RF-16-290 INSPECTION RECORD POST ON SITE
No Es Permit NO. RF-2-16-290
Miami Shores Village
10050 N.E.2nd Avenue
Miami Shores,FL 33138-0000
Phone: (305)795-2204 Fax: (305)756-8972
FLORIDA- issue Date: 5/12120116 Expires: 11108/2016
INSPECTION REQUESTS: (305)762-4949
REQUESTS ARE ACCEPTED DURING 8:30AM-3:30PM FOR THE FOLLOWING BUSINESS DAY.
Roof Parcel #1132050270560
Owner's Name:GUY&SELIN KURLANDSKI Owner's Phone:
Job Address: 9301 N BAYSHORE Drove Total Square Feet: 1100
Miami Shored Total Job Valuation: $ 6,900.00
Bond Number:
WORK IS ALLOWED MONDAY THROUGH SATURDAY,
Contractor(s) Phone Primary Contractor 7:30AM-6:OOPM.NO WORK IS ALLOWED ON
SUNDAY OR HOLIDAYS.
TOP SEAL SERVICES CORP (305)754-7844 Yes
BUILDING INSPECTIONS ARE DONE MONDAY
THROUGH THURSDAY. ROOFING INSPECTIONS ARE
DONE MONDAY THROUGH FRIDAY. NO BUILDING
INSPECTIONS DONE ON FRIDAY.
THIS kil
, 'IBS ON
JOB AT T IM,E OF
3 all
COLOR THROUGH CONCRETE TILE OR SOLID CLAY TILE REQUIRED.
NO INSPECTION WILL BE MADE UNLESS THE PERMIT CARD IS DISPLAYED AND HAS BEEN APPROVED. PLANS ARE READLY AVAILABLE. ITIS
THE PERMIT APPLICANT'S RESPONSIBILITY TO ENSURE THAT WORK IS ACCESSIBLE AND EXPOSED FOR INSPECTION PURPOSES. NEITHER
THE BUILDING OFFICIAL NOR THE CITY SHALL BE LIABLE FOR EXPENSE ENTAILED IN THE REMOVAL OR REPLACEMENT OF ANY MATERIAL
REQUIRED TO ALLOW INSPECTION.
WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF
COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS
TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDED
AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU
INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN
ATTORNEY BEFORE COMMENCING WORK OR RECORDING YOUR NOTICE OF
COMMENCEMENT.
INSPECTION RECORD
STRUCTURAL • PLUMBING
INSPECTION IDATE INSP INSPECTION DATE INSP INSPECTION DATE INSP
Foundation Zoning Final
Stemwall ZONING COMMENTS Rough
Slab Water Service
Columns 1 st Lift 2"d Rough
Columns 2nd LiftTop Out
Tie Beam Fire Sprinklers
Truss/Rafters . .e Septic Tank
Roof Sheathing Sewer Hook-up
Bucks Roof Drains
Windows/Doors ELECTRICAL Gas
Interior Framing INSPECTION DATE INSP LP Tank
Insulation Tem ora Pole Well
CeilingGrid, 30 Da Temporary Lawn Sprinklers
Drywall Pool Bondin Main Drain
Firewall Pool Deck Bonding Pool Piping
Wire Lath Pool Wet Niche Backflow Prevento
Pool Steel Underground Interceptor
Pool Deck Footer Ground Catch Basins
Final Pool Slab Condensate Drains
Final Fence Wall Rough HRS Final
Screen Enclosure Ceiling Rough
Driveway Rough PLUMBING COMMENTS
Driveway Base Telephone Rough
Tin Cap- Telephone Final
Roof in Progress D TV Rough
Mop in Progress TV Final
Final Roof Cable Rough
Shutters Attachment Cable Final
Final Shutters Intercom Rough
Rails and Guardrails Intercom Final MECHANICAL
ADA com liance Alarm Rou h INSPECTION DATE INSP
FINAL Alarm Final Underground Pipe
DOCUMENTS Fire Alarm Rough
Soil BearingCert Fire Alarm Final Rou h
Soil Treatment Cert Service Work With
Floor Elevation SurveyVentilation Rough
Reinf Unit Mas Cert ELECTRICAL COMMENTS Hood Rough
Insulation Certificate Pressure Test
Spot SurveyFinal Hood
Final SurveyFinal Ventilation
Truss Certification Final Pool Heater
STRUCTURAL COMMENTS Final Vacuum
MECHANICAL COMMENTS
INSPECTION DATE INSP
Final Sprinkler
Final Alarm