RF-17-591 INSPECTION RECORD POST ON SITE
,SRES Permit NO. RF-3-17-591
Miami Shores Village
10050 N.E.2nd Avenue
Permit Type:Roof
Miami Shores,FL 33138-0000
%mooOPhone: (305)795-2204 Fax: (305)756-8972 Work Ctassirication:Tile
�� RlDp`
Issue Date: 3/7/2017 Expires: 09/03/2017
INSPECTION REQUESTS: (305)7624949
REQUESTS ARE ACCEPTED DURING 8:30AM-3:30PM FOR THE FOLLOWING BUSINESS DAY.
Roof Parcel #:1131010330900
} Owner's Name:TYRONE HARRIS G i3 ` ;,, ';�� + �� Owner's Phone:
Job Address: 102 W 93 Street -t- : tt. U Total Square Feet: 4000
Bond Number: 3329 ' ' � � 1. _I }� `� Total Job Valuation: $ 20,000.00
K WORK IS ALLOWED MONDAY THROUGH SATURDAY,
Contractor(s) Phone ' Primary Contractor 7:30AM-6:00PM.NO WORK IS ALLOWED ON
ELKIS CONSTRUCTION INC (305)479-0261 Yes SUNDAY OR HOLIDAYS.
BUILDING INSPECTIONS ARE DONE MONDAY
THROUGH THURSDAY. ROOFING INSPECTIONS ARE
DONE MONDAY THROUGH FRIDAY. NO BUILDING
INSPECTIONS DONE ON FRIDAY.
� � �a�✓St. f d�c- �j��.✓ �emare , � .�.ee.�.r
7--;�;
w a t er•-cY-
COLOR THROUGH CONCRETE TILE OR SOLID CLA ILE REQUIRED"
NO INSPECTION WILL BE MADE UNLESS THE PERMIT CARD IS DISPLAYED AND HAS BEEN APPROVED. PLANS ARE READLY AVAILABLE.
THE PERMIT APPLICANT'S RESPONSIBILITY TO ENSURE THAT WORK IS ACCESSIBLE AND EXPOSED FOR INSPECTION PURPOSES. NEITH E:R
THE BUILDING OFFICIAL NOR THE CITY SHALL BE LIABLE FOR EXPENSE ENTAILED IN THE REMOVAL OR REPLACEMENT OF ANY MATER19
REQUIRED TO ALLOW INSPECTION.
WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF
COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS
TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDED
AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU
INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN
ATTORNEY BEFORE COMMENCING WORK OR RECORDING YOUR NOTICE OF
COMMENCEMENT.
II
INSPECTION RECORD
STRUCTURAL PLUMBING
INSPECTION DATE INSP INSPECTION DATE INSP INSPECTION DATE INSP
Foundation Zoning Final
Stemwall ZONING COMMENTS Rough
Slab Water Service
Columns(1st Lift) 2nd Rough
Columns(2nd Lift) Top Out
Tie Beam Fire Sprinklers
Truss/Rafters Septic Tank
Roof Sheathing Sewer Hook-up
Bucks Roof Drains
Windows/DoorsELECTRICAL Gas
Interior Framing INSPECTION DATE INSP LP Tank
Insulation Temporary Pole Well
Ceiling Grid 30 Day Temporary Lawn Sprinklers
Drywall Pool Bonding Main Drain
Firewall Pool Deck Bonding Pool Piping
Wire Lath Pool Wet Niche Backflow Preventor
Pool Steel Underground Interceptor
Pool Deck Footer Ground Catch Basins
Final Pool Slab Condensate Drains
Final Fence Wall Rough HRS Final
Screen Enclosure Ceiling Rough
Driveway Rough PLUMBING COMMENTS
)Driveway Base Telephone Rough
Tin Cap 20 Telephone Final
Rqof in Progress TV Rough
VfAop'in Progress TV Final
Final Roof Cable Rough
Shutters AttEchment Cable Final
Final Shut: Intercom Rough
Rails and 74 rdrails Intercom Final MECHANICAL
ADA corT)lip-- nce Alarm Rough INSPECTION DATE INSP
Alarm Final Underground Pipe
DOCUMENTS Fire Alarm Rough
Soil Bezrn Curt Fire Alarm Final Rough
Soil Treatment Cert Service Work With
Floor E ovation Survey FINAL Ventilation Rough
Reinf L nit Mas Cert ELECTRICAL COMMENTS Hood Rough
Insula; in Certificate Pressure Test
Spot"�— ey Final Hood
Fini S.., ey Final Ventilation
Truss Ce;;tification Final Pool Heater
STRUCTURAL COMMENTS Final Vacuum
MECHANICAL COMMENTS
INSPECTION DATE INSP
Final Sprinkler
Final Alarm
�L
v�