Loading...
REV-16-431 Miami Shores Village __ �8 ,�� ,�P� Building Department72. 2015 GJ 10050 N.E.2nd Avenue, Miami Shores, Florida 33138V: Tel: 305)795-2204 Fax:(305)756-8972 I_ v INSPECTION LINE PH NI 305)762-4949 V� 11:�' � ^ FBC 20'N�) %,jj BUILDING L. Master Permit No. Fi C 2 1 -5 PERMIT APPLICATION Sub Permit No.-12r4- (c- (43) ❑BUILDING ❑ ELECTRIC ❑ ROOFING ❑ REVISION ❑ EXTENSION [—]RENEWAL ❑PLUMBING ❑ MECHANICAL [:]PUBLICWORKS ❑ CHANGE OF ❑ CANCELLATION ❑ SHOP ACONTRACTOR DRAWINGS JOB ADDRESS: / 3 Ne 4 � City: Miami Shores County: Miami Dade Zip: Folio/Parcel#: 11324 S" eon/' L)4 za Is the Building Historically Designated:Yes NO Occupancy Type: Load: Construction Type: Flood Zone: BFE:-1 FFE: q OWNER: Name(Fee Simple Titleholder): r13/4/+�D J/c.l.Jvi/�� — Phone#. t � � 23(o � 1 Address: /��� �' '4� City:_A( State: �G Zip: 3 Tenant/Lessee Name: Phone#: Email: 31V CONTRACTOR:Company Name:_lam SJ d� Ji/���L�� 6–W640 Ph one#:20 S IMP Address: 2bg&Y 2�� .30 7-& 424! WA City: Al'r t.,&zp- State: 76 Zip: Qualifier Name: 6�1g.f' �f UEJ 4 9P 4*4,01 Phone#: State Certification or Registration#: C G e Certificate of Competency#: DESIGNER:Architect/Engineer: Phone#: Address: City: State: Zip: Value of Work for this Permit:$ Square/Linear Footage of Work: I Type of Work: ❑ Addition ❑ Alteration ❑ New Repair/Replace ❑ Demolition I Description of Wolk: ti SSS 1 t� Ail. �. .w �� ��1 rraze7:77- I o- S3` AN; '.cl t� �- +. .,...t 4.,•'_ e._ r��..,w Y, -f h} }. �i �' i E9 + 1T1R1;,J fit V'`� lldit��„ i1 l Specify` color of c " or thru tile: Submittal Fee$ Permit Fee$ CCF$ CO/CC$ Y Scanning Fee$ -:30 . CK3 Radon Fee$ DBPR$ Notary$ Technology Fee$ Training/Education Fee$ Double Fee$ Structural Reviews$ Bond$ TOTAL FEE NOW DUE$o`�I (Revised02/24/2014) a L(D ,Q1� Bonding Company's Name(if applicable) Bonding Company's Address City State Zip Mortgage Lender's Name(if applicable) Mortgage Lender's Address t City State Zip Application is hereby made to obtain a permit to do the work and installations as indicated. I certify that no work or installation has commenced prior to the issuance of a permit and that all work will be performed to meet the standards of all laws regulating construction in this jurisdiction. I understand that a separate permit must be secured for ELECTRIC, PLUMBING, SIGNS, POOLS, FURNACES, BOILERS, HEATERS,TANKS,AIR CONDITIONERS, ETC..... OWNER'S AFFIDAVIT: I certify that all the foregoing information is accurate and that all work will be done in compliance with all applicable laws regulating construction and zoning. "WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT." Notice to Applicant: As a condition to the issuance of a building permit with an estimated value exceeding$2500, the applicant must promise in good faith that a copy of the notice of commencement and construction lien law brochure will be delivered to the person whose property is subject to attachment. Also, a certified copy of the recorded no ' ommencement must be posted at the job site for the first inspection which occurs seven (7) days after the building per it is issued. In the absence of such posted notice, the inspection will not be approved and a reinspection fee will be charged. JL4 A c�k�'CY Signature Sign ture OWNER or AGENT CONTRACTOR The foregoing instrument was acknowledged before me this The foregoing instrument /was acknowledgedJbere me this / day of_Zy/p (1,F-4-7 �, 20 by day of /1 U��'t'� , by �Pi(6N0 �LtJ Ooj Il-A who is personally known to � who is personally known to 1 me or who has produced ))L as me or who has produced i? l as identification and who did take an oath. identification and who did take an oath. NOTARY PUBLIC: NOTARY PUBLIC: Sign: lU, 20060 Sign: JubEFINKNATZ Print: , t Nu i &= rida' Print: S r of Florida zN •p Y Comm.E pires Sep 30,2018 Commission#FF 164325 12,0 A'� Commission FF 164325 Seal: :�o�.� ' Bonded through National Notary Assn. Seal: ,,• """'"• Bonded through National Notary Assn. APPROVED BY Plans Examiner Zoning Structural Review Clerk (Revised02/24/2014) GD ART CONSTRUCTION INC. 6770 Indian Creek Dr. #4D Miami Beach, FL 33141 Ph: 305 537 8079 / 305 439 8788 Fax: 786 275 6263 www. gdartconstruction. com CHANGE ORDER 4� FM MIN ITMO Client: GD Art Construction V Address: 9935 NE 13'h Avenue 0Fe-' "- Description: Change order after approved plan, JA Date: 11/14/15 wr Scoope of Work: STRUCTURAL 1. A-13 Page, S-1, S-4, S-8: The existing concrete trusses could not remain and had to be removed along with some portions of steam wall in order to build the footing requested on plans. See detailed note on S-1 and described on S-4 as detail F. New trusses would need to be installed in this area in order to level floor with the rest of the house. (this is the area of the house that had step down with Cuban tiles before). Costs related to demolition of existing beams and steam wall $1,200.00 2. Section house in living room by glass doors. (it was going to be leveled with 2x6 on top of existing; now it will need 2x12 full installation; credit for process considered on initial estimate considered), cost of Steam wall repairs $1,,300.00 3. Existing trusses in the whole house were initially going to be repaired however only a 20% replacement had been considered to be installed new on the initiV1*e9fkr;a e-*Allbpt-ah 80% of the trusses was removed . ,j . 0 0 0 0 during demoliti6p* . Cisk.if�irtqitibn: $1,200 4. Install new tru5se%2x12oaseper pFaos!:See revised plans. Approximately an 80% of the t6tai-ribr;teriof trt;.%sejjwiII be installed new. Cost Materials, truss bracing; an; installation: $6,110.00 V: , S. Install new plywood on all floors (only sections had originally been considered to replace; after revision, all floors will have new plywood) Cost Materials and Installation: $2,540.00 6. General demolition debris, dirt and labor necessary and not considered on the original scope; resulted after decision of removing floors $1,200.00 7. The process of demolition was larger than expected and quoted originally. This was due to the existing conditions of some of the trusses and accessibility of equipment to realize the demo. The client was affected with extra costs reflected on this change order. Part of this cost ($4,765.00) was absorbed by the developer company Subtotal: $18,515.00 Discount Contractor: ($4,765.00) Total : $13,750.00 TERMS: $9,375.00 WITH PHASE B PAYMENT 2 TERMIS: $4,000.00 WITH PHASE E PAYMENT 1 .. ... . . . . . .. . .. . . . . ... . .. ... .. . . . .. . ... . ... ... ... .. . . .. . . . . . .. . .. . . .. ... . ... . . . ... . . . . ... . . . . . . . . . . . . . .. .. . . . .. .. ... . . . ... . . Work Item Cost N/A Developer Subcontract/owner Permit Processing 2500 Permit fees Subtotal $ 2,500.00 Demolition 2500 Septic tank 8000 Retaining wall 1500 Foundation 5200 Concrete 3100 Subtotal $ 12,300.00 $ 8,000.00 Framing 3000 Roof framing 11000 Roof tiling 21300 • Windows 27500 •••••• Windows installation 3500 ...... . .. ...... Floor reinforcement 3000 ...... Plywood (repair areas) 2500 •••• • Durock 4450 ���• ����• ...... . ... ..... Masonry 5550 .. .. .. ...... Insulation 1500 •"••• • . . . . ...... Subtotal $ 83,300.00 $ - •••••• Electrical 16800 .. ... Plumbing 17400 HVAC(Equipments) 14900 AC Ducts 5300 Subtotal $ 54,400.00 $ - Drywall 13500 Interior trim 4500 Plaster and finish 4000 Painting 4000 Subtotal $ 26,000.00 $ - Stucco 5000 Entrance front wall the 2000 Front concrete pathway 1500 Concrete driveway 2000 Garage door restoration 500 Subtotal $ 11,000.00 $ - Floor installation 10200 Floor tiles 10000 Bathroom tiles 2500 Bathroom tiles installation 2700 Baseboards 1450 Subtotal $ 26,850.00 $ - Appliances 7000 Kitchen Cabinets 4000 Cabinet installation 1200 • 4040.... Kitchen Countertops 3000 4040.... Subtotal $ 8,200.00 $ 7,000.00 ' 4040,... 0 4040 4040.... Lighiting or electric fixtures 7500 • 4040.... 4040.... Bathroom fixtures 8800 •••• • 4040 4040.... Finishings carpentry Interior 3500 4040.... . 4011 40 00000 Finishing dock repairs 3500 4040 4040 4040 40600•40 Interior doors(12) 7500 •••••• • . . . . 4040.... Subtotal $ 27,300.00 $ 3,500.00 •..... Landscaping 7500 '4040" 0 ... ;""; Trellis wood structure 6000 •• • Pavers exterior 2850 Railings 800 Subtotal $ - $ 17,150.00 Trash containers 3000 Clean up 1500 Portable toilets 700 Subtotal $ 4,500.00 $ 700.00 Overhead 5000 Profit 25000 Subtotal $ 30,000.00 $ - Demo.Concrete and steam wall partial $ 1,200.00 Ln Steam wall repairs and built $ 1,300.00 Demolition trusses $ 1,200.00 L Floor trusses $ 3,600.00 -a Installation Materials $ 560.00 ° Labor trusses installation $ 1,950.00 4) c Plywood (floors 100%) $ 1,440.00 Demolition general change order $ 1,200.00 Labor plywood installation $ 1,300.00 Subtotal $ 13,750.00 Cost of extras Trusses damaged on demo(replaced) $ 2,700.00 absorved by contractor Labor trusses installation (partial) $ 900.00 due to extra demolition Straps Aprox. 150 units $ 415.00 not considered on initial Nails and miscelaneous $ 750.00 """ 0000.. estimate Isubtotal 4,765.00 .. .. TOTAL $ 302,365.00 1 $ 36,350.00600 0 0 0 0 0 00.000 0 0 9 0000 .6090. 9 9 .9999. 0000 . 00000 0000.. 0000 0000.0 .. .. 00 9 000000 0000.. . 0 . . . . .90000 999999 9 0000.. .. . 0 ... GD ART CONSTRUCTION INC. 6770 Indian Creek Dr. #4D Miami Beach, FL 33141 Ph: 305 537 8079 / 305 439 8788 Fax: 786 275 6263 www.gdartconstruction. com CHANGE ORDER Client: GD Art Construction Address: 9935 NE 13`h Avenue Description: Change order after approved plans Date: 11/09/15 Scoope of Work: STRUCTURAL 1. A-13 Page, S-1, S-4, S-8: The existing concrete trusses could not remain and had to be removed along with some portions of steam wall in order to build the footing requested on plans. See detailed note on S-1 and described on S-4 as detail F. New trusses would need to be installed in this area in order to level floor with the rest of the house. (this is the area of the house that had step down with Cuban tiles before). Costs related to demolition of existing beams and steam wall $1,200.00 2. Section house in living room by glass doors. (it was going to be leveled with 2x6 on top of existing; now it will need 2x12 full installation; credit for process considered on initial estimate considered), cost of Steam wall repairs $1,300.00 3. Existing trusses in the whole house were initially going to be repaired however only a 20% replacement had been considered to be installed new on the initial estimate. About an 80% of the trusses was removed during demolition. Cost of demolition: $1,200 4. Install new trusses 2x12 as per plans. See revised plans. Approximately an 80% of the total number of trusses will be installed new. Cost Materials, truss bracings and installation: $6,110.00 5. Install new plywood on all floors (only sections had originally been considered to replace; after revision, all floors will have new plywood) Cost Materials and Installation: $2,540.00 6. General demolition debris, dirt and labor necessary and not considered on the original scope; resulted after decision of removing floors $1,200.00 wisp If LF •uxawc 1 r TV nom_ 6"I"d — 14 rx D g , 1 I x fx. J i i "k r_r0/1 (j U-iAITECT . Inc. PROPOSED NEW ADO�rA"'� � 'kC>VROr`Ca{a1.ONAl. For:*a O ��O n FaWan, At:993.3 NE 13rd A i m Ki.�nsa•s•r" � ._ i CONtw►Croa vn.w Mt l�w'dP R�s�ta •s TOTAL: $13,750.00 TERMS: $9,375.00 WITH PHASE B PAYMENT 2 TERMIS: $ 4,000.00 WITH PHASE E PAYMENT 1