RC-14-1686 �SAIMIFs Lj Miami Shores Village
evil Building Department
\ 10050 N.E.2nd Avenue
Z ..oy Miami Shores, Florida 33138
RTel: (305) 795.2204
Fax: (305) 756.8972
CERTIFICATE OF OCCUPANCYICOMPLETION
CHECK LIST
Building permit card.
Surveys(2 copies) Final as built- Required Items: Elevations of buildings showing all intended
setbacks from property lines and other existing structures. Ingress+ Egress, required parking
spaces, Wheel stops, stripping, and all paving to exterior.
Certificate of Elevation—(Sealed by surveyor). Expiration date required on the form.
Certificate of Insulation.
Certificate of Soil Treatment(Final treatment-original)\
CHAPTER 2913-5 TERMITE PROTECTION: "This Building has received a complete treatment
for the prevention of subterranean termites.Treatment is in accordance with the rules and
lawn as established by the Florida Department of Agriculture and Consumer Services."
Health Department Approval Letter(On septic or private water).
Note: If the house is on septic tank, approval letter is required from Health Dpt.
Soil Compaction Letter(Density report is required)
Final certification letter from the Engineer/Architect(on masonry, trusses, special structure, etc)
Backflow preventor certificate (Required on commercial projects only)
PLEASE NOTE THAT THE SAME ITEMS ARE REQUIRED FOR TEMPORARY CO
• Emergency CO (Without 24 Hrs Processing)Additional fee is$80.00.
• Temporary CO(Up to 90 days max) $75.00.
• Residential CO fee is$150.00
• Commercial CO is $200.00
REV(2/18/2010)
11 PEC-TION RECORD POST ON SITE
Permit NO. RC-8-14-1686
`Sg0RFs��<< Miami Shores Village Permit Type:Residential Construction
10050 N.E.2nd Avenue
m a.xm
Miami Shores,FL 33138-0000 .g Work Classification:Alteration
'2 -roe 0 Phone: (305)795-2204 Fax: (305)756-8972 Issue Date: 9/18/2015 Expires: 03/16/2016
��ORIDP'
INSPECTION REQUESTS: (305)762-4949 or Log on at https://bidg.miamishoresvillage.com/cap
REQUESTS ARE ACCEPTED DURING 8:30AM-3:30PM FOR THE FOLLOWING BUSINESS DAY.
Requests must be received by 3 pm for following day inspections.
Residential Construction Parcel #:1121360020060
Owner's Name:CRISTINA CRUZ ESCALONA Owner's Phone:
Job Address: 10616 NW 2 Avenue Total Square Feet: 00
Miami Shores. FL 33150- Total Job Valuation: $ 80,000.00
Bond Number:
WORK IS ALLOWED MONDAY THROUGH SATURDAY,
Contractor(s) Phone Primary Contractor 7:30AM-6:OOPM.NO WORK IS ALLOWED ONSUNDAY OR HOLIDAYS.
APOLO BUILDERS INC (954)445-5046 Yes
BUILDING INSPECTIONS ARE DONE MONDAY
THROUGH THURSDAY. ROOFING INSPECTIONS ARE
DONE MONDAY THROUGH FRIDAY. NO BUILDING
INSPECTIONS DONE ON FRIDAY.
t,.i w�.�u- �- 4 Cis 4A, cl p�',
NO INSPECTION WILL BE MADE UNLESS THE PERMIT CARD IS DISPLAYED AND HAS BEEN APPROVED. PLANS ARE READLY AVAILABLE. IT IS
THE PERMIT APPLICANT'S RESPONSIBILITY TO ENSURE THAT WORK IS ACCESSIBLE AND EXPOSED FOR INSPECTION PURPOSES. NEITHER
THE BUILDING OFFICIAL NOR THE CITY SHALL BE LIABLE FOR EXPENSE ENTAILED IN THE REMOVAL OR REPLACEMENT OF ANY MATERIAL
REQUIRED TO ALLOW INSPECTION.
WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF
COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS
TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDED
AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU
INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN
ATTORNEY BEFORE COMMENCING WORK OR RECORDING YOUR NOTICE OF
COMMENCEMENT.
•. r�,�• .r"•,.i': � `�•„` .T'4_ ".,T•� r�. .�+�•-. '•js'.�?Tt. c :i.°`- •'kms,,, 4„�y*, ^ y` ••!iF' „i� +•
.l• 'r� ;x � ,Y a'�4�. ;T•� Y. Si';.'"t IAL'•`- �' � '�{��,, �,t,, � h -i7';•J7•� '� �. `4�y W�'!1'' T".�' J' a 3�1/4;►fi•,�: •1'�
k 1 `� - r x}* r+iy . ��� r �� •, it�i�` v.i a i i J'�? � [i Ill' A
t ty�T
�44Y b:+t:� � r�.<?:i •�• ,f`���`�j}�� Yj S't;•' .��f�t�l� � 1• :• 1R` cly 111a�:k . r1Yfy,tr ��,. �t{•��j��� �� �Y12i�•, � ) ht.;� C• ' '�
,Y.�^`7 •¢: � � 1 � �'� '�•L•r:'r{'i�f� t { ,� � Y i'_•• t�' f' M� a �'�'� +`-1:'; T dL L�� j �y- S'4t�
� ?,• 2 4fF.�.sb� 1 7• !��(� •��.-L�+f :r j' " t '�' k lX'1'++.-'r��1�1:•. \ � r�s}"fid!' • 1 � Ni't..�.'1�• 11�� ;ei" ••.
tpp3'.�♦ , i•� .�r,�ir�?, ,}��.+ 7p't..{.)� �` •��� h��Ay a •�'ftir:}3•,•�aY�a� ���3 l�T 47 �� ;••' -„y 3 ��. 'M�ggyr J
L[ �' F+1t ..G,r �`.S•i• TX' 3�`'a`( is -a'Y. ryr•y! '• •w wI _'E'�`'•� ' '-`, •:
-���`�R7a� tai � La... •.>—'• •• Gu.+,, .�:._. � t .r.. -kt
y. ct � �t`f!ig +z,;�y��SiFF'�"3 'R"f'."'�--1� .,Y� ,t -.r• i• �'�V-�"',,��;�•t r -� -�t•. "`•j' "'�!''• �j � �, ,r,�
} ILA • • - - • • • • • • • • • • • • • • • • • • r• L �ti
5`�;,•�S'rA'si• a e3� �• .
•
r
see
t
n
�. 1• • ` �;• -ter;
1'fi�`-�, � .•� ay �}`.4 h"•fi J ��w��,�•'• Tt�"' � •w �i'' T+ _.� R ••�'.-�f"���_ - .� a-�;.� F itC ..
y -•>.r +. "sy ��,� jay a _ �-.. _ ��`' ,��• � ,. }'•'3.
4� �y I� q 1•'ki•t+.F yLgy,. � �f� �''.r. ��'1 t*' i s• - �ycyM{ 'h, 2� � L •! a
< }+� �• x0. r*?' .�� ��. .L:Y'1 ..t+ hti�.f',- t ' t '[�G'JP'., .tf: �' �.,' .` a llTal `' t1'i "�t -• '! a ..• >- �'fG,,,�' �.�.
r,r��j. •�1. �"�'���� �.,�j.^' - �� •t r 1/u�t`t', dF� 4",'.•3' " ,F'• :1�' �:��...1_�`+� J v.'S•�l �. Y�� �;'}��y+"V. �•'�L - Yt?,'F,f� ' f�,1�.� -
I1�ePECTION RECORD POST ON SITE
—"'--
Permit NO. RC-8-14-1686
yHoRes L
+ Miami Shores Village s Permit Type:Residential Construction
10050 N.E.2nd Avenue '`� r � `
-�- work Class
Miami Shores,FL 33138-0000
A#teration
-*E-3 '0� Phone: (305)795-2204 Fax: (305)756-8972 Issue Date: 9/18/2015
�ORtDQ' Expires: 03/16/2016
INSPECTION REQUESTS: (305)762-4949 or Log on at https://bldg.miamishoresviIlage.com/cap
REQUESTS ARE ACCEPTED DURING 8:30AM-3:30PM FOR THE FOLLOWING BUSINESS DAY.
Requests must be received by 3 pm for following day inspections.
Residential Construction Parcel #:1121360020060
Owner's Name:CRISTINA CRUZ ESCALONA Owner's Phone:
Job Address: 10616 NW 2 Avenue Total Square Feet: 00
Miami Shores FL 33150-
Total Job Valuation: $ 80,000.00
Bond Number:
WORK IS ALLOWED MONDAY THROUGH SATURDAY,
7:30AM-6:OOPM.NO WORK IS ALLOWED ON
Contractor(s) Phone Primary Contractor SUNDAY OR HOLIDAYS.
APOLO BUILDERS INC (954)445-5046 Yes
BUILDING INSPECTIONS ARE DONE MONDAY
THROUGH THURSDAY. ROOFING INSPECTIONS ARE
DONE MONDAY THROUGH FRIDAY. NO BUILDING
INSPECTIONS DONE ON FRIDAY.
i
d�jqp---
NO INSPECTION WILL BE MADE UNLESS THE PERMIT CARD IS DISPLAYED AND HAS BEEN APPROVED. PLANS ARE READLY AVAILABLE. IT IS
THE PERMIT APPLICANT'S RESPONSIBILITY TO ENSURE THAT WORK IS ACCESSIBLE AND EXPOSED FOR INSPECTION PURPOSES. NEITHER
THE BUILDING OFFICIAL NOR THE CITY SHALL BE LIABLE FOR EXPENSE ENTAILED IN THE REMOVAL OR REPLACEMENT OF ANY MATERIAL
REQUIRED TO ALLOW INSPECTION.
WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF
COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS
TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDED
AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU
INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN
ATTORNEY BEFORE COMMENCING WORK OR RECORDING YOUR NOTICE OF
COMMENCEMENT.
INSPECTION RECORDSTRUCTURAL
i
1ZONING
INSPECTION DATE INSP INSPECTION DATE INSP INSPECTION DATE INSP
Foundation
Zoning Final
Stemwall ZONING COMMENTS Rough
Slab i
Water Service ,
Columns(1st Lift) 2"d Rough
Columns(2nd Lift) Top Out
Tie Beam
Truss/Rafters
Fire Sprinklers
Roof Sheathing Septic Tank
Bucks
Sewer Hook-up
Windows/Doors Roof Drains
Gas
Interior Framing r ELECTRICAL INSPECTION DATE INSP LP Tank
Insulation / 1 Temporary Pole Well {
Ceiling Grid 30 Day Temporary Lawn Sprinklers
Drywall Pool Bonding Main Drain
Firewall Pool Deck Bonding Pool Piping
Wire Lath p g
Pool Wet Niche Backflow Preventor-
Pool Steel Underground Interceptor
Pool Deck Footer Ground Catch Basins
Final Pool Slab Condensate Drains
Final Fence Wall.Rough HRS Final
Screen Enclosure Ceiling R h _
Driveway Roug lz • PLUMBING COMMENTS
Driveway Base Telephone Rough
Tin Cap TelephonON
Roof in Progress TV RoughMop in Progress N FinalFinal Roof Cable Rou
Shutters Attachment Cable Final.
Final Shutters Intercom Rough
Rails and Guardrails Intercom Final
ADA compliance Alarm Rough INSPECTION. MEC
HANIDATE INSP
Alarm Final Underground Pipe
DOCUMENT Fire Alarm Rough
Soil Bearing Cert' Fre Alarm Final Rough V 1
Soil Treatment Cert Service Work With
Floor Elevation Survey Ventilation Rough
Reinf Unit Mas Cert ELECTRICALCOMMENTS Hood Rough
Insulation Certificate
Spot Survey
Pressure Test I
Final Survey Final Hood
Truss Certification
Final Ventilation
Final Pool Heater
STRUCTURAL COMMENTS Final Vacuum
/
INSPECTION DATE INSP MECHANICAL COMMENTS
Final Sprinkler
Final Alarm y
Oct.08/RV 8/31/09
INSPECTION RE
CORD
INSPECTION STRUCTU.AL
DATEZONING
INSPPLUMBING
INSPECTION DATE INSP
Foundation INSPECTION DATE INSP
Zoning Final
Stemwall
Slab ZONING COMMENTS Rough _
Columns(1st Lift) Water Service
s
Columns(2nd Lift) 2nd Rough
Tie Beam Top Out
' Truss/Rafters Fire Sprinklers
Roof Sheathing Septic Tank
Bucks Sewer Hook-up -
M Windows/Doors Roof Drains
ELECTRICAL
Interior Framing I A i Gas
INSPECTION DATE INSP LP Tank
Insulation / ! Temporary Pole
Ceiling Grid 30 Day Temporary Well
Drywall Lawn Sprinklers
Pool Bonding
Firewall Pool Deck Bonding Main Drain
Wire Lath Pool Piping
Pool Wet Niche Backflow Preventor
. Pool Steel Underground
Pool Deck Interceptor
Footer Ground Catch Basins
Final Pool Slab
Final Fence Condensate•Drains
Wall Rough F
Screen Enclosure Ceiling R h HRS inal _
Driveway Roug
Driveway BaseTelephone Rough r� PLUMBING COMMENTS
Tin Cap Telephone F1
Roof in Progress TV Rough
Mop in Progress TV Final
Final Roof Cable Roug
Shutters Attachment Cable Final
Final Shutters Intercom Rough
Rails and Guardrails Intercom Final
ADA compliance MECHANICAL
Alarm Rough
'
Alarm Final INSPECTION DATE INSP
M
DOCUMENTS Fire Alarm Rough Underground Pipe
Soil Bearing Cert Fire Alarm Final
" Soil Treatment Cert Rough
Service Work With
Floor Elevation Survey
Reinf Unit Mas Cert Ventilation Rough
Insulation Certificate ELECTRICAL COMMENTS Hood Rough
Spot Survey Pressure Test
Final Survey Final Hood
Truss Certification Final Ventilation
STRUCTURAL COMMENTS Final Pool Heater
Final Vacuum
INSPECTION MECHANICAL COM MENTS
DATE INSP -
Final Sprinkler
Final Alarm
V
Oct.08/RV 8/31/09