FW-17-1367 v FW.67, 7
Miami Shores Village Pennt FenlliNaiM ;
10050 N.E.2nd Avenue NEtNOtiC�l8 Sif�}Ee3 oil.�Irw on..
Miami Shores,FL 33138-0000
................
Permit 5#afus:=APPR{31it3
Phone: (305)795-2204
;'`
Expiration: 11/22017
Project Address Parcel Number Applicant
162 NE 109 Street 1121360090110
GAVIN AND MARCIA MACPHAIL
Miami Shores, FL 33161-7042 Block: Lot:
Owner Information Address Phone Cell
GAVIN AND MARCIA MACPHAIL 162 NE 109 Street
MIAMI SHORES FL 33161-7042
162 NE 109 Street
MIAMI SHORES FL 33161-7042
Contractor(s) Phone Cell Phone Valuation: $ 500.00
HOME OWNER
Total Sq Feet: 4
Approved: Available Inspections:
Comments: Inspection Type:
Date Approved:: Final
Date Denied: Foundation
Type of Construction:Other Additional Info:INSTALLATION OF FENCE GATE AL Review Planning
Classification:Residential Scanning:3 Review Planning
Review Building
Review Building
Fees Due Amount Pay Date Pay Type Amt Paid Amt Due
CCF $0.60 Invoice# FW-5-17-64063
DBPR Fee $2.00
DCA Fee $2.00 05/1912017 Credit Card $50.00 $64.60
Education Surcharge $0.20 05/26/2017 Credit Card $64.60 $0.00
Permit Fee-Wire&Wood $100.00
Scanning Fee $9.00
Technology Fee $0.80
Total: $114.60
In consideration of the issuance to me of this permit, I agree to perform the work covered hereunder in compliance with all ordinances and regulations
pertaining thereto and in strict conformity with the plans,drawings,statements or specifications submitted to the proper authorities of Miami Shores Village. In
accepting this permit I assume responsibility for all work done by either myself, my agent, servants, or employes. I understand that separate permits are
required for ELECTRICAL,PLECHANICAL,WINDOWS,DOORS,ROOFING and SWIMMING POOL work.
OWNERS AFFIDAVIT: I cerche foregoing information is accurate and that all work will be done in compliance with all applicable laws regulating
construction an Pir
thorize the above-named contractor to do the work stated.
May 26,2017
Auth rize / Applicant / Contractor / Agent Date
Build! t Copy
May 26,2017 1
t •
Miami Shores Village otttivn
r
Building Department
10050 N.E.2nd Avenue,Miami Shores,Florida 33138
bcn Tel:(305)795-2204 Fax:(305)756-8972
INSPECTION LINE PHONE NUMBER:(305)762-4949 S IN
FBC 20
BUILDING Master Permit No.4 \,,j I'-A
PERMIT APPLICATION Sub Permit No.
BUILDING ❑ ELECTRIC ❑ ROOFING ❑ REVISION ❑ EXTENSION ❑RENEWAL
❑PLUMBING ❑ MECHANICAL ❑PUBLIC WORKS ❑ CHANGE OF ❑ CANCELLATION ❑ SHOP
�+ j�. CONTRACTOR DRAWINGS
JOB ADDRESS: !�.L ISL ® � l +CET
City Miami Shores County Miami Dade Zip: 33 k 6 I
Folio/Parcel#• H- Q-56 W41-0110 Is the Building Historically Designated:Yes NO
Occupancy Type: Load: Construction Type: Flood Zone: BFE: FFE:
c
OWNER:Name(Fee Simple Titleholder)�A-Tv�u 1 Phone#:
Address: 16Z NE 109 2 f
City: 1�1,wi Sk State: F L Zip:
Tenant/Lessee Name: Phone#: -,'AXC5�42;.Z7GG'
Email: &YywI.
rznnn
CONTRACTOR:Company Name: w �. Phone#: -SCIS 131-72
1 6
Address: 6 2 �o
City: State: Zip:
3�1r,
Qualifier Name: Phone#:
State Certification or Registration#: Certificate of Competency#:
DESIGNER:Architect/Engineer: Phone#:
Address: City: State: Zip:
Value of Work for this Permit:$ 5()c>-00 Square/Linear Footage of Work: Lfe'7-
Type of Work: ❑ Addition ❑ Alteration New ❑ Repair/Replace((---- F-1 De
Description of Work: o triY�(,e � 'P� NA ti �olition
Specify color of color thru tile:
Submittal Fee$ Permit Fee$ I®O CJ® CCF$ CO/CC$
Scanning Fee$ Radon Fee$ DBPR$ Notary$
Technology Fee$ Training/Education Fee$ Double Fee$
Structural Reviews$ Bond$
TOTAL FEE NOW DUE$ C® Y- 6 0
(Revised02/24/2014)
Bonding Company's Name(if applicable) ,
Bonding Company's Address
City State Zip
Mortgage Lender's Name(if applicable)
Mortgage Lender's Address
City State Zip
Application is hereby made to obtain a permit to do the work and installations as indicated. I certify that no work or installation has
commenced prior to the issuance of a permit and that all work will be performed to meet the standards of all laws regulating
construction in this jurisdiction. I understand that a separate permit must be secured for ELECTRIC, PLUMBING, SIGNS, POOLS,
FURNACES,BOILERS,HEATERS,TANKS,AIR CONDITIONERS,ETC.....
OWNER'S AFFIDAVIT: I certify that all the foregoing information is accurate and that all work will be done in compliance with all
applicable laws regulating construction and zoning.
"WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY
RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND
TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING
YOUR NOTICE OF COMMENCEMENT."
Notice to Applicant: As a condition to the issuance of a building permit with an estimated value exceeding$2500,the applicant must
promise in good faith that a copy of the notice of commencement and construction lien law brochure will be delivered to the person
whose property-is srrbject-to-attochment. sa,a-certifled copy ofthe-recorded7rotice-of cammencemvrnt-►trust-b�po—'ts eft-th�o�tc
for the first inspection which occurs seve ( ) days after the building permit is issued. In the absence of such posted notice, the
inspection will not be appro nd a rein ection fee will be charged.
Signature Signature
0 AGT CONTRACTOR
The foregoing instr ent ackno edged before me this The foregoing instrument was acknowledged before me this
lC1 day of G 20 l�- ,by day of 20 by
�Zi C o� 1"1 c'CI�c,�1
vho Is personally know 0 who is personally known to
me or who has produced ��2 �u _S CD
-�I 8 Z -
as me or who has produced as
identification and who did take an oath. Florid q identification and who did take an oath.
NOTARY PUBLIC: I CA'A%� NOTARY PUBLIC:
Sign: Y - MAHARAI K.GONZALEZ Si n:
MY COMMISSION#GG 044602
Print: EXPIRES:November 12 020 P t:
N• <•
'%FOF gip' Bonded Tfw Notary Public Undenv6ters
Seal: l;
�
APPROVED BY r ' Plans Examiner 6�1,,"'p � Zoning
Structural Review Clerk
(Revised02/24/2014)
q !
Miami Shores Village
Building Department
10050 N.E.2nd Avenue
�toRID� Miami Shores, Florida 33138
Tel: (305)795.2204
Fax: (305)756.8972
OWNER BUILDER DISCLOSURE STATEMENT
NAME: 9AtPiU,1qDATE:
ADDRESS: Z. �3G \13, L a2)1 (0I
Do hereby petition the Village of Miami Shores to act as my own contractor pursuant to the laws of the State of Florida,F.5 489.103(7).And I have
read and understood the following disclosure statement,which entitles me to work as my own contractor;I further understand that I as the owner
must appear in person to complete all applications.
State Law requires construction to be done by a licensed contractor.You have applied for a permit under an exception to the law.The exemption
allows you,as the owner of your property,to act as your own contractor even though you do not have a license.You must supervise the
construction yourself.You may build or improve a one-family or two-family residence.You may also build or improve a commercial building at a
cost of$25,000.00 or less(The new form states 75,000).The building must be for your own use and occupancy.It may not be built for sale or
lease.If you sell or lease a building you have built yourself within one year after the construction is complete,the law will presume that you built
for sale or lease,which is a violation of this exemption.You may not hire an unlicensed person as a contractor.It is your responsibility to make
sure the people employed by you have licenses required by state law and by county or municipal licensing ordinances.Any person working on
your building who is not licensed must work under your supervision and must be employed by you,which means that you must deduct F.I.C.A and
with-holdings tax and provide workers'compensation for that employee,all as prescribed by law.Your construction must comply with all
applicable laws,ordinances,buildings codes and zoning regulations.
Please read and initial each paragraph.
1. 1 understand that state law requires construction to be done by a licensed contractor and have applied for an owner-builder permit under an
exemption from the law.The exemption specifies that I,as the owner of the property listed,may act as my own contractor with certain
restrictions even though I do not have a license.
Initial s 'IUI
1
2. 1 understand that building permits are not required to be signed by a property owner unless he or she is responsible for the construction and
is not hiring a licensed contractor to assume responsibility.
Initial
3. 1 understand that,as an owner builder,I am the responsible party of record on a permit.I understan that I may protect myself from potential
financial risk by hiring a licensed contractor and having the permit filed in his or her name instead of my own name.I also understand that the
contractor is required by law to be licensed in Florida and to list his or license numbers on permits and contracts.
Initial 1
4. 1 understand that I may build or improve a one family or two-family residence or a farm outbuilding.I may also build or improve a commercial
building if the costs do not exceed$75,000.The building or residence must be for my use or occupancy. It may not be built or substantially
improved for sale or lease.If a building or residence that I have built or substantially improved myself is sold or leased within 1 year after the
construction is complete,the law will presume that I built or"substantially improved it for sale or lease,which violates the exemption.
Initial
5. 1 understand that,as the owner-builder,I must provide direct,onsite supervision of the construction.
Initial X10/1
6. 1 understand that I may not hire an unlicensed person to act as my contractor or to supervise persons working on my building or residence.It
is my responsibility to ensure that the persons whom I employ have the license required by law and by county or municipal ordinance.
InitialL�
f
{ A
• 7. 1 understand that it is frequent practices of unlicensed persons to have the property owner obtain an owner-builder permit that erroneously
implies that the property owner is providing his or her own labor and materials. I,as an owner-builder,may be held liable and subjected to
serious financial risk for any injuries sustained by an unlicensed person or his or employees while working on my property.My homeowner's
insurance may not provide coverage for those injuries. I am willfully acting as an owner-builder and am aware of the limits of my insurance
coverage for injuries to workers on my property.
Initial
8. 1 understand that I may not delegate the responsibility for supervising work to be a licensed contractor who is not licenses to perform the
work being done.Any person working on my building who is not licensed must work under my direct supervision and must be employed by
me,which means that I must comply with laws requiring the withholding of federal income tax and social security contributions under the
Federal Insurance Contributions Act(FICA)and must provide workers compensation for the employee.I understand that my failure to follow
these may subject to serious financial risk.
Initial
9. 1 agree that,as the party legally and financially responsible for this proposed Construction activity,I will abide by all applicable laws and
requirement that govern owner-builders as well as employers.I also understand that the
Construction must comply with all applicable laws,ordinances,building codes, and zoning regulations.
Initial
10. 1 understand that I may obtain more information regarding my obligations as an employer from the Internal Revenue Service,the United States
Small Business Administration,and the Florida Department of Revenues.I also understand that I may contact the Florida Construction Industry
Licensing Board at 850.487.1395 or htto://www.mvfloridalicense.com/dbpr/pro/cilb/index.html
Initial
11. 1 am aware of,and consent to;an owner-builder building permit applied for in my name and understands that I am the party
legally and financially responsible for the proposed construction activity at the following address:
Initial r
12. 1 agree to notify Miami Shores Village immediately of any additions,deletions,or changes to any of the information that I have provided on
this disclosure.
Initial
Licensed contractors are regulated by laws designed to protect the public.If you contract with a person w o does not have a license,the
Constr4uction Industry Licensing Board and Department of Business and Professional Regulation may be unable to assist you with any financial
loss that you sustain as a result of contractor may be in civil court.It is also important for you to understand that,if an unlicensed contractor or
employee of an individual or firm is injured while working on your property,you may be held liable for damages.If you obtain an owner-builder
permit and wish to hire a licensed contractor,you will be responsible for verifying whether the contractor is properly licensed and the status of
the contractor's workers compensation coverage.
Before a building permit can be issued,this disclosure statement must be completed and signed by the property owner and returned to the local
permitting agency responsible for issuing the permit.A copy of the property owner's driver license,the notarized signature of the property
owner,or other type of verification acceptable to the local permitting agency is required when the permit is issued.
Was acknowledged before me this day of G 20
By C A CAV C. G n G�'Y 1 D G who was personally known to me or who has "
100.500
Produced they License r s 1 entification.
b 'm
E NOTARY `
N
vnas sc�i
JOHN MARRA & ASSOCIATES, INC.
Professional Land Surveyors & Mappers
777 N.W.72nd AVENUE SUITE 3025,MIAMI,FLORIDA 33126
TELEPHONE:(305)262-0400 1 FAX:(306)262-0401
WWW.IBARRALANDSURVEYORS.COM
MAP OF BOUNDARY SURVEY 162 NE 109th STREET, MIAMI, FL 33161
LIMIT OF PLAT LIUIT OF PLAT
1T ASPHALT (N.A'P.) (N.A.P.)
-PVMT.
10'GRASS MEDIAN NE 109th STREET
75'TOTAL RIGHT-OF-WAY
I r ASPHALT
PVMT.
101 PWY
F.I.P.1/2" F.I.P.112"
NO CAP NO CAP
CONC.b%wk75.00 .1 . .. " ? 125.05'
'
P.C.
F.I.P.1/2"
NO CAP
04
4'C.B.W.
co
co
13-3 5' _10'
C�
_L0.06'j
C.P.
Ifni 1E 21.15'
ONE STORY
10.02'
RES. #162 co
,2
.6.8 - C4
LOT-3
BLOCK-216
4.60'CL 0 9.
23.80"
ti
rn
gz
C3 L W4'C.L.F. 0
18.65, ul� 5
7
A.C. a
F1 cc Uj
0
A.R. z
LO
0.001,
< CC
C.S.
4 C.L.F.
7."
c
ENCROACHMENT ASPH. 4'C.L.F.
DRIVE
NOTES: b <
A.SOUTH SIDE OF THE c�
SUBJECT PROPERTY, <
ASPHALT RETURN IS
ENCROACHING INTO THE 0
15 FOOT ALLEY(N.A.P.)
RIGHT OF WAY. 04 01
' 4'C.L.F.
6.12 .(,Ib C)
CL .16' 0 1 1 1 0.29'CL
=I=--
F.I.P.1/2" f 75.001 F.I.P.11r
NO CAP b (
ASPH.AikETURN 10'ASPHALT NO CAP
Ln )
c� 15'ALLEY(N.A.P.) PVMT. W-1 U.P.
S LEGAL DESCRIPTION: DRAWN BY. KEVIN
0 LOT 3,BLOCK 216,DUNNING'S MIAMI SHORES EXTENSION No.5,ACCORDING
TO THE MAP OR PLAT THEREOF AS RECORDED IN PLAT BOOK 48,PAGE(s)21,
C4 OF THE PUBLIC RECORDS OF MIAMI-DADE COUNTY,FLORIDA. SCALE. 1 =20
NO.6770 0
STATE OF CERTWICATION.*
GAVIN R.MACPHAIL AND MARCIA PATRICIA MACPHAIL FIELD DATE: 07/05/2013
AVILA RODRIGUEZ HERNANDEZ MENA&FERRI LLP
WW OLD REPUBLIC NATIONAL TITLE INSURANCE COMAPNY JOB NO: 13-002455-1
PRIMARY RESIDENTIAL MORTGAGE,INC.,ITS SUCCESSORS AND OR
..B.#7806 SEAL ASSIGNS,AS THEIR INTEREST MAY APPEAR SHEET. 2 OF
3NE=mmm-. 1
Hinge Tension Adjustment
Allen
4NOTE. ranch
■ � Tension
HINGE TENSION IS PRE-SET AT THEAdjustment
FACTORY AND USUALLY DOES NOT P'"
REQUIRE ADJUSTMENT. ��
If you wish to change tension setting/gate
swing speed,or completely disable the self- p
closing feature,please see the following:
a. Place included Allen wrench into head of
tension adjustment pin in hinge.The head is
at the end closest to the+or-symbol on the
hinge barrel(Fig.6).
b. While holding the tension adjustment pin with
Allen wrench,press the opposite end of the
•••• pin into the hinge barrel.This will cause the Press,I P
•••••• •
*99 • • head of the tension adjustment pin to extend
•. ••• • : 080 beyond the hinge barrel(Fig.6.)
•••••• • •• ••:•••NOTE: Pres own
• • • •••••• DO NOT remove the Allen wrench or release
•••••.
000600 0
• • • • •••• the tension on the tension adjustment pin at p
••••• • •••• any time during the adjustment. O
••••• •• • ••••••
• • • • • c. Following the indicators on the+or- �
•;•••• "•' " �' symbol on the hinge barrel,turn the tension
•
• • ;';•'; adjustment pin toward+to tighten,or toward O
•••••• • • • • -to loosen.DO NOT adjust by more than
• • •• V4 turn,unless you want to disable the self- O
• • ••• • •• closing feature (Fig.6). #
O
- Self-closing feature can be disabled by
loosening the tension adjustment pin one full
turn.
Do not over-tighten or over-loosen the tension
adjustment pin,as this may damage the
tension spring.
d. When you have set the desired tension,press
down on the head of the tension adjustment
pin to lock it back into the hinge barrel.Tabs
on pin head will fit into notches in hinge barrel
when pin is in fully locked position(Fig.7).
5 Where applicable,install gate latch or drop rod
according to instructions provided with those
■ products.
4
� ♦ e
Determine Gate Opening:
Refer back to"How to Measure" Determine
■ location and gate
Gate opening is determined by width of gate plus opening before
clearance for hinge,latch,and drop rod patch installing fence.
and drop rod sold separately);refer to latch and
drop rod installation instructions for specific space
requirements Fig.1).
2■ Mount Hinges on Gates:
For best results,work on a clean,flat,stable Tab
surface when mounting hinges to gates. ° "V
a. Place hinges at desired position on each •6••
gate.For equal spacing,we recommend the m • • '0000' •••••.
bottom hinge be placed 6°from the bottom Gate •"• ' •' :'; '
gate upright,and the top hinge be placed 6" ....,
from the top upright.Tabs on hinges must
rest firmly against gate upright or U-frame :0000:
(Fig.2) • a • 0.0.0
• • •• 00000
b. Mark pilot holes through screw holes on hinge ® • e 0: • 6• 00%.6
• 6 •
then pre-drill using 3/32 •°bit(Fig.3). . 0000 96,060
m •
c. Secure hinges to each gate with included 1" • • •o • •
screws(Fig.3). ® • m • 0 000000
• 00000
0 •
•0609•
3 Mount Gate to Post:
■ NOTE.
• Gate posts must be plumb prior to gate
installation.Posts must also have set for
at least 24 hours in concrete prior to any
gate installation.
Gate Penel
• Cut two(2)2°spacer blocks to help
support each gate during installation. Hill
v
a. Set gate on spacer blocks and hold it up to
the gate post.Tabs on hinges must rest firmly 2°Spacer Blocks
against gate post(Fig.4)
b. Mark pilot holes on the post,through the
screw holes in the hinges.
c. Remove gate and pre-drill%2°pilot holes. a 0e, ®4w■a
d. Re-position gate on post and secure hinges t°straws
with 1"included screws(Fig.5).
e. Repeat for additional gate(s).
3
9
r �
BOM-34109951
Barre
-1 t e
...... ..... . .
• ••�•�• Aluminum Fence Gate
•••;•• •• '• °••°°° INSTALLATION INSTRUCTIONS
9°° ° ...... En lash.. ...................... .................................................1
°.°..° . . •Frangais..............................................................................6
° •Espaflol.............................................................................11
Read all instructions prior to installing product.
Refer to manufacturers safety instructions when operating any tools.
To register your product, please visit: barretteoutdoorliving.com
A WARNING:
•Improper installation of this product can result in personal injury.Always wear safety goggles when
cutting,drilling and assembling the product.
•Incorrect installation may cause harm to the product or individual.
NOTICE:
•DO NOT attempt to assemble the kit if parts are missing or damaged.
•DO NOT return the product to the store.For assistance or replacement parts call:1-800-336-2383.
BEFORE YOU BEGIN: TOOLS NEEDED:
Check your local zoning laws. Boerboel®Hardware
• Local zoning laws and Home Owners Safety Glasses
Associations may regulate the location,style Level
and height of your fence and gate or even ••••
require a permit signoff beforehand. Tape Measure •
� •• 0000 0000••
• Check local codes for frost line depth and Drill • • • ••
regulations. 3/32"Drill Bit . . . •
Pencil :' 00 ' ••••••
• Additional products and assembly may be •• • • •
required to meet wind code requirements. 2"Spacer Blocks(2) •••• •
• • • •
Notice of acceptance(NOA)can be found at • • ••••��
www.miamidade.gov/building/pc-search_app.asp *see 0 •••s @
•0•
0 • •• 0000•
Contact your local utilities companies. 00• � � • �
•• •• 0000 0000••
• You must have the utility companies clearly •
0000.• • •
mark your property for electrical,gas or • • 0 •
water lines to avoid puncturing any unseen 0 • • • Soso**
underground utilities. • • ;•••••000 •
• •
• • 0000•
00
INSTALLATION
INSTALLATION TIPS:
J • When installing gate hardware onto gate,it needs to be on level ground
• Review enclosed Boerboel®butterfly hinge instructions before installation
• For measuring,note that gates 6'or larger come with 2"Ll-frame construction
HOW TO MEASURE:
When measuring for your drive gate,make sure to leave enough space for all gate hardware,
including hinges,gate latch and drop rod.When using Boerboel®hardware,leave 1"clearance
for all hinges and 1"clearance for a drop rod.Refer to specific hardware instructions for space
requirements.
Walk Gate Drive Gate
e
P
2
/a
d
P
J
1�
J
. . .
bN
...... ..0 ......
.... . .....
L
A