that penetrate building thermal envelope shall be
sealed to the sub -floor or drywall.
L./
Fireplace
An air barrier shall be installed on fireplace walls. Fireplaces shall have
gasketed doors
V
5/16/2016 6:49 PM
EnergyGauge® USA - FlaRes2014 Section R405.4.1 Compliant Software
Page 1 of 1
•••
•
•
•
•••
•
•••
•
••
•
••
•••
•
•
•
•••
•
•••
•
FORM R405-2014
Florida Department of Business and Professional Regulations
Residential Whole Building Performance and Prescriptive Methods
ADDRESS: 671 NE 105 ST Permit Number:
MIAMI SHORES , FL ,
MANDATORY REQUIREMENTS See individual code sections for full details.
0
401.3 Energy Performance Level (EPL) display card (Mandatory). The building official shall require that an energy performance level (EPL)
display card be completed and certified by the builder to be accurate and correct before final approval of the building for occupancy. Florida law
[Section 553.9085, Florida Statues] requires the EPL display card to be included as an addendum to each sales contract for both presold and
nonpresold residential buildings. The EPL display card contains information indicating the energy performance level and efficiencies of components
installed in a dwelling unit. The building official shall verify that the EPL display card completed and signed by the builder accurately reflects the plans
and specifications submitted to demonstrate compliance for the building. A copy of the EPL display card can be found in Appendix C.
R402.4 Air leakage (Mandatory). The building thermal envelope shall be constructed to limit air leakage in accordance with the requirements of
Sections R402.1 through R402.4.4.
Q R402.4.1 Building thermal envelope. The building thermal envelope shall comply with Sections R402.4.1.1 and R402.4.1.2. The sealing
methods between dissimilar materials shall allow for differential expansion and contraction.
• R402.4.1.1 Installation. The components of the building thermal envelope as listed in Table R402.4.1.1 shall be installed in accordance
with the manufacturer's instructions and the criteria listed in Table 402.4.1.1, as applicable to the method of construction. Where
required by the code official, an approved third party shall inspect all components and verify compliance.
•
R402.4.1.2 Testing. The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 5 air
changes per hour in Climate Zones 1 and 2, and 3 air changes per hour in Climate Zones 3 through 8. Testing shall be conducted with a
blower door at a pressure of 0.2 inches w.g. (50 Pascals). Where required by the code official, testing shall be conducted by an
approved third party. A written report of the results of the test shall be signed by the party conducting the test and provided to the code
official. Testing shall be performed at any time after creation of all penetrations of the building thermal envelope.
During testing:
1. Exterior windows and doors, fireplace and stove doors shall be closed, but not sealed, beyond the intended weatherstripping or
other infiltration control measures;
2. Dampers including exhaust, intake, makeup air, backdraft and flue dampers shall be closed, but not sealed beyond intended
infiltration control measures;
3. Interior doors, if installed at the time of the test, shall be open; ••••
4. Exterior doors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed; • i••• •
5. Heating and cooling systems, if installed at the time of the test, shall be turned off; and • • • •
6. Supply and return registers, if installed at the time of the test, shall be fully open. • • •
O R402.4.2 Fireplaces. New wood -burning fireplaces shall have tight -fitting flue dampers and outdoor corpai jipg air. • • •
• •••
• • •
•• •
•
•
•
Q R402.4.3 Fenestration alr IeakageWindows, skylights and sliding glass doors shall have an air infiltratioin•rate of no mQitjhdh•0.3 cfm per •
square foot (1.5 Us/m2), and swinging doors no more than 0.5 cfm per square foot (2.6 Us/m2), when tezted according•to NFC 400 of • ; • • •
AAMA/WDMA/CSA 101/I.S.2/A440 by an accredited, independent laboratory and listed and labeled by 14,rryiyifacturer.• • • •
Exception: Site -built windows, skylights and doors. • • • • • • • • • • •
•• •••
• •
Q R402.4.4 Recessed lighting. Recessed luminaires installed in the building thermal envelope shall be seated•to limit air leakage betwegq ,•:.
conditioned and unconditioned spaces. All recessed luminaires shall be IC -rated and labeled as havingn air leakage ratesi®trwore than •
2.0 cfm (0.944 Us) when tested in accordance with ASTM E 283 at a 1.57 psf (75 Pa) pressure different/al. /;II•rgcessedluminaires shall
be sealed with a gasket or caulk between the housing and the interior wall or ceiling covering. • • • •••• • •
• • •
•
❑ R403.1.1 Thermostat provision (Mandatory). At least one thermostat shall be provided for each separate heating and cooling system. •
❑ R403.1.3 Heat pump supplementary heat (Mandatory).Heat pumps having supplementary electric -resistance heat shall have controls
that, except during defrost, prevent supplemental heat operation when the heat pump compressor can meet the heating load.
❑ R403.2.2 Sealing (Mandatory)111 ducts, air handlers, and filter boxes and building cavities that form the primary air containment
passageways for air distribution systems shall be considered ducts and plenum chambers, shall be constructed and sealed in accordance
with Section C403.2.7.2 of the Commercial Provisions of this code and shall be shown to meet duct tightness criteria by post -construction or
rough -in testing below.
Duct tightness shall be verified by testing to Section 803 of the RESNET Standards by either an energy rater certified in accordance with Section
553.99, Florida Statutes, or as authorized by Florida Statutes, to be "substantially leak free" by either of the following:
• 1. Post -construction test: Total leakage shall be less than or equal to 4 cfm (113 Umin) per 100 square feet (9.29 m2) of conditioned floor area when
tested at a pressure differential of 0.1 inches w.g. (25 Pa) across the entire system, including the manufacturer's air handler enclosure. All register
boots shall be taped or otherwise sealed during the test.
• 2. Rough -in test: Total leakage shall be less than or equal to 4 cfm (113 L/min) per 100 square feet (9.29 m2) of conditioned floor area when tested at
a pressure differential of 0.1 inches w.g. (25Pa) across the system, including the manufacturer's air handler enclosure. All registers shall be taped
or otherwise sealed during the test. If the air handler is not installed at the time of the test, total leakage shall be less than or equal to 3 cfm (85
Umin) per 100 square feet (9.29 m2) of conditioned floor area.
Exceptions:
1. The total leakage test is not required for ducts and air handlers located entirely within the building envelope.
2. Duct testing is not mandatory for buildings complying by Section R405 of this code.
5/16/2016 6:49 PM
EnergyGauge® USA - FlaRes2014 - Section R405.4.1 Com Page 1 of 3
FORM R465-2014
MANDATORY REQUIREMENTS - (Continued)
O R403.2.3 Building Cavities (Mandatory). Building framing cavities shall not be used as ducts or plenums.
• R403.3 Mechanical system piping insulation (Mandatory). Mechanical system piping capable of carrying fluids above 105°F (41°C) or
below 55°F (13°C) shall be insulated to a minimum of R-3.,
R403.3.1 Protection of piping insulation.
O R403.4.1 Circulating hot water systems (Mandatory). Circulating hot water systems shall be provided with an automatic or readily
accessible manual switch that can turn off the hot-water circulating pump when the system is not in use.
O R403.4.3 Heat traps (Mandatory). Storage water heaters not equipped with integral heat traps and having vertical pipe risers shall have
heat traps installed on both the inlets and outlets. Extemal heat traps shall consist of either a commercially available heat trap or a
downward and upward bend of at least 3' /2 inches (89 mm) in the hot water distribution line and cold water line located as close as possible
to the storage tank.
O R403.4.4 Water heater efficiencies (Mandatory).
Q R403.4.4.1 Storage water heater temperature controls
▪ R403.4.4.1.1 Automatic controls. Service water heating systems shall be equipped with automatic temperature controls capable
of adjustment from the lowest to the highest acceptable temperature settings for the intended use. The minimum temperature setting
range shall be from 100°F to 140°F (38°C to 60°C).
. R403.4.4.1.2 Shut down. A separate switch or a clearly marked circuit breaker shall be provided to permit the power supplied to
electric service systems to be turned off. A separate valve shall be provided to permit the energy supplied to the main burner(s) of
combustion types of service water heating systems to be turned off.
O R403.4.4.2 Water heating equipment. Water heating equipment installed in residential units shall meet the minimum efficiencies of Table
C404.2 in Chapter 4 of the Florida Building Code, Energy Conservation, Commercial Provisions, for the type of equipment installed.
Equipment used to provide heating functions as part of a combination system shall satisfy all stated requirements for the• ar priate water
heating category. Solar water heaters shall met the criteria Section R403.4.4.2.1. • •
•••• •
▪ R403.4.4.2.1 Solar water heating systems. Solar systems for domestic hot water production are rated * the annual spknr energy •
factor of the system. The solar energy factor of a system shall be determined from the Florida Solas energy Center DiPecLbry of •
Certified Solar Systems. Solar collectors shall be tested in accordance with ISO Standard 9806, RAST:I%(hods for Solar Collectors, •
and SRCC Standard TM -1, Solar Domestic Hot Water System and Component Test Protocol, CotiedtAr! , installed sellar water ••••••
heating systems should meet the following criteria: • • • • • • • • •
• • • • •
1. Be installed with a tilt angle between 10 degrees and 40 degrees of the horizontal; and • • ••
• •••
2. Be installed at an orientation within 45 degrees of true south. • • • • •
•• •• •• •
O R403.5 Mechanical ventilation (Mandatory). The building shall be provided with ventilation that meets the requ r ern i of the •
Florida Building Code, Residential or Florida Building Code, Mechanical, as applicable, or with other approved means elf ventilatiorq. •
Outdoor air intakes and exhausts shall have automatic or gravity dampers that close when the ventilation system ig not operating. •
• • •
• • ••
p R403.6 Heating and cooling equipment (Mandatory). The following sections are mandatory for cooling and heating equipment • • • • •
O R403.6.1 Equipment sizing. Heating and cooling equipment shall be sized in accordance with ACCA Manual S based on the
equipment loads calculated in accordance with ACCA Manual J or other approved heating and cooling calculation methodologies,
based on building loads for the directional orientation of the building. The manufacturer and model number of the outdoor and indoor
units (if split system) shall be submitted along with the sensible and total cooling capacities at the design conditions described in
Section R302.1. This code does not allow designer safety factors, provisions for future expansion or other factors which affect
equipment sizing. System sizing calculations shall not include loads created by local intermittent mechanical ventilation such as
standard kitchen and bathroom exhaust systems.
• R403.6.1.1 Cooling equipment capacity. Cooling only equipment shall be selected so that its total capacity is not less than the
calculated total load, but not more than 1.15 times greater than the total load calculated according to the procedure selected in
Section 403.6, or the closest available size provided by the manufacturer's product lines. The corresponding latent capacity of the
equipment shall not be less than the calculated latent load.
• •
•
•
•
•
5/16/2016 6:49 PM
EnergyGauge® USA - FlaRes2014 - Section R405.4.1 Com Page 2 of 3
FORM R405-2014
MANDATORY REQUIREMENTS - (Continued)
O R403.6.1.1 Cooling equipment capacity. (continued) The published value for AHRI total capacity is a nominal, rating -test value and
shall not be used for equipment sizing. Manufacture's expanded performance data shall be used to select cooling -only equipment. This
selection shall be used to select cooling -only equipment. This selection shall be based on the outdoor design dry bulb temperature for the
load calculation (or entering water temperature for water -source equipment), the blower cfm provided by the expanded performance data,
the design value for entering wet bulb temperature and the design value for entering dry bulb temperature.
Design values for entering wet bulb and dry bulb temperature shall be for the indoor dry bulb and relative humidity used for the load
calculation and shall be adjusted for retum side gains if the retum duct(s) is installed in an unconditioned space.
Exceptions:
1. Attached single- and multi -family residential equipment sizing may be selected so that its cooling capacity is less than the
calculated total sensible load but not less than 80 percent of that load.
2. When signed and sealed by a Florida -registered engineer, in attached single- and multi -family units, the capacity of
equipment may be sized in accordance with good design practice.
0
R403.6.1.2 Heating equipment capacity
' R403.6.1.2.1 Heat pumps. Heat pumps sizing shall be based on the cooling requirements as calculated according to Section
R403.6.1.1 and the heat pump total cooling capacity shall not be more than 1.15 times greater than the design cooling load.
▪ R403.6.1.2.2 Electric resistance furnaces. Electric resistance furnaces shall be sized within 4 kW of the design requirements
calculated according to the procedure selected in Section R403.6.1.
▪ R403.6.1.2.3 Fossil fuel heating equipment. The capacity of fossil fuel heating equipment with natural draft atmospheric burners
shall not be less than the design load calculated in accordance with Section R403.6.1.
O R403.6.1.3 Extra capacity required for special occasions. Residences requiring excess cooling or heating equipment capacity on an
intermittent basis, such as anticipated additional loads caused by major entertainment events, shall have equipment sized or controlled to
prevent continuous space cooling or heating within that space by one or more of the following options:
1. A separate cooling or heating system is utilized to provide cooling or heating to the major entertainment areas.
2. A variable capacity system sized for optimum performance during base load periods is utilized.
O R403.7 Systems serving multiple dwelling units (Mandatory). Systems serving multiple dwelling units shall comply with SectionsC403
and C404 of the Commercial Provisions in lieu of Section R403. . . • • • • • .
• • • •
0 . R403.8 Snow melt system controls (Mandatory). Snow and ice -melting systems, supplied through energy service to the building* shell • •
include automatic controls capable of shutting off the system when the pavement temperature is above 55°F, analtab?ecipitationls fallik
and an automatic or manual control that will allow shutoff when the outdoor temperature is above 40°F. • • •
•••• •• • • •
O . R403.9 Swimming pools, inground spas and portable spas (Mandatory). The energy requirements for resigclijl•pools and fizotind
spas shall be as specified in Sections R403.9.1 through R403.9.3 and in accordance with ANSI/APSP-15. The earn requirements for • •
portable spas shall be in accordance with ANSI/APSP-14. ' • •• •• •• •• • ••
•• •• •• •
O R403.9.1 Pool and spa heaters. All pool heaters shall be equipped with a readily accessible on-off swiite/ that is mounteel outside •
the heater to allow shutting off the heater without adjusting the thermostat setting. • • • • • •
R403.9.1.1 Gas and oil -fired pool and spa heaters. All gas- and oil -fired pool and space heitersrsflill have'd minimum therNl• . • :
efficiency of 82 percent for heaters manufactured on or after April 16, 2013 when tested in accordemce with ANSI€021s56. Pool • •
heaters fired by natural gas or LP gas shall not have continuously burning pilot lights. • . ••
▪ R403.9.1.2 Heat pump pool heaters. Heat pump pool heaters shall have a minimum COP of 4.0 when tested in accordance with
AHRI 1160, Table 2, Standard Rating Conditions -Low Air Temperature. A test report from an independent laboratory is required to
verify procedure compliance. Geothermal swimming pool heat pumps are not required to meet this standard.
O R403.9.2 Time switches. Time switches or other control method that can automatically turn off and on heaters and pumps according to a
preset schedule shall be installed on all heaters and pumps. Heaters, pumps and motors that have built in timers shall be deemed in
compliance with this equipment.
Exceptions:
' 1. Where public health standards require 24-hour pump operations.
2. Where pumps are required to operate solar- and waste -heat -recovery pool heating systems.
3. Where pumps are powered exclusively from on-site renewable generation.
O R403.9.3 Covers. Heated swimming pools and inground permanently installed spas shall be equipped with a vapor -retardant cover on or
at the water surface or a liquid cover or other means proven to reduce heat loss.
Exception: Outdoor pools deriving over 70 percent of the energy for heating from site -recovered energy, such as a heat pump or
' solar energy source computed over an operating season.
O RR404.1 Lighting equipment (Mandatory). A minimum of 75 percent of the lamps in permanently installed lighting fixtures shall be
high -efficacy lamps or a minimum of 75 percent of permanently installed lighting fixtures shall contain only high efficacy lamps.
Exception: Low -voltage lighting shall not be required to utilize high -efficacy lamps.
0
O R404.1.1 Lighting equipment (Mandatory). Fuel gas lighting systems shall not have continuously burning pilot lights
R405.2 Performance ONLY. All ducts not entirely inside the building thermal envelope shall be insulated to a minimum of R-6.
0 R405.2.1 Performance ONLY. Ceilings shall have minimum insulation of R-19. Where single assemby of the exposed deck and beam type or
concrete deck roofs do not have sufficent space, R-10 is allowed.
5/16/2016 6:49 PM EnergyGauge® USA - FlaRes2014 - Section R405.4.1 Com Page 3 of 3
FORM R405-2014
ENERGY PERFORMANCE LEVEL (EPL)
DISPLAY CARD
ESTIMATED ENERGY PERFORMANCE INDEX* = 98
The lower the EnergyPerformance Index, the more efficient the home.
1. New construction or existing
2. Single family or multiple family
3. Number of units, if multiple family
4. Number of Bedrooms
5. Is this a worst case?
6. Conditioned floor area (ft2)
7. Windows** Description
a. U -Factor: Dbl, U=0.66
SHGC: SHGC=0.32
b. U -Factor: N/A
SHGC:
c. U -Factor: N/A
SHGC:
d. U -Factor: N/A
SHGC:
Area Weighted Average Overhang Depth:
Area Weighted Average SHGC:
8. Floor Types
-a. Slab -On -Grade Edge Insulation
b. N/A
c. N/A
671 NE 105 ST, MIAMI SHORES, FL, -
Existing (Projecte
Single-family
1
4
No
5805
Area
1248.60 ft2
Insulation
R=0.0
R=
R=
ft2
ft2
ft2
2.000 ft.
0.320
Area
1985.00 ft2
ft2
ft2
9. Wall Types
a. Concrete Block - Int Insul, Exterior
b. N/A
c. N/A
d. N/A
10. Ceiling Types
a. Under Attic (Vented)
b. N/A
c. N/A
11. Ducts
a. Sup: Attic, Ret: AC 1, AH: AC 1
b. Sup: Attic, Ret: AC 2, AH: AC 1
c. Sup: Attic, Ret: AC 3, AH: AC 3
12. Cooling systems
a. Central Unit
b. Central Unit
c. Central Unit
13. Heating systems
a. Electric Strip Heat
b. Electric Strip Heat
c. Electric Strip Heat • •
14. Hot water systems • • •
a. Electric
Insulation Area
R=4.1 6480.00 ft2
R= ft2
R= ft2
R= ftz
Insulation Area
R=19.0 3820.00 ft'
R= ft2
R= ft2
b. Conservation features
None
15. Credits
I certify that this home has complied with the Florida Energy Efficiency Code for Building
Construction through the above energy saving features which will be installed (or exceeded)
in this home before final inspection. Otherwise, a new EPL Display Card will be completed
based on installed Code compliant features.
Builder Signature:
g06 eitt H1 vi 0
Address of New Home: (4,-7I x '1, .. E
•
••••
• •
••••
• •
.• •.
• •
•
•
• •
••
Date: 4z )1 La
City/FL Zip: 342(.9
•
kBtu/hr
36.0
36.0
36.0
kBtu/hr
R ft2
6 350
6 300
6 300
Efficiency
SEER:17.00
SEER:17.00
SEER:17.00
Efficiency
34.0 COP:1.00
311 • etV:1.00
34.9 • COP:1.00
• •••
Ca p.1allons
Er: 0.99
••
•••
•
•• • • •
• • •
• ••
• •• Pstat
••
• • •
•• •
•
• •
••
•
*Note: This is not a Building Energy Rating. If your Index is below 70, your home may qualify for energy efficient
mortgage (EEM) incentives if you obtain a Florida EnergyGauge Rating. Contact the EnergyGauge Hotline at (321)
638-1492 or see the EnergyGauge web site at energygauge.com for information and a list of certified Raters. For
information about the Florida Building Code, Energy Conservation, contact the Florida Building Commission's support
staff.
**Label required by Section R303.1.3 of the Florida Building Code, Energy Conservation, if not DEFAULT.
5/16/2016 6:50 PM EnergyGauge® USA - FlaRes2014 - Section R405.4.1 Compliant Software Page 1 of 1
•
•
Residential System Sizing Calculation
Summary
Project Title:
ROBERT MORENO REMODELING
671 NE 105 ST
MIAMI SHORES, FL -
5/16/2016
Location for weather data: Miami, FL - Defaults: Latitude(25.82) Altitude(7 ft.) Temp Range(L)
Humidity data: Interior RH (50%) Outdoor wet bulb (77F) Humidity difference(56gr.)
Winter design temperature(TMY3 99%) 49 F
Winter setpoint 70 F
Winter temperature difference 21 F
Summer design temperature(TMY3 99%) 92
Summer setpoint 75
Summer temperature difference 17
F
F
F
Total heating load calculation
65244
Btuh
Total cooling load calculation 100850
Btuh
Submitted heating capacity
Total (Electric Strip Heat)
% of calc
156.3
Btuh
102000
Submitted cooling capacity % of calc
Sensible (SHR = 0.75) 99.1
Latent 141.4
Total 107.1
Btuh
81000
27000
108000
WINTER CALCULATIONS
Winter Heating Load (f
Load component
Load
Load
Window total 1249
Window total
1249
sqft
17305
Btuh
Wall total
5063
sqft
15868
Btuh
Door total
168
soft
1623
Btuh
Ceiling total
3820
sqft
3932
Btuh
Floor total
1985
sqft
7310
Btuh
Infiltration
397
cfm
9161
Btuh
Duct loss
Sens. Ventilation 0
cfm
10043
Btuh
Subtotal
0
65244
Btuh
Ventilation
0
cfm
0
Btuh
TOTAL HEAT LOSS
Btuh
Latent gain(infiltration)
65244
Btuh
Summer Cooling Load, for
CEilings(6.O%
Windows(265%
••. •
• •
••••
• •••
• • •
•. •
Floors(11.2%) )
SUMMER CALCULATION
Load component
Load
Window total 1249
sqft
35749
Btuh
Wall total 5063
sqft
12846
Btuh
Door total 168
sqft
1613
Btuh
Ceiling total 3820
sqft
6741
Btuh
Floor total
0
Btuh
Infiltration 339
cfm
6331
Btuh
Internal gain
11080
Btuh
Duct gain
7398
Btuh
Sens. Ventilation 0
cfm
0
Btuh
Blower Load
0
Btuh
Total sensible gain
81757
Btuh
Latent gain(ducts)
2251
Btuh
Latent gain(infiltration)
12892
Btuh
Latent gain(ventilation)
0
Btuh
Latent gain(internal/occupants/other)
3950
Btuh
Total latent gain
19093
Btuh
TOTAL HEAT GAIN
100850
Btuh
8th Edition
.•••e•
• • • Iv • • •
• • •
•-• In
•
• •• •
•• •• •• •
• • •
• •
•
• •
•.
• •
• •
• •
•�
• •
•• • •••• • •
J1' n dor i f`35.L)
• • •
Cetlings(5.7%) )
Walls)12_ 7%)
InfiI.(19.1%)
Latent int(
Int.Gain(11.0%)
r Ducts(9.6%)
EnergyGauge® System Sizing
PREPARED BY:
DATE:
EnergyGauge® / USRCZB v5.0
System Sizing Calculations - Winter
Residential Load - Room by Room Component Details
Project Title:
ROBERT MORENO REMODELING
Building Type: User
671 NE 105 ST
MIAMI SHORES, FL -
5/16/2016
Reference City: Miami, FL (Defaults) Winter Temperature Difference: 21.0 F (TMY3 99%)
Component Loads for Room #1: AC 1
Window
Panes/Type Frame U Orientation Area(sqft) X HTM=
Load
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
2, NFRC 0.32 Metal 0.66 SE 3.6 13.9
2, NFRC 0.32 Metal 0.66 SE 3.6 13.9
2, NFRC 0.32 Metal 0.66 SE 3.6 13.9
2, NFRC 0.32 Metal 0.66 NW 10.0 13.9
2, NFRC 0.32 Metal 0.66 NW 10.0 13.9
2, NFRC 0.32 Metal 0.66 NW 10.0 13.9
2, NFRC 0.32 Metal 0.66 NW 10.0 13.9
2, NFRC 0.32 Metal 0.66 NW 10.0 13.9
2, NFRC 0.32 Metal 0.66 NE 10.0 13.9
2, NFRC 0.32 Metal 0.66 NE 10.0 13.9
2, NFRC 0.32 Metal 0.66 NE 56.0 13.9
2, NFRC 0.32 Metal 0.66 NE 56.0 13.9
2, NFRC 0.32 Metal 0.66 N 59.4 13.9823•Itu'h•
2, NFRC 0.32 Metal 0.66 E 79.1 13.9
2, NFRC 0.32 Metal 0.66 S 59.4 13.9
Window Total 390.9(sqft)
50 Btuh
50 Btuh
50 Btuh
139 Btuh
139 Btuh
139 Btuh
139 Btuh
139 Btuh
139 Btuh
139 Btuh
776 Btuh
776 Btuh
•••• •: 1097 itu
82315t,ut
• 5417 Btt.jh
Walls
1
2
3
4
5
6
7
Type Ornt. Ueff. R -Value Area X HTM=
(Cav/Sh)
Conc BIk,Hollow - Ext (0.149) 4.1/0.0 610 3.13
Conc BIk,Hollow - Ext (0.149) 4.1/0.0 429 3.13
Conc BIk,Hollow - Ext (0.149) 4.1/0.0 247 3.13•
Conc BIk,Hollow - Ext (0.149) 4.1/0.0 367 3.13
Conc BIk,Hollow - Ext (0.149) 4.1/0.0 841 3.13
Conc BIk,Hollow - Ext (0.149) 4.1/0.0 41 3.13
Conc BIk,Hollow - Ext (0.149) 4.1/0.0 31 3.13
Wall Total 2565(sqft)
• •.. Low •
• •• ••
•••• 1912 Btuii•
••••-• 1344.13tyli
• • 774 Btufi
• • 1151,1,
: ••.2635•Btuh
'• • 128.81'i •
96 Bfuh
8039 Btuh
Doors
1
2
3
4
Type Storm Ueff. Area X HTM=
Wood - Exterior, w (0.460) 21 9.7
Wood - Exterior, w (0.460) 21 9.7
Wood - Exterior, w (0.460) 21 9.7
Wood - Exterior, w (0.460) 21 9.7
Door Total 84(sqft)
Load
203 Btuh
203 Btuh
203 Btuh
203 Btuh
811 Btuh
Floors
1
Type Ueff. R -Value Size X HTM=
Slab On Grade (1.180) 0.0 295.0 ft(perim.) 24.8
Floor Total 1985 sqft
Load
7310 Btuh
7310 Btuh
Room Envelope Subtotal:
21578 Btuh
Infiltration
Type Wholehouse ACH Room Volume Wall Ratio CFM=
Natural 0.41 19850 0.51 201.0
4641 Btuh
Duct Toad
Average sealed, Supply(R6.0-Attic), Return(R6.0-Cond.) (DLM of 0.145)
EneravGauoe® / USRCZB v5.0
3813 Btuh
•
.'
•
• •
• •
�•
• •
• •
Page 1
Manual J Winter Calculations
Residential Load - Component Details (continued)
Project Title:
ROBERT MORENO REMODELING
Building Type: User
671 NE 105 ST
MIAMI SHORES, FL -
5/16/2016
Room #1
Sensible Room Subtotal
30032 Btuh
Component Loads for Room #2: AC 2
Window
Panes/Type Frame U
Orientation Area(sqft) X
HTM=
Load
16
2, NFRC 0.32 Metal 0.66
SE 34.6
13.9
479 Btuh
17
2, NFRC 0.32 Metal 0.66
SE 34.6
13.9
479 Btuh
18
2, NFRC 0.32 Metal 0.66
SE 34.6
13.9
479 Btuh
19
2, NFRC 0.32 Metal 0.66
NW 10.0
13.9
139 Btuh
20
2, NFRC 0.32 Metal 0.66
NW 10.0
13.9
139 Btuh
21
2, NFRC 0.32 Metal 0.66
NW 10.0
13.9
139 Btuh
22
2, NFRC 0.32 Metal 0.66
NW 26.3
13.9
364 Btuh
23
2, NFRC 0.32 Metal 0.66
NE 26.3
13.9
364 Btuh
24
2, NFRC 0.32 Metal 0.66
NW 48.0
13.9
665•Uu'h'
25
2, NFRC 0.32 Metal 0.66
NW 48.0
13.9
•„••
: 665 §tyh
26
2, NFRC 0.32 Metal 0.66
N 28.5
13.9
395•Qf ih
27
2, NFRC 0.32 Metal 0.66
E 38.0
13.9
•
527 Btuh
28
2, NFRC 0.32 Metal 0.66
S 28.5
13.9
395.13tuh•
Window Total
377.3(sqft)
'...•'
52300.Bfuh
Walls
Type Ornt. Ueff.
R -Value Area X
HTM=
Load. ..
(Cav/Sh)
8
Conc BIk,Hollow - Ext (0.149)
4.1/0.0 266
3.13IP
•
• 835 Btuti
9
Conc BIk,Hollow - Ext (0.149)
4.1/0.0 159
3.13
•
• 498;1;it
10
Conc BIk,Hollow - Ext (0.149)
4.1/0.0 166
3.13
; .•.
519•Btuh
11
Conc BIk,Hollow - Ext (0.149)
4.1/0.0 474
3.13
••
• 1485.8t'W,
12
Conc BIk,Hollow - Ext (0.149)
4.1/0.0 71
3.13
224 8fuh
13
Conc BIk,Hollow - Ext (0.149)
4.1/0.0 82
3.13
257 Btuh
14
Conc BIk,Hollow - Ext (0.149)
4.1/0.0 151
3.13
475 Btuh
Wall Total
1370(sqft)
4292 Btuh
Doors
Type Storm Ueff.
Area X
HTM=
Load
5
Wood - Exterior, w (0.460)
21
9.7
203 Btuh
6
Wood - Exterior, w (0.460)
21
9.7
203 Btuh
7
Wood - Exterior, w (0.460)
21
9.7
203 Btuh
Door Total
63(sqft)
609Btuh
Ceilings
Type/Color/Surface Ueff.
R -Value Area X
HTM=
Load
1
Vented Attic/D/Tile (0.049)
19.0/0.0 1930
1.0
1987 Btuh
Ceiling Total
1930(sgft)
1987Btuh
Room Envelope Subtotal:
12117 Btuh
Infiltration
Type Wholehouse ACH Room Volume Wall Ratio
CFM=
Natural
0.41 19300 0.27
107.3
2478 Btuh
•
•
.'
•
• •
• •
• •
•
• •
• •
EnergyGauge®/ USRCZB v5.0 Page 2
Manual J Winter Calculations
Residential Load - Component Details (continued)
Project Title:
ROBERT MORENO REMODELING
Building Type: User
671 NE 105 ST
MIAMI SHORES, FL -
5/16/2016
Duct load
Average sealed, Supply(R6.0-Attic), Return(R6.0-Cond.) (DLM of 0.213)
3115 Btuh
Room #2
Sensible Room Subtotal
17711 Btuh
Component Loads for Room #3: AC 3
Window
Panes/Type Frame U Orientation Area(sqft) X HTM=
Load
29
2, NFRC 0.32 Metal 0.66 SW 97.1 13.9
1346 Btuh
30
2, NFRC 0.32 Metal 0.66 S 32.4 13.9
449 Btuh
31
2, NFRC 0.32 Metal 0.66 SW 97.1 13.9
1346 Btuh
32
2, NFRC 0.32 Metal 0.66 SW 60.1 13.9
833 Btuh
33
2, NFRC 0.32 Metal 0.66 SW 30.1 13.9
417 Btuh
34
2, NFRC 0.32 Metal 0.66 SW 48.6 13.9
• •
673' EMC
35
2, NFRC 0.32 Metal 0.66 SE 32.4 13.9
•.••
: 449 15ti{J1.
36
2, NFRC 0.32 Metal 0.66 SW 9.0 13.9
125•15t.Rt
37
2, NFRC 0.32 Metal 0.66 SE 32.4 13.9
•
449 Btuilt
38
2, NFRC 0.32 Metal 0.66 SE 7.9 13.9
•
110.Btuh.
39
2, NFRC 0.32 Metal 0.66 NE 33.3 13.9
''
462:Bfuii.
Window Total 480.4(sqft)
6658 Kit,
Walls
Type Ornt. Ueff. R -Value Area X HTM=
(Cav/Sh)
• •• • •
•
• Loads ••
•
15
Conc BIk,Hollow - Ext (0.149) 4.1/0.0 173 3.13
•
• 543Ntjtrt;
16
Conc BIk,Hollow - Ext (0.149) 4.1/0.0 38 3.13
: .•.
118'Btuh
17
18
Conc BIk,Hollow - Ext (0.149) 4.1/0.0 70 3.13
Conc BIk,Hollow - Ext (0.149) 4.1/0.0 164 3.13
••
' 219.8tUi',
513 gtuh
19
Conc BIk,Hollow - Ext (0.149) 4.1/0.0 567 3.13
1778 Btuh
20
Conc BIk,Hollow - Ext (0.149) 4.1/0.0 117 3.13
366 Btuh
Wall Total 1129(sgft)
3537 Btuh
Doors
Type Storm Ueff. Area X HTM=
Load
8
Wood - Exterior, w (0.460) 21 9.7
203 Btuh
Door Total 21(sgft)
203Btuh
Ceilings
Type/Color/Surface Ueff. R -Value Area X HTM=
Load
2
Vented Attic/D/Tile (0.049) 19.0/0.0 1890 1.0
1946 Btuh
Ceiling Total 1890(sqft)
1946Btuh
Room Envelope Subtotal:
12344 Btuh
Infiltration
Type Wholehouse ACH Room Volume Wall Ratio CFM=
Natural 0.41 18900 0.22 88.4
2042 Btuh
Duct Toad
Average sealed, Supply(R6.0-Attic), Return(R6.0-Cond.) (DLM of 0.217)
3115 Btuh
••
•
. •
• •
•
• •
EnergyGauge® / USRCZB v5.0 Page 3
Manual J Winter Calculations
Residential Load - Component Details (continued)
Project Title:
ROBERT MORENO REMODELING
Building Type: User
671 NE 105 ST
MIAMI SHORES, FL -
5/16/2016
Room #3
Sensible Room Subtotal
17501 Btuh
SYSTEM GROUPS (BLOCK LOADS)
Heating Loads
For System(s):1
Serving Rooms: 1
Block load
30032 Btuh
Heating Loads
For System(s):2
Serving Rooms: 2
Block load
• •..
• . .
•.• • • .
•••;•If711 Bitch
••.• ••
• . •
....
. •
•
•
•
•
•
•
•
•
• • •
Heating Loads
For System(s):3
Serving Rooms: 3
Block load
•. ••
.
• • •
•
•17501•
�itrtr•
1NHOLE HOUSE TOTALS
Totals for Heating
Subtotal Sensible Heat Loss
Ventilation Sensible Heat Loss
Total Heat Loss
65244 Btuh
0 Btuh
65244 Btuh
EQUIPMENT
1. Electric Strip Heat
2. Electric Strip Heat
3. Electric Strip Heat
34000 Btuh
34000 Btuh
34000 Btuh
•
•
.
.
EnergyGauge® / USRCZB v5.0 Page 4
. •
• •
• .
•
•
•
•
Manual J Winter Calculations
Residential Load - Component Details (continued)
Project Title:
ROBERT MORENO REMODELING
Building Type: User
671 NE 105 ST
MIAMI SHORES, FL -
Key: Window types - NFRC (Requires U -Factor and Shading coefficient(SHGC) of glass as numerical values)
or - Glass as 'Clear' or 'Tint' (Uses U -Factor and SHGC defaults)
U - Window U -Factor)
HTM - (ManualJ Heat Transfer Multiplier)
5/16/2016
Version 8
• • ••••
• • • .
•• • • ••• •
• • • •
.• •
•
•••• •• •
• • • • •
•••• • ••
• •••
• • • • •
•• •• •• •
• •
• •
• • • .
• • • •
• • • • •
• • •
•• • •••• • •
• • •
EnergyGaugee / USRCZB v5.0 Page 5
System SlzIn • Calculations - Su r
Residential Load - Room by Room Component Details
Project Title:
ROBERT MORENO REMODELING
671 NE 105 ST
MIAMI SHORES, FL -
Reference City: Miami, FL
Component Loads for Room #1: AC
5/16/2016
Temperature Difference: 17.0F(TMY3 99%) Humidity difference: 56gr.
1
Window
Type*
Panes SHGC U InSh
IS
Omt
Overhang
Len Hgt
Window Area(sqft)
Gross Shaded Unshaded
HTM
Shaded Unshaded
Load
1
2 NFRC 0.32, 0.66 No
No
SE
2.0ft.
12.0f
3.6
0.0 3.6
I 18
33
121 Btuh
2
2 NFRC 0.32, 0.66 No
No
SE
2.0ft.
12.0f
3.6
0.0 3.6
18
33
121 Btuh
3
2 NFRC 0.32, 0.66 No
No
SE
2.0ft.
12.0f
3.6
0.0 3.6
18
33
121 Btuh
4
2 NFRC 0.32, 0.66 No
No
NW
2.0ft.
12.0f
10.0
0.0 10.0
18
33
334 Btuh
5
2 NFRC 0.32, 0.66 No
No
NW
2.0ft.
12.0f
10.0
0.0 10.0
18
33
334 Btuh
6
2 NFRC 0.32, 0.66 No
No
NW
2.0ft.
12.0f
10.0
0.0 10.0
18
33
334 Btuh
7
2 NFRC 0.32, 0.66 No
No
NW
2.0ft.
12.0f
10.0
0.0 10.0
18
33 334 Btuh
8
2 NFRC 0.32, 0.66 No
No
NW
2.0ft.
12.0f
10.0
0.0 10.0
18
33 334 Btuh
9
2 NFRC 0.32, 0.66 No
No
NE
2.0ft.
12.0f
10.0
0.0 10.0
18
33 334 Btuh
10
2 NFRC 0.32, 0.66 No
No
NE
2.0ft.
12.0f
10.0
0.0 10.0
18
33 334 Btuh
11
2 NFRC 0.32, 0.66 No
No
NE
2.0ft.
12.0f
56.0
0.0 56.0
18
33 1866 Btuh
12
2 NFRC 0.32, 0.66 No
No
NE
2.0ft.
12.0f
56.0
0.0 56.0
18
33 1866 Btuh
13
2 NFRC 0.32, 0.66 No
No
N
2.0ft.
12.0f
59.4
0.0 59.4
18
18 1078 Btuh
14
2 NFRC 0.32, 0.66 No
No
E
2.0ft.
12.0f
79.1
0.0 79.1
18
42 33i7i •Bttflh
15
2 NFRC 0.32, 0.66 No
No
S
2.0ft.
12.0f
59.4
59.4 0.0
18
19. • 107$ •litaih
Window Total
391 (sqft)
' • • : 1194$ B# i,
Walls
Type
U -Value R -Value
Area(sqft)
HTM..:.. Load • •
Cav/Sheath
•••r••
1
Concrete BIk,Hollow - Ext
0.15
4.1/0.0
610.0
2.5 • • •. 1543 BtWh
2
Concrete BIk,Hollow- Ext
0.15
4.1/0.0
428.9
2.5'.. .' 10:8'I fj
3
Concrete BIk,Hollow - Ext
0.15
4.1/0.0
247.0
2.5 627• IM
4
Concrete BIk,Hollow- Ext
0.15
4.1/0.0
367.1
• • • • .
2.5 • • 981 Btuh
5
Concrete BIk,Hollow- Ext
0.15
4.1/0.0
840.6
2.5" " 2131.Btuni
6
Concrete BIk,Hollow - Ext
0.15
4.1/0.0
40.9
2.5:":': 104 Btuh
7
Concrete BIk,Hollow - Ext
Wall Total
0.15
4.1/0.0
30.6
2565 (sqft)
2.5 • • :MT:
:
: 6568 Btuh
Doors
Type
Area (sqft)
.•
HIM" • Loo •: • •
1
Wood - Exterior
21.0
9.6 202' Btu
2
Wood - Exterior
21.0
9.6 202 Btuh
3
Wood - Exterior
21.0
9.6 202 Btuh
4
Wood - Exterior
21.0
9.6 202 Btuh
Door Total
84 (sqft)
806 Btuh
Floors
Type
R -Value
Size
HTM Load
1
Slab On Grade
0.0
1985 (ft -perimeter)
0.0 0 Btuh
Floor Total
1985.0 (sqft)
0 Btuh
Zone FnvPInna Si ihtnfal• 1 a')ia Pf..t,
EnergyGauge® / USRCZB v5.0 Page 1
671 NE 105 ST
Manual J Summer Calculations
Residential Load - Component Details (continued)
Project Title: Climate:FL_MIAMI_INTL_AP
ROBERT MORENO REMODELING
MIAMI SHORES, FL -
5/16/2016
Infiltration
Type Wholehouse ACH Volume(cuft) Wall Ratio
Natural 0.35 19850 0.51
CFM=
171.5
Load
3207 Btuh
Internal
gain
Occupants Btuh/occupant
3 X 230 +
Appliance
1750
Load
2440 Btuh
Sensible Envelope Load:
24906 Btuh
Duct load
Average sealed, Supply(R6.0-Attic), Return(R6.0-Cond.)
(DGM of 0.110)
2733 Btuh
Sensible Zone Load
27639 Btuh
Component Loads for Room #2: AC 2
Area(sqft)
HTM
Load
Type*
Overhang
Window
Window
Panes SHGC U InSh IS Omt
Len
Hgt
Gross
Shaded Unshade
Shaded
Unshaded
••••
16
17
2 NFRC 0.32, 0.66 No No SE
2 NFRC 0.32, 0.66 No No SE
2.0ft.
2.0ft.
1.5ft.
1.5ft.
34.6
34.6
14.4 20.1
14.4 20.1
18
18
33•
33•
•
r •
9% AV
935 Btuh
18
2 NFRC 0.32, 0.66 No No SE
2.0ft.
1.5ft.
34.6
14.4 20.1
18
33 '' '
915' gltub
19
2 NFRC 0.32, 0.66 No No NW
2.0ft.
1.5ft.
10.0
0.0 10.0
18
33"'}L"
334'BtuA
20
2 NFRC 0.32, 0.66 No No NW
2.0ft.
1.5ft.
10.0
0.0 10.0
18
336 • • } • •
334 6tuh
21
2 NFRC 0.32, 0.66 No No NW
2.0ft.
1.5ft.
10.0
0.0 10.0 18
33 • • •
384 Btch
22
2 NFRC 0.32, 0.66 No No NW
2.0ft.
1.5ft.
26.3
0.0 26.3 18
Tl
33••••••
8,:5' IaruA
23
24
2 NFRC 0.32, 0.66 No No NE
2 NFRC 0.32, 0.66 No No NW
2.0ft.
2.0ft.
1.5ft.
1.5ft.
26.3
48.0
0.0 26.3
0.0 48.0
18
18
34,•••••
33• • •
874 Bib
1599• Etuh
25
2 NFRC 0.32, 0.66 No No NW
2.0ft.
1.5ft.
48.0
0.0 48.0
18
• •
33
159 BtA
26
2 NFRC 0.32, 0.66 No No N
2.0ft.
1.5ft.
28.5
0.0 28.5
18
18;""
•
•
518 Atuh
27
28
2 NFRC 0.32, 0.66 No No E
2 NFRC 0.32, 0.66 No No S
2.0ft.
2.0ft.
1.5ft.
1.5ft.
38.0
28.5
2.0 36.1
28.5 0.0
18
18
42
19
•
•
15gi • PR
548 Btuh
Window Total
377 (sqft)
• • •'
•
11355•Eitrah
Walls
Type U -Value R -Value
Area(sqft)
HTM
Load•. •
Cav/Sheath
8
Concrete BIk,Hollow - Ext 0.15
4.1/0.0
266.3
2.5
676 Btuh
9
Concrete BIk,Hollow - Ext 0.15
4.1/0.0
159.0
2.5
403 Btuh
10
Concrete BIk,Hollow- Ext 0.15
4.1/0.0
165.7
2.5
420 Btuh
11
Concrete BIk,Hollow- Ext 0.15
4.1/0.0
473.8
2.5
1202 Btuh
12
Concrete Blk,Hollow - Ext 0.15
4.1/0.0
71.5
2.5
181 Btuh
13
Concrete BIk,Hollow - Ext 0.15
4.1/0.0
82.0
2.5
208 Btuh
14
Concrete BIk,Hollow - Ext 0.15
4.1/0.0
151.5
2.5
384 Btuh
Wall Total
1370 (sqft)
3475 Btuh
Doors
Type
Area (sqft)
HTM
Load
5
Wood - Exterior
21.0
9.6
202 Btuh
6
Wood - Exterior
21.0
9.6
202 Btuh
7
Wood - Exterior
21.0
9.6
202 Btuh
Door Total
63 (sqft)
605 Btuh
Ceilings
Type/Color/Surface U -Value
R -Value Area(sqft)
HTM
Load
1
Vented Attic/DarkTile 0.049
19.0/0.0
1930.0
1.76
3406 Btuh
Ceiling Total
1930 (sqft)
3406 Btuh
Zone Envelope Subtotal:
18841 Btuh
EnergyGauge® / USRCZB v5.0
�•
•
• •
••
•
• •
Page 2
Manual J Summer Calculations
Residential Load - Component Details (continued)
Project Title: Climate:FL MIAMI INTL AP
671 NE 105 ST
MIAMI SHORES, FL -
ROBERT MORENO REMODELING
5/16/2016
Infiltration
Type Wholehouse ACH Volume(cuft) Wall Ratio
Natural 0.35 19300 0.27
CFM=
91.6
Load
1713 Btuh
Internal
gain
Occupants Btuh/occupant
4 X 230 +
Appliance
3400
Load
4320 Btuh
Sensible Envelope Load:
24873 Btuh
Duct load
Average sealed, Supply(R6.0-Attic), Return(R6.0-Cond.)
(DGM of 0.094)
2332 Btuh
Sensible
Zone
Load
27205 Btuh
Component Loads for Room #3: AC 3
HTM
Load
Type*
Overhang
Window Area(sqft)
Window
Panes SHGC U InSh IS Omt
Len
H.t
Gross
Shaded Unshade.
Shaded
Unshaded
••••
29
2 NFRC 0.32, 0.66 No No SW
2.0ft.
1.5ft.
97.1
40.6 56.5
18
33• i
2622 &11
30
2 NFRC 0.32, 0.66 No No S
2.0ft.
1.5ft.
32.4
32.4 0.0
18
•
19, • •
•
588 Btuh
31
2 NFRC 0.32, 0.66 No No SW
2.0ft.
1.5ft.
97.1
40.6 56.5
18
33 • • •
260 VA
32
2 NFRC 0.32, 0.66 No No SW
2.0ft.
1.5ft.
60.1
40.6 19.5
18
3V"s"
1398'Btufi
33
2 NFRC 0.32, 0.66 No No SW
2.0ft.
1.5ft.
30.1
20.3 9.8
18
33' • • • •
695 Stuh
34
2 NFRC 0.32, 0.66 No No SW
2.Oft.
1.5ft.
48.6
20.3 28.3
18
33 • • •
1344 Btuh
35
2 NFRC 0.32, 0.66 No No SE
2.0ft.
1.5ft.
32.4
13.5 18.8
18
33•••4•6
46.00
36
37
2 NFRC 0.32, 0.66 No No SW
2 NFRC 0.32, 0.66 No No SE
2.0ft.
2.0ft.
1.5ft.
1.5ft.
9.0
32.4
6.6 2.4
13.5 18.8
18
18
31
33 • •
20() ptup
896 Stuh
38
2 NFRC 0.32, 0.66 No No SE
2.0ft.
1.5ft.
7.9
7.9 0.0
18
•
33
141• Btut
39
2 NFRC 0.32, 0.66 No No NE
2.0ft.
1.5ft.
33.3
0.0 33.3
18
'
31";°:
1111 8tuh
Window Total
480 (sqft)
•
124/}9•litt
Walls
Type U -Value R -Value
Area(sqft)
HT* .
•.
Lod
Cav/Sheath
••
'
•""
15
Concrete BIk,Hollow- Ext 0.15
4.1/0.0
173.3
2.5
44b' Btu?i
16
Concrete BIk,Hollow - Ext 0.15
4.1/0.0
37.6
2.5
95 Btuh
17
Concrete BIk,Hollow - Ext 0.15
4.1/0.0
70.0
2.5
178 Btuh
18
Concrete BIk,Hollow - Ext 0.15
4.1/0.0
163.7
2.5
415 Btuh
19
Concrete BIk,Hollow - Ext 0.15
4.1/0.0
567.3
2.5
1439 Btuh
20
Concrete BIk,Hollow- Ext 0.15
4.1/0.0
116.7
2.5
296 Btuh
Wall Total
1129 (sqft)
2863 Btuh
Doors
Type
Area (sqft)
HTM
Load
8
Wood - Exterior
21.0
9.6
202 Btuh
Door Total
21 (sqft)
202 Btuh_
Ceilings
Type/Color/Surface U -Value
R -Value Area(sqft)
HTM
Load 1
2
Vented Attic/DarkTile 0.049
19.0/0.0
1890.0
1.76
3335 Btuh
Ceiling Total
1890 (sqft)
3335 Btuh
Zone Envelope Subtotal:
18849 Btuh
EnergyGauge® / USRCZB v5.0
•
••
•
• •
�•
• •
Page 3
Manual J Summer Calculations
Residential Load - Component Details (continued)
Project Title: Climate:FLMIAMI INTL AP
ROBERT MORENO REMODELING _
671 NE 105 ST
MIAMI SHORES, FL -
5/16/2016
Infiltration
Type Wholehouse ACH Volume(cuft) Wall Ratio CFM=
Natural 0.35 18900 0.22 75.5
Load
1411 Btuh
Internal
gain
Occupants Btuh/occupant Appliance
4 X 230 + 3400
Load
4320 Btuh
Sensible Envelope Load:
24580 Btuh
Duct load
Average sealed, Supply(R6.0-Attic), Return(R6.0-Cond.) (DGM of 0.095)
2333 Btuh
Sensible Zone Load
26912 Btuh
. . . •
.. . . •• . . .
•• .
.. .
.
. •
.... .. . .
• . . .
....• . •
..
. .
.. ..
• ...
.. .
•
.. .
• •
. •
•
..
• • •
..• •••• • •
• • •
EnergyGauge® / USRCZB v5.0 Page 4
Sensible Envelope Load
Window Excursion
Sensible Duct Load (duct gain multiplier of 0.110)
Sensible ventilation
Zone Sensible gain
Latent infiltration/ventilation gain
Latent duct gain
Latent occupant gain
Latent other gain
Total block load
Manual J Summer Calculations
Residential Load - Component Details (continued)
Project Title: Climate:FLMIAMI INTL AP
ROBERT MORENO REMODELING _
671 NE 105 ST
MIAMI SHORES, FL -
5/16/2016
SYSTEM GROUPS (BLOCK LOADS)
Cooling Loads
For System(s):
1
Serving Zones:
1
24906 Btuh
0 Btuh
2733 Btuh
0 Btuh
27639 Btuh
6531 Btuh
825 Btuh
600 Btuh
CP eh%
• • ....
•
35595. 9u4
•• •
•• •
Cooling Loads
For System(s):
2
Serving Zones:
2
Sensible Envelope Load
Window Excursion
Sensible Duct Load (duct gain multiplier of 0.094)
Sensible ventilation
Zone Sensible gain
Latent infiltration/ventilation gain
Latent duct gain
Latent occupant gain
Latent other gain
Total block load
•••
•••
..•
•
•••
•
•
•
•••
• • • 2487&Bath
.••
• :QB
•4dh
•
"2332Btu11
••• •
• • .0 Btuh
••. 2720% Btuh
•
348 $tuh
713 Btuh
800 Btuh
0 Btuh
32206 Btuh
EnergyGauge® / USRCZB v5.0 Page 5
Manual J Summer Calculations
Residential Load - Component Details (continued)
Project Title: Climate:FL_MIAMI_INTL AP
ROBERT MORENO REMODELING
671 NE 105 ST
MIAMI SHORES, FL -
5/16/2016
SYSTEM GROUPS (BLOCK LOADS)
Cooling Loads
For System(s):
3
Serving Zones:
3
Sensible Envelope Load
Window Excursion
Sensible Duct Load (duct gain multiplier of 0.095)
Sensible ventilation
Zone Sensible gain
Latent infiltration/ventilation gain
Latent duct gain
Latent occupant gain
Latent other gain
Total block load
•
24580 Btuh
0 Btuh
2333 Btuh
0 Btuh
26912 Btuh
2874 Btuh
714 Btuh
800 Btuh
1750 Btuh
••••
_ • _ 33049. BteiTt
• • •
WHOLE HOUSE TOTALS • • •
.•.••• •
••••
•• •
36000 Btuh
36000 Btuh
36000 Btuh
Sensible Envelope Load All Zones '•••••74350
Utah
Sensible Duct Load • • •
• 7398' Btu
Total Sensible Zone Loads •••:••81757
•
• Btuh
•
Sensible ventilation•
•
D•'B'tQh
•
.'
• •
Blower • •
• D•Ga
Whole House
Total sensible gain
81757 Btuh
Totals for Cooling
Latent infiltration gain (for 56 gr. humidity difference)
12892 Btuh
Latent ventilation gain
0 Btuh
Latent duct gain
2251 Btuh
Latent occupant gain (11.0 people @ 200 Btuh per person)
2200 Btuh
Latent other gain
1750 Btuh
Latent total gain
19093 Btuh
TOTAL GAIN
100850 Btuh
EQUIPMENT
1. Central Unit
2. Central Unit
3. Central Unit
#
#
#
Pnamv(., ino&l 1 1 ICDr7❑ ..G n
36000 Btuh
36000 Btuh
36000 Btuh
r
671 NE 105 ST
Manual J Summer Calculations
Residential Load - Component Details (continued)
Project Title: Climate:FL MIAMI INTL AP
MIAMI SHORES, FL -
ROBERT MORENO REMODELING
*Key: Window types (Panes - Number and type of panes of glass)
(SHGC - Shading coefficient of glass as SHGC numerical value)
(U - Window U -Factor)
(InSh - Interior shading device: none(No), Blinds(B), Draperies(D) or Roller Shades(R))
- For Blinds: Assume medium color, half closed
For Draperies: Assume medium weave, half closed
For Roller shades: Assume translucent, half closed
(IS - Insect screen: none(N), Full(F) or Half('/=))
(Omt - compass orientation)
5/16/2016
Version 8
• • ••••
• • • •
•• • • ••• •
• • • •
•• •
•
• • •
•••• •• • • •
• to • • •
•••• • ••
• •••
• • • • •
•• •• •• •
•
• • •
• • • •
• •
•
•
*
• • • • •
• • •
•• • •••• • •
0 • •
•• •
EnergyGauge® / USRCZB v5.0 Page 7
671 NE 105 ST
Residential Window Diversity
MidSummer
Project Title:
ROBERT MORENO REMODELING
MIAMI SHORES, FL -
5/16/2016
Weather data for: Miami - Defaults
Summer design temperature
Cooling setpoint
Summer temperature difference
Latitude
92 F
75 F
17 F
25.82 North
Average window load for July
Peak window load for July
Excusion limit(130% of Ave.)
Window excursion (July)
WINDOW Average and Peak Loads
20501 Btu
24673 Btu
26651 Btu
None
24,000
22.000
20,0M
18,000
16."ta
••••
• •
••••
••••
• �•
•••.
• •••
••
. -.
•. •
•
• • • .' •
• •
• •••
• • 4p •g•
• °•
• `a
••••
•• .•
• • .
•
•
'1f
VdindowLoad (Eith)
1 Hour tore
AM
•• •
1E.
Lim itfr_jrexcur ion
0
Total July Window Load(Radiation and conduction)
••••
• • •
• •" s rt
4.U
The midsummer window load for this house does not exceed the window load excursion limit.
This house has adequate midsummer window diversity.
EnergyGauge® System Sizing for Florida residences only
PREPARED BY:
DATE:
/1"1/1 1-1/ 1Z141/1 ILL WI/
5/7 c///,G
EnergyGauge® / USRCZB v5.0
RM
& Associates
immumigramiii
®®sem®®
Living
RM & Associates Consulting, Inc
CGC #1520941
14629 SW 104 street, #498
Miami, FL -33186
(305) 785-5024 office
estimates@rmassoc.com
671_NE_105_ST
1st Floor
Missing Wall 11' X 9' 6"
Missing Wall 42' 6" X 9' 6"
DESCRIPTION
Opens into KITCHEN
Opens into HALL
QNTY UNIT COST
Height: 9' 6"
TOTAL
1. Carpenter - General Framer - per hour
2. R&R Batt insulation - 4" - R11- unfaced batt
3. R&R Batt insulation - 10" - R30 - unfaced batt
4. R&R 1/2" drywall - hung, taped, floated, ready for paint
5. R&R 5/8" drywall - hung, taped, floated, ready for paint
6. R&R Tile floor covering
7. R&R Baseboard - 5 1/4"
8. Paint the walls and ceiling - two coats
4.00 HR @
701.76 SF @
1,003.80 SF @
1,053.69 SF @
1,003.80 SF @
1,003.80 SF @
102.49 LF @
2,057.49 SF @
25.00 .-
0.55
0.55 =
0.75 =
0.75 =
0.80 =
4.25
2.25 =
0.40 =
100.00
385.97
752.85
790.26
803.04
4,266.15
230.60
823.00
Kitchen
Missing Wall
Missing Wall
Missing Wall
DESCRIPTION
2' 5 15/16" X 8'
3' 7 1/8" X 8'
11'X8,
Opens into HALL
Opens into HALL
Opens into LIVING
QNTY UNIT COST
Height: 8'
TOTAL
9. Carpenter - General Framer - per hour
10. R&R Batt insulation - 4" - RI 1- unfaced batt
11. R&R Batt insulation - 10" - R30 - unfaced batt
12. R&R 1/2" drywall - hung, taped, floated, ready for paint
13. R&R 5/8" drywall - hung, taped, floated, ready for paint
14. R&R Tile floor covering
15. R&R Cabinetry - lower (base) units
16. R&R Cabinetry - upper (wall) units
17. R&R Countertop - Granite or Marble
18. R&R Sink - double
19. R&R Sink faucet - Kitchen
20. R&R Baseboard - 5 1/4"
21. Paint the walls and ceiling - two coats
4.00 HR @
149.06 SF @
249.79 SF @
372.65 SF @
249.79 SF @
249.79 SF @
32.00 LF @
33.00 LF @
113.00 SF @
1.00 EA@
1.00 EA @
46.58 LF @
622.44 SF @
25.00
0.55 =
0.75 =
0.75 =
0.80 =
4.25 =
180.22 --
178.34
178.34 =
69.84 =
349.03 =-
218.43
218.43 =
2.25 =
0.40 =
100.00
81.98
187.35
279.49
199.83
1,061.61
5,767.04
5,885.22
7,891.92
349.03
218.43 P
104.81
248.98
RM
& Associates
11111111111111611111111
®®111111®s
RM & Associates Consulting, Inc
CGC #1520941
14629 SW 104 street, #498
Miami, FL -33186
(305) 785-5024 office
estimates@rmassoc.com
Laundry
Subroom: AC (1)
DESCRIPTION
Height: 8'
Height: 8'
QNTY UNIT COST TOTAL
22. Carpenter - General Framer - per hour
23. R&R Batt insulation - 4" - R11- unfaced batt
24. R&R Batt insulation - 10" - R30 - unfaced batt
25. R&R 1/2" drywall - hung, taped, floated, ready for paint
26. R&R 5/8" drywall - hung, taped, floated, ready for paint
27. R&R Tile floor covering
28. R&R Baseboard - 5 1/4"
29. Paint the walls and ceiling - two coats
2.00 HR @
69.19 SF @
130.14 SF @
461.25 SF @
130.14 SF @
130.14 SF @
57.66 LF @
591.39 SF @
25.00 =
0.55 .-
0.75
0.75 =
0.75 =
0.80 =
4.25 --
2.25
2.25 =
0.40
50.00
38.06
97.61
345.94
104.11
553.10
129.74
236.56
Hall
Missing Wall
Missing Wall
Missing Wall
DESCRIPTION
42'6"X8'
3'71/8"X8'
2'315/16"X8'
Opens into LIVING
Opens into KITCHEN
Opens into KITCHEN
QNTY UNIT COST
Height: 8'
TOTAL
30. R&R Batt insulation - 4" - RI 1- unfaced batt
31. R&R Batt insulation - 10" - R30 - unfaced batt
32. R&R 1/2" drywall - hung, taped, floated, ready for paint
33. R&R 5/8" drywall - hung, taped, floated, ready for paint
34. R&R Tile floor covering
35. R&R Baseboard - 5 1/4"
36. Paint the walls and ceiling - two coats
487.64 SF @
624.97 SF @
325.10 SF @
124.99 SF @
624.97 SF @
203.18 LF @
2,250.45 SF @
0.55 =
0.75 --
0.75
0.75 =
0.80 --
4.25
4.25 =
2.25 =
0.40 =
268.20
468.73
243.83
99.99
2,656.12
457.16
900.18
Hall Bathroom
DESCRIPTION
Height: 8'
QNTY UNIT COST TOTAL
37. Carpenter - General Framer - per hour
38. R&R Batt insulation - 4" - R11- unfaced batt
39. R&R Batt insulation - 10" - R30 - unfaced batt
40. R&R 1/2" drywall - hung, taped, floated, ready for paint
41. R&R 5/8" drywall - hung, taped, floated, ready for paint
42. R&R 1/2" Cement board
43. R&R Tile
2.00 HR @
45.87 SF @
48.00 SF @
229.33 SF @
48.00 SF @
90.00 SF @
90.00 SF @
25.00 = 50.00
0.55 = 25.22
0.75 = 36.00
0.75 = 172.00
0.80 = 38.40
2.75 = 247.50
4.51 = 405.90
671_NE_105_ST 9/27/2016 Page:2
RM & Associates Consulting, Inc
&Associates CGC #1520941
14629 SW 104 street, #498
mouis®®� Miami, FL -33186
(305) 785-5024 office
estimates@rmassoc.com
DESCRIPTION
CONTINUED - Hall Bathroom
QNTY UNIT COST TOTAL
44. R&R Tile floor covering 48.00 SF @ 4.25 = 204.00
45. R&R Baseboard - 5 1/4" 28.67 LF @ 2.25 = 64.51
46. Paint the walls and ceiling - two coats 277.33 SF @ 0.40 = 110.93
47. R&R Toilet 1.00 EA @ 125.00 = 125.00 7
48. R&R Vanity 2.00 LF @ 150.47 = 300.94
Bedroom 1 Height: 8'
Subroom: Closet (1) Height: 8'
DESCRIPTION QNTY UNIT COST TOTAL
49. Carpenter - General Framer - per hour
50. R&R Batt insulation - 4" - R 11- unfaced batt
51. R&R Batt insulation - 10" - R30 - unfaced batt
52. R&R 1/2" drywall - hung, taped, floated, ready for paint
53. R&R 5/8" drywall - hung, taped, floated, ready for paint
54. R&R Oak flooring
55. R&R Baseboard - 5 1/4"
56. Paint the walls and ceiling - two coats
10.00 HR@
134.91 SF @
353.74 SF @
299.51 SF @
353.74 SF @
353.80 SF @
112.43 LF @
1,253.17 SF @
25.00 -
0.55 =
0.75 --
0.75
0.75 =
0.80 =-
4.50
4.50 =
2.25 =
0.40 -
250.00
74.20
265.31
224.64
282.99
1,592.10
252.97
501.27
Bathroom 1 Height: 8'
DESCRIPTION
QNTY UNIT COST TOTAL
57. Carpenter - General Framer - per hour
58. R&R Batt insulation - 4" - R11- unfaced batt
59. R&R Batt insulation - 10" - R30 - unfaced batt
60. R&R 1/2" drywall - hung, taped, floated, ready for paint
61. R&R 5/8" drywall - hung, taped, floated, ready for paint
62. R&R 1/2" Cement board
63. R&R Tile
64. R&R Tile floor covering
2.00 HR @
67.20 SF @
109.56 SF @
336.00 SF @
109.56 SF @
90.00 SF @
90.00 SF @
109.56 SF @
25.00 = 50.00
0.55 = 36.96
0.75 = 82.17
0.75 = 252.00
0.80 - 87.65
2.75 = 247.50
4.51 = 405.90
4.25 = 465.63
671_NE_105_ST 9/27/2016 Page:3
RMRM & Associates Consulting, Inc
&Associates CGC #1520941
14629 SW 104 street, #498
®�®m Miami, FL -33186
(305) 785-5024 office
estimates@rmassoc.com
DESCRIPTION
CONTINUED - Bathroom 1
QNTY UNIT COST TOTAL
65. R&R Baseboard - 5 1/4" 42.00 LF @ 2.25 = 94.50
66. Paint the walls and ceiling - two coats 445.56 SF @ 0.40 = 178.22
67. R&R Toilet 1.00 EA @ 125.00 = 125.00 f
68. R&R Vanity 7.00 LF @ 150.47 = 1,053.29
Bedroom 2 Height: 8'
Subroom: Closet (1) Height: 8'
DESCRIPTION QNTY UNIT COST TOTAL
69. Carpenter - General Framer - per hour
70. R&R Batt insulation - 4" - R11- unfaced batt
71. R&R Batt insulation - 10" - R30 - unfaced batt
72. R&R 1/2" drywall - hung, taped, floated, ready for paint
73. R&R Oak flooring
74. R&R Baseboard - 5 1/4"
75. Paint the walls and ceiling - two coats
4.00 HR @
185.55 SF @
286.09 SF @
74.22 SF @
286.09 SF @
92.77 LF @
1,028.28 SF @
25.00 --
0.55
0.55 =
0.75 =
0.75 =-
4.50
4.50 =
2.25 =
0.40
100.00
102.05
214.57
55.66
1,287.41
208.73
411.31
Bathroom 2
DESCRIPTION
Height: 8'
QNTY UNIT COST TOTAL
76. Carpenter - General Framer - per hour
77. R&R Batt insulation - 4" - R11- unfaced batt
78. R&R Batt insulation - 10" - R30 - unfaced batt
79. R&R 1/2" drywall - hung, taped, floated, ready for paint
80. R&R 5/8" drywall - hung, taped, floated, ready for paint
81. R&R 1/2" Cement board
82. R&R Tile
83. R&R Tile floor covering
84. R&R Baseboard - 5 1/4"
85. Paint the walls and ceiling - two coats
2.00 HR @
56.00 SF @
73.78 SF @
280.00 SF @
73.78 SF @
90.00 SF @
90.00 SF @
73.78 SF @
35.00 LF @
353.78 SF @
25.00 = 50.00
0.55 = 30.80
0.75 = 55.34
0.75 = 210.00
0.80 = 59.03
2.75 = 247.50
4.51 = 405.90
4.25 = 313.57
2.25 = 78.75
0.40= 141.51
671 NE 105_ST 9/27/2016 Page:4
RmRM & Associates Consulting, Inc
&Assoc iates CGC #1520941
14629 SW 104 street, #498
®® Miami, FL -33186
(305) 785-5024 office
estimates@rmassoc.com
DESCRIPTION
CONTINUED - Bathroom 2
QNTY UNIT COST TOTAL
86. R&R Toilet
87. R&R Vanity
1.00 EA @ 125.00 = 125.00 7
4.00 LF @ 150.47 = 601.88
Bedroom 3 Height: 8'
Subroom: Closet (1) Height: 8'
DESCRIPTION QNTY UNIT COST TOTAL
88. Carpenter - General Framer - per hour 3.00 HR @ 25.00 = 75.00
89. R&R Batt insulation - 4" - R11- unfaced batt 549.35 SF @ 0.55 = 302.14
90. R&R Batt insulation - 10" - R30 - unfaced batt 248.39 SF @ 0.75 = 186.30
91. R&R 1/2" drywall - hung, taped, floated, ready for paint 82.49 SF @ 0.75 = 61.86
92. R&R 5/8" drywall - hung, taped, floated, ready for paint 248.39 SF @ 0.80 = 198.71
93. R&R Oak flooring 248.39 SF @ 4.50 = 1,117.76
94. R&R Baseboard - 5 1/4" 103.11 LF @ 2.25 = 232.00
95. Paint the walls and ceiling - two coats 1,073.25 SF @ 0.40 = 429.30
Bathroom 3
DESCRIPTION
Height: 8'
QNTY UNIT COST TOTAL
96. Carpenter - General Framer - per hour
97. R&R Batt insulation - 4" - R11- unfaced batt
98. R&R Batt insulation - 10" - R30 - unfaced batt
99. R&R 1/2" drywall - hung, taped, floated, ready for paint
100. R&R 5/8" drywall - hung, taped, floated, ready for paint
101. R&R 1/2" Cement board
102. R&R Tile
103. R&R Tile floor covering
104. R&R Baseboard - 5 1/4"
105. Paint the walls and ceiling - two coats
106. R&R Toilet
2.00 HR @ 25.00 = 50.00
61.02 SF @ 0.55 = 33.56
86.42 SF @ 0.75 = 64.82
305.10 SF @ 0.75 = 228.83
86.42 SF @ 0.80 = 69.13
90.00 SF @ 2.75 = 247.50
90.00 SF @ 4.51 = 405.90
86.42 SF @ 4.25 = 367.29
38.14 LF @ 2.25 = 85.82
391.52 SF @ 0.40 = 156.61
1.00 EA @ 125.00 = 125.00 P
671 NE 105 ST 9/27/2016 Page:5
RM & Associates Consulting, Inc
& Associates CGC #1520941
14629 SW 104 street, #498
ME
®® Miami, FL -33186
(305) 785-5024 office
estimates@rmassoc.com
DESCRIPTION
CONTINUED - Bathroom 3
QNTY UNIT COST TOTAL
I07. R&R Vanity 4.00 LF @ 150.47 = 601.88
Bedroom 4 Height: 8'
Subroom: Closet (1) Height: 8'
Subroom: Closet (2) Height: 8'
DESCRIPTION QNTY UNIT COST TOTAL
108. Carpenter - General Framer - per hour
109. R&R Batt insulation - 4" - R11- unfaced batt
110. R&R Batt insulation - 10" - R30 - unfaced batt
111. R&R 1/2" drywall - hung, taped, floated, ready for paint
112. R&R 5/8" drywall - hung, taped, floated, ready for paint
113. R&R Tile floor covering
114. R&R Baseboard - 5 1/4"
115. Paint the walls and ceiling - two coats
2.00 HR @ 25.00 = 50.00
189.98 SF @ 0.55 = 104.49
270.78 SF @ 0.75 = 203.09
759.92 SF @ 0.75 = 569.94
270.78 SF @ 0.80 = 216.63
270.78 SF @ 4.25 = 1,150.82
94.99 LF @ 2.25 = 213.73
1,030.70 SF @ 0.40 = 412.28
Garage
DESCRIPTION
Height: 8'
QNTY UNIT COST TOTAL
116. Paint the walls - two coats 777.57 SF @
0.40 - 311.03
Half Bath
DESCRIPTION
Height: 8'
QNTY UNIT COST TOTAL
117. R&R Tile floor covering
118. R&R Baseboard - 5 1/4"
119. Paint the walls and ceiling - two coats
17.88 SF @
17.98 LF @
161.69 SF @
4.25 =
2.25
0.40 =
75.99
40.46
64.68
671 NE 105 ST
9/27/2016 Page: 6
RM
& Associates
1311101111111111111111
RM & Associates Consulting, Inc
CGC #1520941
14629 SW 104 street, #498
Miami, FL -33186
(305) 785-5024 office
estimates@rmassoc.com
2nd Floor
Family Room
DESCRIPTION
QNTY UNIT COST
Height: 7' 6"
TOTAL
120. Carpenter - General Framer - per hour
121. R&R Batt insulation - 4" - R11- unfaced batt
122. R&R 1/2" drywall - hung, taped, floated, ready for paint
123. R&R 5/8" drywall - hung, taped, floated, ready for paint
124. R&R Tile floor covering
125. R&R Baseboard - 5 1/4"
126. Paint the walls and ceiling - two coats
8.00 HR @
381.62 SF @
1,146.01 SF @
782.47 SF @
782.47 SF @
152.82 LF @
1,928.47 SF @
25.00 =-
0.55
0.55 =
0.75 =
0.80 =
4.25 =
2.25 =
0.40 =
200.00
209.89
859.51
625.97
3,325.50
343.85
771.39
Pool Room
DESCRIPTION
QNTY UNIT COST
Height: 7' 6"
TOTAL
127. Carpenter - General Framer - per hour
128. R&R Batt insulation - 4" - R11- unfaced batt
129. R&R 1/2" drywall - hung, taped, floated, ready for paint
130. R&R 5/8" drywall - hung, taped, floated, ready for paint
131. R&R Tile floor covering
132. R&R Baseboard - 5 1/4"
133. Paint the walls and ceiling - two coats
4.00 HR @
264.38 SF @
528.75 SF @
267.72 SF @
267.72 SF @
70.50 LF @
796.47 SF @
25.00 =
0.55 =
0.75 =
0.80 =
4.25 =
2.25 -
0.40 =
100.00
145.41
396.56
214.17
1,137.81
158.63
318.59
Sit Down Room
DESCRIPTION
QNTY UNIT COST
Height: 7' 6"
TOTAL
134. Carpenter - General Framer - per hour
135. R&R Batt insulation - 4" - R11- unfaced batt
136. R&R 1/2" drywall - hung, taped, floated, ready for paint
137. R&R 5/8" drywall - hung, taped, floated, ready for paint
138. R&R Tile floor covering
139. R&R Baseboard - 5 1/4"
140. Paint the walls and ceiling - two coats
2.00 HR @
240.63 SF @
96.25 SF @
250.00 SF @
250.00 SF @
64.17 LF @
731.25 SF @
25.00 =
0.55
0.75
0.80 =
4.25 =
2.25 =
0.40 =
50.00
132.35
72.19
200.00
1,062.50
144.38
292.50
Gym
671 NE 105 ST
Height: 7' 6"
9/27/2016 Page: 7
RMRM & Associates Consulting, Inc
&Associates CGC #1520941
14629 SW 104 street, #498
ssoisinfais®® Miami, FL -33186
(305) 785-5024 office
estimates@rmassoc.com
DESCRIPTION
QNTY UNIT COST TOTAL
141. Carpenter - General Framer - per hour 8.00 HR @ 25.00 = 200.00
142. R&R Batt insulation - 4" - R11- unfaced batt 213.95 SF @ 0.55 = 117.67
143. R&R 1/2" drywall - hung, taped, floated, ready for paint 321.25 SF @ 0.75 = 240.94
144. R&R 5/8" drywall - hung, taped, floated, ready for paint 451.56 SF @ 0.80 - 361.25
145. R&R Tile floor covering 451.56 SF @ 4.25 = 1,919.13
146. R&R Baseboard - 5 1/4" 85.67 LF @ 2.25 = 192.76
147. Paint the walls and ceiling - two coats 1,094.06 SF @ 0.40 = 437.62
Gym Bathroom Height: 7' 6"
DESCRIPTION
QNTY UNIT COST TOTAL
148. Carpenter - General Framer - per hour
149. R&R Batt insulation - 4" - R11- unfaced batt
150. R&R 1/2" drywall - hung, taped, floated, ready for paint
151. R&R 5/8" drywall - hung, taped, floated, ready for paint
152. R&R 1/2" Cement board
153. R&R Tile
154. R&R Tile floor covering
155. R&R Baseboard - 5 1/4"
156. Paint the walls and ceiling - two coats
157. R&R Toilet
158. R&R Vanity
2.00 HR @ 25.00 - 50.00
52.65 SF @ 0.55 = 28.96
210.58 SF @ 0.75 = 157.94
49.00 SF @ 0.80 = 39.20
90.00 SF @ 2.75 = 247.50
90.00 SF @ 4.51 = 405.90
49.00 SF @ 4.25 = 208.25
28.08 LF @ 2.25 = 63.18
259.58 SF @ 0.40 = 103.83
1.00 EA @ 125.00 = 125.00 P
2.00 LF @ 150.47 = 300.94
Steam Room
DESCRIPTION
Height: 7' 6"
QNTY UNIT COST TOTAL
159. R&R Batt insulation - 4" - R11- unfaced batt
160. R&R 1/2" Cement board
161. R&R Tile floor covering
162. R&R Tile
47.19 SF @
228.29 SF @
39.54 SF @
228.29 SF @
0.55 =
2.75=
4.25 =
4.51 =
25.96
627.80
168.05
1,029.59
Sauna
DESCRIPTION
Height: 7' 6"
QNTY UNIT COST TOTAL
671_NE_105_ST 9/27/2016 Page: 8
RM
& Associates
3311911111111111•9
IMENIMMINNE
RM & Associates Consulting, Inc
CGC #1520941
14629 SW 104 street, #498
Miami, FL -33186
(305) 785-5024 office
estimates@rmassoc.com
CONTINUED - Sauna
DESCRIPTION
QNTY UNIT COST
TOTAL
170. Carpenter - General Framer - per hour
171. R&R Batt insulation - 4" - R11- unfaced batt
177. R&R Cedar lining
174. R&R Tile floor covering
8.00 HR @
54.75 SF @
222.42 SF @
29.00 SF @
25.00 .-
0.55
0.55 =
4.32 =
4.25 =
200.00
30.11
960.86
123.25
General
DESCRIPTION
QNTY UNIT COST
TOTAL
164. Electrical (Bid Item)
165. Plumbing (Bid Item)
166. Mechanical (Bid Item)
167. Windows - Aluminum (Bid Item)
1.00 EA @
1.00 EA @
1.00 EA @
1.00 EA @
12,500.00 =
9,600.00 =
12,900.00 =
38,000.00 =
12,500.00
9,600.00 t 114 l A,
12,900.00 #to -19,
38,000.00
Exterior
DESCRIPTION
QNTY UNIT COST
TOTAL
168. R&R Stucco - natural gray - troweled
169. Exterior - seal or prime then paint
2,500.00 SF @
2,500.00 SF @
1.75 =
0.85 =
4,375.00
2,125.00
Grand Total Areas:
12,173.52 SF Walls
5,942.16 SF Floor
0.00 SF Long Wall
5,942.16 Floor Area
7,453.71 Exterior Wall Area
0.00 Surface Area
0.00 Total Ridge Length
671_NE_105_ST
5,942.11 SF Ceiling
660.24 SY Flooring
0.00 SF Short Wall
6,012.92 Total Area
829.29 Exterior Perimeter of
Walls
0.00 Number of Squares
0.00 Total Hip Length
18,115.63 SF Walls and Ceiling
1,520.50 LF Floor Perimeter
1,520.50 LF Ceil. Perimeter
12,236.10 Interior Wall Area
0.00 Total Perimeter Length
9/27/2016 Page: 9
RhiRM & Associates Consulting, Inc
&Associates CGC #1520941
14629 SW 104 street, #498
[11111.111111®® Miami, FL -33186
(305) 785-5024 office
estimates@rmassoc.com
Summary
Line Item Total 157,258.04
Overhead @ 10.0% 15,725.80
Profit @ 5.0% 7,862.90
Replacement Cost Value
Net Claim
RM & Associates Consulting, Inc
671 NE 105 ST
$180,846.74
$180,846.74
9/27/2016 Page: 10
2nd Floor
19' 1"
18' 9"
11' 9"
18' 11" /I
tt1
11' 1
2' 10"
32' 9"
18' 9"
Famfv Room
671 NE 105 ST
19' 5"
32' 5"
T
T
18' 8"
6' 4" —i
21' 7"
earn
18' 9"
19' 5"
9/27/2016 Page: 11
1st Floor
1— 6 °
19' 1"
I-- 11' 9' --I 1
18' 11" � :4--:7° `y.
a
19' 1
10' 4' o3
114III14ty
13'8"
4'10°i 4' 10
4'6 �4
4 6'
Mall datMwip,
1 1
vac
4
20' 11"
24' 3'
212.1
2'10 rS
24' 11'
42 6
nal
T1 30'9
30'6' 'V
19' 1
Asdroom 3
15 4"
16' —1
671 NE 105 ST 9/27/2016 Page: 12
STATE LICENSED CONTRACTOR RF0066479/CTQB-/97P000310
RORIVED
OCT 9 2016
BY: .,(A.
9190 NW 119 ST –HIALEAH GARDENS FLORIDA 33018: (305)-821-2880 -FAX: (305) 821-6494
E-MAIL: bigplumbingcorp@gmail.com Established -1997
PROPOSAL AND CONTRACT
TO: RM DESIGN + BUILD CORPORATION
C/O ROBERT MORENO
PROJECT: 671 N.E. 105 ST
FOLIO NO.11-2231-012-0100
DATE: October 18, 2016
THIS ESTIMATE IS GIVEN ACCORDING TO BLUEPRINTS SUBMITTED TO US.
THIS ESTIMATE IS VALID 30 DAYS. AFTER 30 DAYS PRICE IS SUBJECT TO CHANGE.
WE HEREBY SUBMIT SPECIFICATIONS AND ESTIMATES FOR THE FOLLOWING PROJECT:
"671 N.E. 105 ST- REMODEL"
PLUMBING SCOPE OF WORK
MASTER BATHROOM BATHROOM LEFT SIDE . .
D 2X SINKS D 1 -NEW SHOWER WITYK,AcTCET .... . •
•
D 1 -SHOWER D 1 -NEW HAND SINK 14411,NAUCJT • • •
> 1- BATHTUB WITH FAUCET D 1—NEW TOILET •• • •
D 1 -TOILET ..••.• •
CORE -DRILL • • •
2X WATER HEATERS N210 TITAN •• • •
•• •• ••••
SECOND FLOOR BATHROOM -LEFT SIDE
D 1 -NEW HAND- SINK
D 1 -NEW SHOWER
D 1- NEW TOILET
D RELOCATE HOT/COLD WATER
CORE -DRILL
• • • •
BATHROOM BACK TO BACifJTHM4SJ'1R • .
D 1 -NEW SHOWER •
.• •
D CHANGE AND MOVEMENT OF THE BATHTUB'S
FAUCET
D 1—TOILET
D 1 -HAND SINK
LAST BATHROOM: GARAGE:
D NEW SHOWER CHANGE TOILET
D CHANGE FAUCET LAUNDRY:
D 1 -TOILET NEW DRAINAGE LAUNDRY
> 1 -HAND SINK RELOCATE HOT/COLD WATER
CORE -DRILL
• CHANGE 5 HOSE-BIB(S) OUTSIDE OF HOUSE
1
•
STATE UCENSED CONTRACTOR RF0066479/CTQB-/97P000310
9190 NW 119 ST—HIALEAH GARDENS FLORIDA 33018: (305)-821-2880 -FAX: (305) 821-6494
E-MAIL: bigplumbingcorp@gmail.com Established -1997
TO: RM DESIGN + BUILD CORPORATION
C/O ROBERT MORENO
PROJECT: 671 N.E. 105 ST
FOLIO NO.11-2231-012-0100
TOTAL CONTRACT PRICE:
$9,600.00
PAYMENT SCHEDULE WILL BE AS FOLLOWS:
***************************************
15% DUE AT SIGNING
35% DUE UPON GROUND INSPECTION
25 %DUE UPON TOP -OUT
25% DUE UPON FINAL INSPECTION
DATE: October 18, 2016
. .. .
.. . .... .
. .
... •
.
*UNLESS OTHERWISE STIPULATED IN THE AFORE -MENTIONED SCOPE OF WORK: • • • • • •
BIG PLUMBING CORP -WILL BE RESPONSIBLE FOR: • • •• •• •• • •
INSTALLATION OF ALL FIXTURES.• • • • •
• • . • •
•
GENERAL CONTRACTOR OR OWNER WILL BE RESPONSIBLE FOR: • • • • • • • • .'
PERMIT COST. '•• '
ANY REVISION OR ASBUILT. • .
ALL FIXTURES AND FAUCETS. •
ALL SPECIAL FIXTURES WITH SPECIFICATIONS. • • •
ALL CABINETS AND COUNTER TOPS TO BE SET IN PLACE FOR BIG PLUMBING CORP. TO CONNECT.
OPENING OF GRANITE OR MARBLE TOP FOR LAVATORY INSTALLATION.
ALL GAS EQUIPMENT SET IN PLACE FOR BIG PLUMBING CORP. TO CONNECT.
FIRE CAULKING IF NECESSARY
ROOF PENETRATION AND ROOF PENETRATION RESTORATION IF ANY.
PROVIDING FAVORABLE ACCESS TO PERFORM WORK.
ALL WORK THAT IS REQUIRED IN ADDITION TO WHAT IS LISTED OR ANY UNFORSEEN SITUATION BEYOND OUR
CONTROL UPON WORK IN PROGRESS
WILL BE AN EXTRA CHARGE, AND WILL ONLY BE COMMENCED UPON WRI I ThN APPROVAL.
EXTRA CHARGES ARE BILLED SEPARATELY AND DUE UPON WRITTEN APPROVAL.
2
STATE LICENSED CONTRACTOR RF0066479/CTQB-/97P000310
9190 NW 119 ST—HIALEAH GARDENS FLORIDA 33018: (305)-821-2880 -FAX: (305) 821-6494
E-MAIL: bigplumbingcorp@gmail.com Established -1997
STANDARD CONDITIONS CLAUSE
BIG PLUMBING CORP. IS NOT RESPONSIBLE FOR ANY LANDSCAPING, TREE REMOVAL, TREE DAMAGE, SOD
OR SAND REPLACEMENT. UNDERGROUND UTILITIES, POOL PIPING, PRIVATE ELECTRIC LINES, SPRINKLERS,
MISCELLANEOUS PRIVATE WATER LINES, DRIVEWAYS, SIDE WALKS, ASPHALT REPLACEMENT OR FENCES THAT
MAY BE DAMAGED OR SHOULD BE RELOCATED OR DEMOLISHED TO PERFORM THE ABOVE DESCRIBED WORK.
NOTE: THE BACKFILLING OF DITCHES TO BE DONE WITH THE SAME EXCAVATION MATERIAL GENERATED BY
THE WORK PERFORMED. IF THE D.O.H. REQUIRES BACKFILL OF TANK AND DRAINFIELD TO BE SAND OR ANY
OTHER SUITABLE MATERIAL A SEPARATE ADDED AMOUNT WILL BE GIVEN.
NOTE: IF REQUIRED BY YOUR MANAGEMENT COMPANY THAT THEY BE INCLUDED AS "ADDITIONAL INSURED"
IN OUR GENERAL LIABILITY POLICY, THEN AND ADDITIONAL CHARGE OF $100.00 PER "ADDITIONAL INSURED"
WILL BE ADDED TO THE ESTIMATE.
NOTE: FAVORABLE ACCESS IS REQUIRED TO ALLOW HEAVY EQUIPMENT IF NECESSARY
SHOULD THERE BE ANY OBSTRUCTION AND /OR LIMITED SPACE TO MANEUVER, THEN ADDITIONS QST AND
REASONABLE PROFIT SHOULD BE ADDED THE ABOVE QUOTE AMOUNT.••• • •
.. . .... .
BIG PLUMBING CORP. WILL NOT GUARANTEE STOPAGES '
ACCORDING TO FLORIDA'S CONSTRUCTION LIEN LAW (SEC. 713.001-713.37, FLORIDA S'TA LIES), THOSE WHO. .
WORK ON YOUR PROPERTY OR PROVIDE MATERIALS AND ARE NOT PAID IN FULL HAVE. RIGHT WO EiTFOR( • • • •:
THEIR CLAIM FOR PAYMNET AGAINST YOUR PROPERTY. THIS CLAIM IS KNOWN AS A C3O14aRUCtI6N• LIEN. •W: • • •
YOUR CONTRACTOR OR A SUB- CONTRACTOR FAILS TO PAY SUBCONTRACTORS, SUB-StrEQNTRtC,'P01tS, OR* • • •
MATERIAL SUPPLIERS OR NEGLECTS TO MAKE OTHER LEGALLY REQUIRED PAYMENTS! 'TIIE PEOPL•E•WHO AIM •; •
OWED MONEY MAY LOOK TO YOUR PROIPERTY FOR PAYMENT, EVEN IF YOU HAVE PM?713UR CONTRACTOR IN.
FULL. IF YOU FAIL TO PAY YOUR CONTRACTOR. YOUR CONTRACTOR MAY ALSO HAVE A LIEN Off. Qt
PROPERTY. THIS MEANS IF A LIEN IS FILED YOUR PROPERTY COULD BE SOLD AGAINST YOUR WILL, TO PAY t'(Ti .:
LABOR, MATERIALS, OR OTHER SERVICES THAT YOUR CONTRACTOR OR A SUBCONTRA'CTO� . MAY•f1•A•VE•
•
FAILED TO PAY. FLORIDA'S CONSTRUCTION LIEN LAW IS COMPLEX AND IT IS RECOMMENDED THAT •
WHENEVER A SPECIFIC PROBLEM ARISES, YOU CONSULT AN ATTORNEY.
ACCEPTANCE
*************
THE ABOVE PRICE, SPECIFICATIONS AND CONDITIONS ARE
SATISFACTORY AND HEREBY ACCEPTED.
YOU ARE AUTHORIZED TO DO THE WORK SPECIFIED.
PAYMENT WILL BE MADE AS OUTLINED ABOVE.
GENERAL CONTRACTOR/OWNER(S)
PRINT NAME: ---------------- —
BIG PLUMBING CORP.
BY:
3
Transformers Electric
16E000300
1420 Brickell Bay dr 407C
Miami, Florida 33131
ATT: Robert Moreno
ADDRESS: 671 NE 105 St
CITY: Miami Shores
305.300.0462
PROPOSAL/CONTRACT No: 0701-16
DATE: July 11, 2016
SUBJECT:
. STATE: Florid
TELEPHONE: (786) 348-39036 LOCATION: MIAMI SHORES
ATTENTION: ARCHITECT:
TRANSFORMERS ELECTRIC Proposes to furnish materials and services only as expressly detailed below:
TRANSFORMERS ELECTRIC PROPOSES TO FURNISH MATERIALS & SERVICES LISTED BELOW WITH
EXCEPTIONS AS NOTED BELOW UNDER "INCLUDES" & "EXCLUDES".
ALL LISTED MATERIALS & SERVICES FOR THE SUM OF S 13,000.00
ALL CHANGES TO BE IN WRITIING AND APPROVED BY OWNER.
TRANSFORMERS ELECTRIC SPECIFICALLY
1.) ALL ELECTRICAL FOR NEW ADDIITON
2.) ALL PANELS REQUIRED BY PLANS
3.) HIGH HATT TRIM ONLY
TRANSFORMERS ELECTRIC SPECIFICALLY
1.1 PERMIT FEE TO BE PAID BY OWNER
2.) LIGHTING FIXTURES
3.) REMOVAL OF DEBRIS
• •
"INCLUDES" THE FOLLOWING II EMS IN TIS BA$E BID: •
• • •
•• • ••••
• •
..••
"EXCLUDES" THE FOLLOWING ITEMS FROWN. 'BASE 3?1 • •
• •
• ••
• • •
••••
•
• • •
• • • •
PROPOSAL FIRM UNTIL: AUG 15. 2016 PROPOSED FOR TRANSFORMERS EL'itar
TERMS: SE VE BY: JOSE CHAO
•
ACCEPTED F APPROVED FOR TRANSFORMERS ELECTRIC.
Pu chasers
BY:
Signature
•
• • •
•• •
BY:
DATE OF ACCEPTANCE: DATE:
Title
Marno A/C Service Inc.
2012 West 73rd Street
Hialeah, Florida 33016
(305)885-2195 — (305)823-2195
Email: rnarnoa.c(a)bellsouth.net
October 13, 2016
Angler Development
Job: Robert Moreno
671 N..K 105th Street
Miami Shores, Florida 33138
SCOPE OF WORK
• THREE SETS OF REF. LINES 7/8 & 3/8 INSULATED
• INSTALLATION OF FIVE(5) BATH EXHAUST FANS(50CFM
• INSTALLATION OF ONE(1) BATH EXHAUST FAN(100CFM)
• INSTALLATION OF ONE(1) 4" WALL CAP FOR DRYER
• INSTALLATION OF THREE(3) DUCTWORK SYSTEMS MADE OF
FIBERGLASS & FLEX DUCTS R-6 SUPPLY
• INSTALLATION OF RETURN AIR BY PASS• • ••
• INSTALLATION OF SUPPLY & RETURN AIR GRILLES •..•. •• •
•
TOTAL $12,900.00
•
•
•••• • • • •
• •
• ••
• • • • •
•• •• ••••
•
• • • ▪ •
• • • •
• • 0 s •
• • •
•• • •••• • •
0 • •
4
RM
& Associates
®®®®s7
Living
RM & Associates Consulting, Inc
CGC #1520941
14629 SW 104 street, #498
Miami, FL -33186
(305) 785-5024 office
estimates@rmassoc.com
671_NE_105_ST
1st Floor
Missing Wall 11' X 9' 6"
Missing Wall 42' 6" X 9' 6"
DESCRIPTION
Opens into KITCHEN
Opens into HALL
QNTY UNIT COST
Height: 9' 6"
TOTAL
Carpenter - General Framer - per hour
R&R Batt insulation - 4" - R11- unfaced batt
R&R Batt insulation - 10" - R30 - unfaced batt
R&R 1/2" drywall - hung, taped, floated, ready for paint
R&R 5/8" drywall - hung, taped, floated, ready for paint
R&R Tile floor covering
R&R Baseboard - 5 1/4"
Paint the walls and ceiling - two coats
4.00 HR@
701.76 SF @
1,003.80 SF @
1,053.69 SF @
1,003.80 SF @
1,003.80 SF @
102.49 LF @
2,057.49 SF @
25.00 =
0.55 =
0.75 =
0.75 =
0.80 =
4.25 =
2.25 =-
0.40
0.40 =
100.00
385.97
752.85
790.26
803.04
4,266.15
230.60
823.00
Kitchen
Missing Wall
Missing Wall
Missing Wall
DESCRIPTION
2'515/16"X8'
3'71/8"X8'
11' X 8'
• •
• • •
•• •
•
Opens into HALM.
•.•.
Opens into HALT. •
Opens into LIVI!••:
•• ••
QNTY I1NI DOST
•
•
•••. •
•
••••
Height+ $; • •
▪ • •
• •
•
• ••
•
••••
•
• •
• TOTAL •.
Carpenter - General Framer - per hour
R&R Batt insulation - 4" - R11- unfaced batt
R&R Batt insulation - 10" - R30 - unfaced batt
R&R 1/2" drywall - hung, taped, floated, ready for paint
R&R 5/8" drywall - hung, taped, floated, ready for paint
R&R Tile floor covering
R&R Cabinetry - lower (base) units
R&R Cabinetry - upper (wall) units
R&R Countertop - Granite or Marble
R&R Sink - double
R&R Sink faucet - Kitchen
R&R Baseboard - 5 1/4"
Paint the walls and ceiling - two coats
4.00 HR @
149.06 SF @
249.79 SF @
372.65 SF @
249.79 SF @
249.79 SF @
32.00 LF @
33.00 LF @
113.00 SF @
1.00 EA @
1.00 EA @
46.58 LF @
622.44 SF @
• •
2• .5.00 = •
•••• 0:55=
0.75 =
0.75 =
0.80 =-
4.25
4.25 =
180.22 =
178.34 =
69.84 =
349.03 =
218.43 =
2.25 =
0.40 =
•• • •
• • •
•• •
100.00 •
81:1��•:
187.35
279.49
199.83
1,061.61
5,767.04
5,885.22
7,891.92
349.03
218.43
104.81
248.98
RmRM & Associates Consulting, Inc
&Associates CGC #1520941
14629 SW 104 street, #498
m®®a® Miami, FL -33186
(305) 785-5024 office
estimates@rmassoc.com
Laundry
Subroom: AC (1)
DESCRIPTION
Height: 8'
Height: 8°
QNTY UNIT COST TOTAL
Carpenter - General Framer - per hour
R&R Batt insulation - 4" - R11- unfaced batt
R&R Batt insulation - 10" - R30 - unfaced batt
R&R 1/2" drywall - hung, taped, floated, ready for paint
R&R 5/8" drywall - hung, taped, floated, ready for paint
R&R Tile floor covering
R&R Baseboard - 5 1/4"
Paint the walls and ceiling - two coats
2.00 HR
69.19 SF @
130.14 SF @
461.25 SF @
130.14 SF @
130.14 SF @
57.66 LF @
591.39 SF @
25.00 =
0.55 =
0.75 =
0.75 =
0.80
4.25 --
2.25
2.25 =0.40 =
50.00
38.06
97.61
345.94
104.11
553.10
129.74
236.56
Hall Height: 8'
Missing Wall 42' 6" X 8' Opens into LIVING• •
Missing Wall 3' 7 1/8" X 8' Opens into KITEHEN • •
Missing Wall 2' 3 15/16" X 8' Opens into KITCITEN' • "'' . • .
• •••
DESCRIPTION QNTY IrdFF (,•OST • TOTiv, • •:
R&R Batt insulation - 4" - R11- unfaced batt
R&R Batt insulation - 10" - R30 - unfaced batt
R&R 1/2" drywall - hung, taped, floated, ready for paint
R&R 5/8" drywall - hung, taped, floated, ready for paint
R&R Tile floor covering
R&R Baseboard - 5 1/4"
Paint the walls and ceiling - two coats
487.64 SF @
624.97 SF @
325.10 SF @
124.99 SF @
624.97 SF @
203.18 LF @
2,250.45 SF @
a .
••••J155 = • 268.211..
••.•475= • •••• 468!?3:•••
• • • gi.75 = •••• 243:83':'
• • MO •• 99.99 ••
. .4.25 = . 2,656.12 •
•••• 2;25= •••• 457,16 •
. • .
0.40 = •' • 900.18
Hall Bathroom
DESCRIPTION
Height: 8'
QNTY UNIT COST TOTAL
Carpenter - General Framer - per hour 2.00 HR @ 25.00 = 50.00
R&R Batt insulation - 4" - R11- unfaced batt 45.87 SF @ 0.55 = 25.22
R&R Batt insulation - 10" - R30 - unfaced batt 48.00 SF @ 0.75 = 36.00
R&R 1/2" drywall - hung, taped, floated, ready for paint 229.33 SF @ 0.75 = 172.00
R&R 5/8" drywall - hung, taped, floated, ready for paint 48.00 SF @ 0.80 = 38.40
R&R 1/2" Cement board 90.00 SF @ 2.75 = 247.50
R&R Tile 90.00 SF @ 4.51 = 405.90
671_NE_105_ST 10/18/2016 Page:2
RM & Associates Consulting, Inc
&Associates CGC #1520941
14629 SW 104 street, #498
ENE
®®® Miami, FL -33186
(305) 785-5024 office
estimates@rmassoc.com
DESCRIPTION
CONTINUED - Hall Bathroom
QNTY UMT COST TOTAL
R&R Tile floor covering
R&R Baseboard - 5 1/4"
Paint the walls and ceiling - two coats
R&R Toilet
R&R Vanity
48.00 SF @
28.67 LF @
277.33 SF @
1.00 EA @
2.00 LF @
4.25 =
2.25 =
0.40 =
125.00 .-
150.47
150.47 -
204.00
64.51
110.93
125.00
300.94
Bedroom 1 Height: 8'
Subroom: Closet (1) •Height: 8'
•
DESCRIPTION QNTY IINTMOST • TOTItr'r
Carpenter - General Framer - per hour
R&R Batt insulation - 4" - R11- unfaced batt
R&R Batt insulation - 10" - R30 - unfaced batt
R&R 1/2" drywall - hung, taped, floated, ready for paint
R&R 5/8" drywall - hung, taped., floated, ready for paint
R&R Oak flooring
R&R Baseboard - 5 1/4"
Paint the walls and ceiling - two coats
Bathroom 1
DESCRIPTION
.. • ••••
10.00 HR @ ....2.5.00= •.... • 250.84.:.
134.91 SF@ ••••455= • 74;4Q.•;
353.74 SF @ . "' 11.75 = ' 26531 •
299.51 SF@ "�0675= • •• 224.41.••
353.74 SF @ ..'.1%80 = '....'
353.80 SF@ •..'+SO= • 1,592.10 ••
112.43 LF @ 2 25 = ' 252Vt • • •
1,253.17 SF @ • • 0!40 = • 501;,�T • • ;
Height: 8'
QNTY UNIT COST TOTAL
Carpenter - General Framer - per hour
R&R Batt insulation - 4" - R11- unfaced batt
R&R Batt insulation - 10" - R30 - unfaced batt
R&R 1/2" drywall - hung, taped, floated, ready for paint
R&R 5/8" drywall - hung, taped, floated, ready for paint
R&R 1/2" Cement board
R&R Tile
R&R Tile floor covering
671NE105ST
2.00 HR @ 25.00 = 50.00
67.20 SF @ 0.55 = 36.96
109.56 SF @ 0.75 = 82.17
336.00 SF @ 0.75 = 252.00
109.56 SF @ 0.80 = 87.65
90.00 SF @ 2.75 = 247.50
90.00 SF @ 4.51 = 405.90
109.56 SF @ 4.25 = 465.63
10/18/2016 Page: 3
RmRM & Associates Consulting, Inc
&Associates CGC #1520941
14629 SW 104 street, #498
®®®E Miami, FL -33186
(305) 785-5024 office
estimates@rmassoc.com
DESCRIPTION
CONTINUED - Bathroom 1
QNTY UNIT COST TOTAL
R&R Baseboard - 5 1/4"
Paint the walls and ceiling - two coats
R&R Toilet
R&R Vanity
42.00 LF @
445.56 SF @
1.00 EA @
7.00 LF @
2.25 =
0.40=
125.00 =
150.47 =
94.50
178.22
125.00
1,053.29
Bedroom 2
Subroom: Closet (1)
DESCRIPTION
Height: 8'
Height: 8'
QNTY UNIT COST • • TOTAL
Carpenter - General Framer - per hour
R&R Batt insulation - 4" - R11- unfaced batt
R&R Batt insulation - 10" - R30 - unfaced batt
R&R 1/2" drywall - hung, taped, floated, ready for paint
R&R Oak flooring
R&R Baseboard - 5 1/4"
Paint the walls and ceiling - two coats
4.00 HR@ •_,'25500= . •••• 100.00 ••
185.55 SF@ ....A55= ••.•.• 102,05•:•
286.09 SF@ •••••9!75= • 21457...:
74.22 SF @ •'• tI.75 = ' • 55766 •
286.09 SF @ ....4 50 = • .. 1,287.U..•
92.77 LF@ •.•.x,:25= '•...• 208.7.3.•.•
•
1,028.28 SF@ :••:@:40 = • 411.31 •.
• •
• • •
•• •
Bathroom 2
•
.. •
• •
•••• • •
• . •
•• •
Height: 8'
DESCRIPTION QNTY UNIT COST TOTAL
Carpenter - General Framer - per hour 2.00 HR @ 25.00 = 50.00
R&R Batt insulation - 4" - R11- unfaced batt 56.00 SF @ 0.55 = 30.80
R&R Batt insulation - 10" - R30 - unfaced batt 73.78 SF @ 0.75 = 55.34
R&R 1/2" drywall - hung, taped, floated, ready for paint 280.00 SF @ 0.75 = 210.00
R&R 5/8" drywall - hung, taped, floated, ready for paint 73.78 SF @ 0.80 = 59.03
R&R 1/2" Cement board 90.00 SF @ 2.75 = 247.50
R&R Tile 90.00 SF @ 4.51 = 405.90
R&R Tile floor covering 73.78 SF @ 4.25 = 313.57
R&R Baseboard - 5 1/4" 35.00 LF @ 2.25 = 78.75
Paint the walls and ceiling - two coats 353.78 SF @ 0.40 = 141.51
671 NE 105 ST
10/18/2016 Page:4
RmRM & Associates Consulting, Inc
&Associates CGC#1520941
®w® 14629 SW 104 street, #498
===n1 Miami, FL -33186
(305) 785-5024 office
estimates@rmassoc.com
DESCRIPTION
CONTINUED - Bathroom 2
QNTY UNIT COST TOTAL
R&R Toilet
R&R Vanity
1.00 EA @ 125.00 = 125.00
4.00 LF @ 150.47 = 601.88
Bedroom 3
Subroom: Closet (1)
DESCRIPTION
Height: 8'
Height: 8'
QNTY UNIT COST TOTAL
Carpenter - General Framer - per hour
R&R Batt insulation - 4" - RI1- unfaced batt
R&R Batt insulation - 10" - R30 - unfaced batt
R&R 1/2" drywall - hung, taped, floated, ready for paint
R&R 5/8" drywall - hung, taped, floated, ready for paint
R&R Oak flooring
R&R Baseboard - 5 1/4"
Paint the walls and ceiling - two coats
3.00 HR @
549.35 SF @
248.39 SF @
82.49 SF @
248.39 SF @
248.39 SF @
103.11 LF @
1,073.25 SF @
25.00 = 75.00
•
0.55 = • 302.14
••0;5= •.... 186.30 ••
••••0•75= •••••• 61u8....
••••6580= • 1987J •
••••4•50 - • • 1,117976 •
••••LP= • •• 232.Q0•••
••••040= ••...• 429.89••••
Bathroom 3
DESCRIPTION
Carpenter - General Framer - per hour 2.00 HR @ 25.00 = 50.00
R&R Batt insulation - 4" - R11- unfaced batt 61.02 SF
@ 0.55 = 33.56
R&R Batt insulation - 10" - R30 - unfaced batt 86.42 SF @ 0.75 = 64.82
R&R 1/2" drywall - hung, taped, floated, ready for paint 305.10 SF
@ 0.75 = 228.83
R&R 5/8" drywall - hung, taped, floated, ready for paint 86.42 SF
@ 0.80 = 69.13
R&R 1/2" Cement board 90.00 SF
R&R Tile @ 2.75 = 247.50
90.00 SF @ 4.51 = 405.90
R&R Tile floor covering 86.42 SF
@ 4.25 = 367.29
R&R Baseboard - 5 1/4" 38.14 LF @ 2.25 = 85.82
Paint the walls and ceiling - two coats 391.52 SF @ 0.40 - 156.61
R&R Toilet 1.00 EA @ 125.00 = 125.00
• • •
•
• • • •
• • •
• • .
•• • •..•
• . •
• Weight: 8'
QNTY UNIT COST TOTAL
671_N E 105 ST
10/18/2016 Page:5
& Associates
EINEMMEMEM
o®®®■
RM & Associates Consulting, Inc
CGC #1520941
14629 SW 104 street, #498
Miami, FL -33186
(305) 785-5024 office
estimates@rmassoc,com
CONTINUED - Bathroom 3
DESCRIPTION
QNTY UNIT COST TOTAL
R&R Vanity 4.00 LF @
150.47 = 601.88
Bedroom 4
Subroom: Closet (1)
Subroom: Closet (2)
DESCRIPTION
Height: 8'
Height: 8'
Height: 8'
QNTY UNIT COST TOTAL
Carpenter - General Framer - per hour
R&R Batt insulation - 4" - R11- unfaced batt
R&R Batt insulation - 10" - R30 - unfaced batt
R&R 1/2" drywall - hung, taped, floated, ready for paint
R&R 5/8" drywall - hung, taped, floated, ready for paint
R&R Tile floor covering
R&R Baseboard - 5 1/4"
Paint the walls and ceiling - two coats
2.00 HR @
189.98 SF @
270.78 SF @
759.92 SF @
270.78 SF @
270.78 SF @
94.99 LF @
1,030.70 SF @
25.00 = •
• .0.55 =
.• .• 4.75= ••..
•
6.75= ••••
•
11.80 =
•..• ••
•.••.4.25 =
3.25= • ••
• • • • •
•• ••0.40= ••••
•
50.00
1044...
203.09.
569.924 • • •
21b.6i•••:
•
1,15452• .
21.4•06
6
412/8*:•
Garage
DESCRIPTION
• . •
• •
• •
• . •
•
•
•. • ••.•
• • .
Height: 8'
QNTY UNIT COST TOTAL
Paint the walls - two coats 777.57 SF @ 0.40 = 311.03
Half Bath
DESCRIPTION
Height: 8'
QNTY UNIT COST TOTAL
R&R Tile floor covering
R&R Baseboard - 5 1/4"
Paint the walls and ceiling - two coats
17.88 SF @ 4.25 = 75.99
17.98 LF @ 2.25 = 40.46
161.69 SF @ 0.40 = 64.68
671_NE_105_ST 10/18/2016 Page: 6
RM & Associates Consulting, Inc
&Associates CGC #1520941
14629 SW 104 street, #498
amisamison
a®®®na Miami, FL -33186
(305) 785-5024 office
estimates@rmassoc. corn
Family Room
DESCRIPTION
2nd Floor
Height: 7' 6"
QNTY UNIT COST TOTAL
Carpenter - General Framer - per hour
R&R Batt insulation - 4" - R11- unfaced batt
R&R 1/2" drywall - hung, taped, floated, ready for paint
R&R 5/8" drywall - hung, taped, floated, ready for paint
R&R Tile floor covering
R&R Baseboard - 5 1/4"
Paint the walls and ceiling - two coats
8.00 HR @ 25.00 = 200.00
381.62 SF @ 0.55 = 209.89
1,146.01 SF @ 0.75 = 859.51
782.47 SF @ 0.80 = 625.97
782.47 SF @ 4.25 = 3,325.50
152.82 LF @ 2.25 = 343.85
1,928.47 SF @ 0.40 = 771.39
Pool Room
DESCRIPTION
Height: 7' 6"
QNTY UNIT COST TOTAL
Carpenter - General Framer - per hour
R&R Batt insulation - 4" - R11- unfaced batt
R&R 1/2" drywall - hung, taped, floated, ready for paint
R&R 5/8" drywall - hung, taped, floated, ready for paint
R&R Tile floor covering
R&R Baseboard - 5 1/4"
Paint the walls and ceiling - two coats
4.00 HR @
264.38 SF @
528.75 SF @
267.72 SF @
267.72 SF @
70.50 LF @
796.47 SF @
25.00 = • • 100.00
: ••4155 = • 145'.21r.r
•• d75= 6666•. 396.56••
•.••
• 0 80 = 214.17 •
.•.61.25•
= . • 1,137,s1"•:
••••2.25= • 1584N ".
••:61:40= • 066• 3185.9•••
Sit Down Room •••• • •
6 • J -.eight: 7' 6"
DESCRIPTION QNTY UNIT COST TOTAL
Carpenter - General Framer - per hour 2.00 HR @ 25.00 = 50.00
R&R Batt insulation - 4" - R11- unfaced batt 240.63 SF @ 0.55 = 132.35
R&R 1/2" drywall - hung, taped, floated, ready for paint 96.25 SF @ 0.75 = 72.19
R&R 5/8" drywall - hung, taped, floated, ready for paint 250.00 SF @ 0.80 = 200.00
R&R Tile floor covering 250.00 SF @ 4.25 = 1,062.50
R&R Baseboard - 5 1/4" 64.17 LF @ 2.25 = 144.38
Paint the walls and ceiling - two coats 731.25 SF @ 0.40 = 292.50
.. • . ••••
•
• • •
• • • •
• •
• • •
•• •
•
•
•
•
• •
Gym
671 NE 105 ST
Height: 7' 6"
10/18/2016 Page: 7
RM & Associates Consulting, Inc
&Associates CGC #1520941
14629 SW 104 street, #498
®®E Miami, FL -33186
(305) 785-5024 office
estimates@rmassoc.com
DESCRIPTION
QNTY UNIT COST TOTAL
Carpenter - General Framer - per hour
R&R Batt insulation - 4" - R11- unfaced batt
R&R 1/2" drywall - hung, taped, floated, ready for paint
R&R 5/8" drywall - hung, taped, floated, ready for paint
R&R Tile floor covering
R&R Baseboard - 5 1/4"
Paint the walls and ceiling - two coats
8.00 HR @ 25.00 = 200.00
213.95 SF @ 0.55 = 117.67
321.25 SF @ 0.75 = 240.94
451.56 SF @ 0.80 = 361.25
451.56 SF @ 4.25 = 1,919.13
85.67 LF @ 2.25 = 192.76
1,094.06 SF @ 0.40 = 437.62
Gym Bathroom Height: 7' 6"
DESCRIPTION
QNTY UNIT COST TOTAL
Carpenter - General Framer - per hour 2.00 HR @ 25.00 =
R&R Batt insulation - 4" - R11- unfaced batt 52.65 SF @ 0.55 =
R&R 1/2" drywall - hung, taped, floated, ready for paint 210.58 SF @ 0.75 =
R&R 5/8" drywall - hung, taped, floated, ready for paint 49.00 SF @ 0.80 = • •
•
R&R 1/2" Cement board 90.00 SF @ •
• • • • x.75 •
= • ••••
R&R Tile 90.00 SF@ 4.51=••••••
R&R Tile floor covering 49.00 SF @ • 4.25 = •
R&R Baseboard - 5 1/4" 28.08 LF @ •••••2 ••••. •25 = • •
Paint the walls and ceiling - two coats 259.58 SF @ Q.40 - • •
R&R Toilet 1.00 EA @..°421.00- '•'•• •
•
R&R Vanity 2.00 LF @ ••• 5.47 - •
50.00
28.96
157.94
39.20
247.50•
404.44).: •
21,., ••
61.18 •
10•x:• • •
12;;./x• • •
•
300.94• •
• • • • •
• • •
•• • •••• • •
• • •
•• •
Steam Room Height: 7' 6"
DESCRIPTION
QNTY UNIT COST TOTAL
R&R Batt insulation - 4" - R11- unfaced batt 47.19 SF @
R&R 1/2" Cement board 228.29 SF @
R&R Tile floor covering 39.54 SF @
R&R Tile 228.29 SF @
0.55 =-
2.75
2.75 -
4.25 =
4.51 -
25.96
627.80
168.05
1,029.59
Sauna
Height: 7' 6"
DESCRIPTION QNTY UNIT COST TOTAL
671 _NE_ 105_ST
10/18/2016 Page: 8
RM
& Associates
aseaessuntas
RM & Associates Consulting, Inc
CGC #1520941
14629 SW 104 street, #498
Miami, FL -33186
(305) 785-5024 office
estimates@rmassoc.com
CONTINUED - Sauna
DESCRIPTION
QNTY UNIT COST TOTAL
Carpenter - General Framer - per hour
R&R Batt insulation - 4" - R11- unfaced batt
R&R Cedar lining
R&R Tile floor covering
8.00 HR @
54.75 SF @
222.42 SF @
29.00 SF @
25.00 =
0.55 =
4.32 --
4.25
4.25 =
200.00
30.11
960.86
123.25
General
DESCRIPTION
QNTY UNIT COST• TOTAL
•
Electrical (Bid Item)
Plumbing (Bid Item)
Mechanical (Bid Item)
Windows - Aluminum (Bid [tem)
1.00 EA @
1.00 EA @
1.00 EA @
1.00 EA @
Exterior
DESCRIPTION
QNTY
12,5.00.00 - • 12,500'Yt?
9.7600b0= •• • • •9,600.00 •
1/1.9K1,00 = . • 12,900,00 .
3s,aoci00 = . • 38,000.00 •
•
• ••
• • • • •
•• •• ••••
•
• • •
• • • •
• • •
UNIT COST • • •: • .TOTS, •
• •
•
.•
•
•
R&R Stucco - natural gray - troweled
Exterior - seal or prime then paint
2,500.00 SF @
2,500.00 SF @
• • •
1.75 = 4,375.00
0.85 = 2,125.00
Plumbing Materials
DESCRIPTION
QNTY UNIT COST TOTAL
(Material Only) Toilet
(Material Only) Sink faucet - Bathroom
(Material Only) Sink - single - Bathroom
(Material Only) Shower faucet
(Material Only) Bathtub
(Material Only) Sink faucet - Kitchen
671 NE 105 ST
6.00 EA @
7.00 EA @
7.00 EA @
5.00 EA @
1.00 EA @
1.00 EA @
145.65 = 873.90
83.51 = 584.57
74.04 = 518.28
130.00 = 650.00
271.65 = 271.65
138.71 - 138.71
10/18/2016 Page:9
RM
& Associates
sesimammor
0000E1
RM & Associates Consulting, Inc
CGC #1520941
14629 SW 104 street, #498
Miami, FL -33186
(305) 785-5024 office
estimates@rmassoc.com
CONTINUED - Plumbing Materials
DESCRIPTION
QNTY
UNIT COST TOTAL
(Material Only) Kitchen Sink
(Material Only) Garbage disposer
1.00 EA @
1.00 EA @
198.04 = 198.04
129.00 = 129.00
Electrical Materials
DESCRIPTION
QNTY
UNIT COST TOTAL
(Material Only) Recessed light fixture
(Material Only) Exterior light fixture
(Material Only) Ceiling fan & light
140.00 EA @
25.00 EA @
1.00 EA @
35.52 =
75.01 = •
1l'7.50= •
4,972.80
• 1,875.25
Mechanical Materials
DESCRIPTION
(Material Only) Central air conditioning system - 4 ton - 16-21 SEER
(Material Only) Central air conditioning system - 1 ton - 14-15 SEER
(Material Only) Exhaust fan - Premium grade
• •
••••
• •
••••
•
• •
•
• ••
• • • . •
127'5.1.:
•
•
•
•
• •
QNTY U IT OST • • • • TOTAL •• •
••
3.00 EA @
1.00 EA@
5.00 EA@,
•5,28291 = • • J,5,848.73 •' •'
:1,712.88= 1,71218•••.
117.70= •„• 588.50
Grand Total Areas:
12,173.52 SF Walls
5,942.16 SF Floor
0.00 SF Long Wall
5,942.16 Floor Area
7,453.71 Exterior Wall Area
5,942.11 SF Ceiling
660.24 SY Flooring
0.00 SF Short Wall
6,012.92 Total Area
829.29 Exterior Perimeter of
Walls
0.00 Surface Area 0.00 Number of Squares
0.00 Total Ridge Length 0.00 Total Hip Length
671 NE 105 ST
18,115.63 SF Walls and Ceiling
1,520.50 LF Floor Perimeter
1,520.50 LF Ceil. Perimeter
12,236.10 Interior Wall Area
0.00 Total Perimeter Length
10/18/2016
Page: 10
RMRM & Associates Consulting, Inc
&Associates CGC #1520941
14629 SW 104 street, #498
®®gra Miami, FL -33186
(305) 785-5024 office
estimates@rmassoc.com
Summary
Line Item Total 185,747.85
Overhead @ 10.0% 15,725.80
Profit @ 5.0% 7,862.90
Replacement Cost Value
Net Claim
RM & Associates Consulting, Inc
671_NE_105_ST
$209,336.55
$209,336.55
• • •
•• • ••••
••••
•
••••
•••• •
• ••
• • •
•• •• ••••
•
• • •
• • •
•• . •ISl
• . .
•
•
•
•
•
10/18/2016 Page: 11
2nd Floor
11' 9"
19' 1"
18' 9"
1
1' 1"
co
'2 2'
2' 10"
32' 9"
$6 7p„
18' 11" ,7(/ 0 5 `�\
18'9"
Family Room
671 NE 105 ST
19' 5"
• ••• •• ••• • •••
• • • • • • • •
• • • •• • • • •
•• • • • • • • • • 0
• •• • • •• • • ••
•• • • • • •
••• • • • • ••• • •
• • • • • • • •
• • • •••• • •
• • • • • • • •
• • •
• •• •• • • • •• ••
••• • • • 000 • •
T
") 18'8"
21' 7"
& l Room
18' 9"
ih
19' 5"
10/18/2016 Page: 12
1st Floor
19'1"
—11'9 --I
19 1
Kbchen
14
10'4"
Fenndry
13'
4'10"{
r
A'
9'
tkabech asto
I—u'6
20'
It13e i-
1
11' 1'
T .{
2 14
16' 11' ,1I
1
\'1 1
••
•
•
•
24'5 •
671NE105ST
24' 11'
•
4,4
42 6
1B'1' I
30 6"
•I• • • • • • ••
• •
• •
• •• • • • ••
• ••• •• ••• • •••
• • • • • • • •
• • • •• • L • •
•• • • • • • • • • •
• •• • • •• • • ••
•• • • • • •
••• • • • • ••• • •
• • • • • • • •
• • • ••• • • •
• • • • • • • • • •
• •• •• • • • •• ••
••• • • • ••• • •
15' 9"
i
bedroom 3
15' 4"
1i
16'
10/18/2016 Page: 13
HOLD HARMLESS
PROPERTY LOCATED AT: / b /0 s s >' (?), Pn4, SAa,u i #c - 3 3 i 3
As ko 6 «1 />?o,c cA. o license contractor of subject property,
Permit number Bt - S - / 2 310 I request an early start permit as allowed under section 105.12
of the 2014 Florida Building Code for the scope of work delineated in the building permit application and
plan prior to the final approval and issuance of the permit, provided the work does not proceed past the first
required inspection.
I agree to hold Miami Shores Village, its agents and authorized personnel harmless and relieve them from
any responsibility or liability for any legal action or damage, cost or expense (including attorney's fee)
resulting from missed inspection of the above mention permit. I furthermore assume responsibility for the
correction, if required, of work performed under the above permit.
1(\..UJ'Aik(
Resod(/. / (Y) ° "
(Print Name)
(Prime Contractor -qualifier)
State of Florida
County of Dade:
RECEIVIg
OC 9 2016
• •
• • •
$ • • •
•• • •••• •
• • •
••••
•
• • •
•t•• • • • •
• •
•••• •
•••
• • • • •
••• •• •••9
• •
•
'
• •
•
• • •
•• • • •
• •
.• • •••• • •
• • •
•• •
The undersigned, being the first duly swom, deposes and says that he/she is the contractor for the above
property mentioned.
WSworn to and subscribed before me this f day of t' , 2c1V
Notary Public, State of Florida at Large
,tit.►�+. Marisol Quintana
TicsCA mmisston N FF172378
s ..
Expires: OCT 28, 2018
° BANDED THRU
.,oFft �STPLORIAANOTARxLLC