Loading...
DOCK-16-1284 m ~~ 7 2016 LBY'. a. House Electrical GEM Unit Panel 30 A GFCl 120/240V Breaker Control 150 A 1P Feeding Panel Dock ° ° ° °°°�° ° ° 00000 000090Conduit V°°°: �g °°°°°° ° ° ° °°°°°° LEAF ENGINEERING NEW MARGINAL DOCK AND BOAT LIFT 1350 NE 101 Street Miami, Florida 33138 Job#16-008 STRUCTURAL CALCULATIONS DOCK CALCULATIONS - SHEET 1 -2 REPORT 1 —2 March 9, 2016 FEFI/yq�� No. 71519 ®2 STATE OF Z _ ( 5-4O ` LEANDRo FERNANDEZ, P.E. FL PE#71519 LEAF ENGINEERING CA#29771 LEAF ENGINEERING 85 NW 86th Street, Miami, Florida 33150 786.390.7493-Ieaf(KeafEngineering,net Page 12 STRUCTURAL CALCULATIONS FOR THE DOCK -Design in accordance with FBC 2014,NDS 2005,and current addendums. 40'x 12 new marginal dock and 7,0001#boat-lift(4 posts by Golden Lifts) -Dock loading total gravity load=60 psf -Max.Pile spacing=12' -Stringers Max.Clear span=12' -Joist Max.Clear span=9' -Decking span=18"(1.5) -Adjustment factors: -Cm=0.85, Cr-1.15, Cfu=1.15 Design values(southem pine -Stringer-3x12#1 dense,Fb=1,100 psi -Joists—3x8#1 dense,Fb=1,350 psi -Decking—2x6#1 dense,Fb=1,500 psi 4 x 12 Stringers: Loading 60psf x 5'=300 plf Bending: M=300 plf x(12'"2)/8=5,400 Ib-ft f b=5,400 Ib-ft x 171 l 73.83 in"3=877 psi F'b=1,100 psi x 0.85=935 psi>877 psi=f b OK BENDING Shear. Depth of section is 7.5" fv=300plf x 6'=1,800# Fv=175psi x 0.97 x 3.5"x 7.5"= 4,455#>1,800# OK SHEAR Stringer to piles=60 psf x 5'x 6=1,800#to be resisted by(2)1"dia.through bolts good for 953#x 2=1,906#>1,800# (see report#1) OK CONNECTION Hanging blocks: Loading on hanging blocks=60psf x 6'x 10'=3,600#to be transmitted to block with(2)1"dia through bolts good for 953#x 2(2bofts)x 2(double shear)=3,812# OK CONNECTION Hanging block to concrete seawall cap,use(2)1"dia anchor bolts,6"min.embedment into concrete seawall cap good for 2,202#x 2 bolts=4,404#>3,600# OK CONNECTION 12" i .pLles Pile capacity 15 tons=30,000# Loading=3,600#+7,000#/4=5,350#<30,000# OK PILE LOADING 3 x 8 Joists Q 18"O.C. Loading 60 psf x 1.5'=90 plf Bending: M=90 plf x(9'"2)18= 911 Ib-ft f b=911 Ib-ft x 127/21.9 in"3=499 psi F'b=1,500 psi x 0.85 x 1.15=1,466 psi>499 psi=fb OK BENDING LEAF ENGINEERING 85 NW 861 h Street, Miami, Florida 33150 786.390.7493-leaf@LeafEngineer ng.net Page 712 Shear. Depth of section is the whole member,7.25" fv=90PI x 4.5'=405# Fv=175psi x 0.97 x 2.5"x 7.25"=3,077#>405# OK SHEAR Attached to stringers with LTS12 SS 1"strap w/(4)10d nails top&bottom. 2 x 6 Decking 0 6"O.C. Loading 60 psf x 0.5'=30 plf M=30 plf x(1.75')"2/8=11.5 Ib-ft f b=11.5 Ib-ft x 1 V/0.92 in"3=150 psi F'b=1,500 psi x 0.85 x 1.15 x 1.15= 1,686 psi>150 psi=fb OK BENDING Shear. fv=30plf x 1.7572=26.3# Fv=175psi x 0.97 x 5.5"x 1.5"=1,400#>26.3# OK SHEAR Attached to each joist w/(2)#10 x 3"S.S.decking screws. If you have any question or comments,please do not hesitate to contact me at IeafOleafengineedng.net or call me at 786.390.7493 Sincerely, �pjkO FER V No. 71519 �= Ar LEANDRO FERNANDEZ, STATE OF FL PE#71519 LEAF ENGINEERING /i®)VAI.��G Illltl CA#29777 LEAF ENGINEERING 85 NW 861 h Street, Miami, Florida 33150 786.390.7493-leaf l-eafEngineering.net Design Methal Allowable Stress Design (ASD) 61-008 1350 NE 101 ST Connection Type Lateral loading : REPORT 1 Fastener Type Bolt Loading Scenario Single Shear- Wood Main Member Main Member Type Southern Pine Main Member Thickness 3.5 in. Main Member:Angle of Load to Grain Fo Side Member Type Southern Pine 0 Side Member Thickness 3.5 in. 0 Side Member.Angle of Load to Grain Fgo Fastener Diameter 1 in. C Load Duration Factor C_D = 1.0 C Wet Service Factor C_M = 0.7 0 Temperature Factor F7771.0 C Connection Yield Modes Im 30141];. Is 1250 Ibs. II 95311;. HIM 13091hs. Ills 975 lbs: IV 12871 . Adjusted ASD Capacity PRFIbs. I • Bolt bending yield strength of 45,000 psi is assumed. • The Adjusted ASD Capacity is only applicable for bolts with adequate end distance, edge distance and spacing per NDS chapter 11. While every effort has been made to insure the accuracy of the information presented,and special effort has been made to assure that the information reflects the state-of-the-art,neither the American Wood Council nor its members assume any responsibility for any particular design prepared from this on-line Connection Calculator.Those using this on-line Connection Calculator assume all liability from its use. The Connection Calculator was designed and created by Cameron Knudson,Michael Dodson and David Pollock at Washington State University.Support for development of the Connection Calculator was provided by American Wood Council. Design Method Allowable Stress Design (ASD) 61-008 . 101 ST REP Connection Type Lateral loading : REPORR T 2 Fastener Type Bolt C Loading Scenario Single Shear- Concrete Main Member 0 Main Member Type Concrete 0 Bolt Embedment Depth in 6 in. 0 Concrete Main Member:Angle of 0 Load to Grain Side Member Type Southern Pine 0 AJ Side Member Thickness --Other(in inches) -- 5.5 Side Member:Angle of 0 Load to Grain Fastener Diameter 7/8 in. C Load Duration Factor C_D = 1.0 Wet Service Factor C_M = 0.7 0 Temperature Factor C_t= 1.0 C Connection Yield Modes Im 6$91 lbs. Is 51791bs. 11 27861bs. I1Im 2943lbs. Ills 2431 lbs. IV 166861bs. Adjusted ASD Capacity 16861 Ibs. I • Bolt bending yield strength of 45,000 psi is assumed. • The Adjusted ASD Capacity is only applicable for bolts with adequate end distance, edge distance and spacing per NDS chapter 11. While every effort has been made to insure the accuracy of the information presented,and special effort has been made to assure that the information reflects the state-of-the-art,neither the American Wood Council nor its members assume any responsibility for any particular design prepared from this on-line Connection Calculator.Those using this on-line Connection Calculator assume all liability from its use. The Connection Calculator was designed and created by Cameron Knudson,Michael Dodson and David Pollock at Washington State University.Support for development of the Connection Calculator was provided by American Wood Council. GENERAL NOTES GENERAL ELEVATIONS SHOWN REFER TO THE NATIONAL GEODETIC VERTI DA VD) 92 - - ALL DIMENSIONS ON PLANS ARE SUBJECT TO VERIFICATION IN FI BI SG 4`) 1,pFr �j•Q�, - IT 15 THE INTENT OF THESE PLANS TO BE IN ACCORDANCE WITH OD ND AU PITIES HAVING JURISDICTION, ANY DISCREPANCIES BETWEEN THESE PLAN ND IC CO L BE \"- IMMEDIATELY BROUGHT TO THE ATTENTION OF THE ENGINEER B RF PR IN K., IT 15 THE INTENT OF THESE PLANS AND THE RESPONSIBILITY OF E CO -TOK TO C6M TH LOCAL, �_� STATE AND FEDERAL ENVIRONMENTAL PERMITS 155U ED FOR TH PROEV IT SHALL BE THE UNTRACTOR5 R=2.1°5,40 -35' RESPONSIBILITY TO FAMILIARIZE AND GOVERN HIMSELF BY ALL VISIONS OF TH&tE FERMI 4.6r Dc,Ji,vT 409 APPLICABLE BUILDING CODE: FLORIDA BUILDING CODE, 2014 EDITION,CURRENT ADDENDUMS,AND A.5.C.E. 7-10,A5 km_ 1� <.� 3 ' 'Fov0P\c�• DESIGN LOADSGcf) %7'6 _.-p __. 16--_ °-Z �o „ 87ti'Zs^ - t 2g 1. DOCK LL 60 PSF IERMIT WOOD PILING • Q ; PLti� �I ` 2r S 1.WOOD DOCK PILES SHALL BE 12"DIAMETER PILI n. MIN.BEARING CAPACITY MIAMI SHORES VALLAGE a X06' _@�• �: �-✓� H i v 2. PILES SHALL BE CUT OFF AT ELEVATIONS SHOWN . 26:15 r. '., N 1 r 50 HARDWARE: 'APPROVED BY DATE A Sok o 0 Pao ftirr ti Qooucss • ALL HARDWARE TO BE HOT DIPPED GALVANIZED AC 80 OR ST t N 135os-If-r 101 sr STEEL a' Mrc.+� �yaac V-L. /I P 217D'n•, P in -_— 33136 r BOLTS: ZONING J .15.40'ac; ALL MACHINE BOLTS TO BE HOT DIPPED GALVANZIE e3a a •y s2.5 H.4ti c g•s, �� r�R,cK•e 101551TE FASTENING NOTES: UA3 Tow+-. �( • 2G.851 -Cs19_ A.4 X 12 STRINGER TO PILES-TWO I"DIA.THRU-��L1'J' �6 ) 'Jg TURAL B.JOISTS TO STRINGER:51MP50N LTS 12 5.5.STRAPS(NOA 1045(;.29)W(4) I Od NAILS TOP b BOTTOM 2^ N crGD o.b ti c� C. 2 X 8 FASCIA TO JOISTS-TWO I Gd NAILS INTO JOISTS ENDS.O 1 #10 S.S.DECK SCREWS 9l ` rlcuGt� t EACH DECKING BOARD. E T D. 2 x G TROPICAL TREATED PINE DECKING TO J0I59 1 WU#f CTST INLESS STEEL DECK SCBE �eo:w1��,Pdt�E �'•a Y32t _L4 cwoao) EACH. 'ZcRPjr� oEs:L\oLL LUMBER: 0. 0.' •' ' F'0-0 Ij° p,p w ALL LUMBER SHALL BE#I DENSE,KILN DRIED,AND M PE55UF E TREATED WITH A.C.Q.TO. O .gprt,R-5 -lJa756' •y d win, Ona moi, - 1ti PILE DRIVING NOTES N _ Lb�, 20, G"a"r N 1.PILE DRIVING OPERATIONS SHALL BE OBSERVED Wq-+fik-jq%ALW PECTOR,INCLUDING THE T T tA.921 PILING,TO DETERMINE PROPER PILING LENGTH TO MEET THE DESIGN CRITERIA. N^ cL C4` CJ I sT HJT 2.PILES TO BE DRIVEN WITH AN APPROPRIATE FOLLOW BLOCK,WIT A BUFFER MATERIAL SUITAE LE TO ALLOW THE TRANSMISSION OF THE HAMMER ENERGY DBLDG. RE C E I'VE3.PILES SHALL BE DRIVEN TO REQUIRED CAPACITY A MINIMUM OF 'INTO ROCK OR A MINIMUMOF I ,,. 12'INTO YIELDING MATERIAL.WHERE HIGH RESISTANCE OF 5 ENCOUNTERED PRE PUNgbING OR DRILLING SHALL BE UTILIZED TO ACHIEVE THE PROPER PENETRATION. MAR 16 2016 y _ � �EcT TO n�PLIAr��E WITHI—L FEDERAL a 4. PILES SHALL BE DRIVEN USING A DROP HAMMER OR GRAVITY HAMMER OF 4000 POUNDS,WITH A ; G'DROP OF THE HAMMER !'SIC ANO CGUNTY RULES AND REf7�.ILATIQ1,,' DERM Coastal Resources Section Natural Resou u bURCES DIVISION L/ 5.PILES SHALL BE DRIVEN WITH NO MORE THAN Aa INCH VARIATION PER FOOT FROM THE VERTICAL Dh OR BATTER LINE INDICATED,WITH A MAXIMUM VARIATION OF THE HEAD OF THE PIL E L (NARY APP OVAL &Dj 14 POSITION SHOWN ON THE PLANS OF NOT MORE THAN 3 INCHES NAME MATE I(O � � ! ''.f ' �• � "1. r�1.� I ���� �0�0 FER N�/�/ `��� �t`P•��G E N Fc' i MAY 12 2016 N LEANDKO FERNANDEZ DOCK AND M ARI N E DWG#: I G-008 . 71 .W LEAF ENGINEERING CONSTRUCTION, CORP. NEW MARGINAL DOCK, PAGE TITLE: DATE: 09110/15 DRAWN BY: GL C.A. 29777 752 NE 79TH STREET REVISIONS: TATF f (786)390-7493 MIAMI, FL 33 138 FINGER PIER AND BOAT MAP, PROPOSED r leaf@leafeneglneering.net 305-75 1-99 I I LIFT AT SITE PLAN, AND 1 • F: 305-75 1-4825 1350 N.E. 101 ST STREET �// NA � 85 N.W. 86Th STREET glar5on@dockandmarine.netNOTE5 2 I L ll"Iffi DEZ MIAMI, FL 331 50 www.dockandmarine.net MIAMI , FL 33 138 of 5 LICENSE#7 15 19 r RECEIVED .�,.�....,..."' MSR 16 2016 DERM Coastal Resources Section Natural Resources Regulation&Restoration Division(NRRRD) RER.NATURAL RESOURCES DIVISION PRELIMINARY PP NAME �U DATE X15TING SEAWALL TO REMAIN EXISTING DAVIT ST'Pi t� TO BE REMOVED O .meg F •q•PB •P '>' „e;,'$ i•L. •�► .P d• :s.• :tO a•�'.' ap st ✓ .,p. P•• P,'^ � P •J': .•Y •ae w4 ^,gA M`' 4.j., >P 'ti• °P. P �'�°' # 9 !.eii. �-P .► •®°'. ✓' .;••"'';•� ro• ate',^• Pi. '.r. J t, .•.' :?.� aye ,�' �.A•. 'Y i.• •: °:. 'b '„a •,•• y�� tit w: .�i .Paw .! A•• :wy.. p ,t{ •o "✓ aP a ..?� i• t� •a i 'j, 9G.4' P.t t•.d t.>.' 'C •C a . .b•' .2. 9G.4' LEANDRO FERNANDEZ DOCK AND MARINE7 LEAF ENGINEERING PAGE TITLE: DWG#: 16-008 :LU DATE: 09/10/15 CONSTRUCTION, CORP. NEW MARGINAL DOCK C.A. 29777 752 NE 79TH STREET FINGER PIER AND BOAT EXISTING DRAWN BY: GL STA F �* (78G)390-7493 MIAMI, FL 33138 REVISIONS: ,c �� 3- h 305-751-9911 LIFT AT CONDITIONS i leaf@leafenegmeenng.net F: 305-751-4825 1350 N.E. 101 ST STREET I• PAGE ���/ ® N A- 85 N.W. SGTH STREET glarson@dockandmanne.net MIAMI . FL 33135 101 EZ MIAMI, FL 33150 www.dockandmanne.net 2. 2 of 5 LICENSE#71519 7000 POUND BOAT LIFT WITH MECHANICAL STOP SET 1211 ABOVE ADJACENT LOW WATER (� OvY>rit 1.t$T PI�LNL 101-01 sok.AR APPROXIMATE EDGE OF SEAGRAS to aw rAct) PrctaG poC,rc Pt�•T,�3Gg sNA� 1tAVE t'1�C.4MuZcR� RrEp.0c.VoR5 ON cTRCM�SL�'S PROPOSED 40'X 12' 25'-0" �CE1 DOCK 10'-011 10'-0" 10'-0° MAR 16 20% DERM Coastal Resources Section 14 p ' Natural Resources Regulation&Restoration N Q Division(NRRRD) RER-NATURAL RESOURCES DIASI o x-9 PRELIMINARY APPR® N �' NAME .'a: «+'° �a. ^p J'::5. R:' en :d .s,., y .e+ eyr .b. �... .t '°!• � �.r°•• ;•.r ... '%'t D• 6. �.° r� •ee r 4 ►• 'Y .Mf• 'B•' 't' T~ •r.: •r 'ms C� rt•. .D ♦•� gys' "�r.. 4•. � a•'.•°• ^N'•• may"' •t �,'i' w'a .i •'ee a ..ee� ♦�. p' '�,. ms'... :oq° >•.e b •'0 •b Jy e e.r •a •,fie: 311-411 40'-0" 25'-0" 7I 96'-4" ISTING SEAWALL AND <i 1'i iii KING PILING TO REMAIN 0P\���,< N 1 LEANDROFERNANDEZ DOCK AND MARINE DWG#: 16-008 _ LEAF ENGINEERING CONSTRUCTION, CORP. PAGE TITLE: . ``' NEW MARGINAL DOCK, DATE: 09110/15 f,[d C.A. 29777 752 NE 79TH STREET DRAWN BY: GL �— FINGER PIER AND BOAT PROP05ED LAYOUT TATE / n' (786)390-7493 MIAMI, FL 33 138 REV15IONS: LIFT AT leaf@Ieafenecjincenng.net 305-751-991 1 O C� F: 305-751-4525 1350 N.E. 1015T STREET I. / .......... 85 N.W. 86TH STREET 31ar5on@dockandmanne.net EZ MIAMI, FL 33150 www.dor-kandmanne.net MIAMI r FL 33 138 PAGE 2• of 5 UCEN #71519 PROPOSED NEW TIMBER PILING 12" MIN DIAMETER D 2XG TROPICAL TREATED PROPOSED NEW PINE FOR DECKING TIMBER PILING 12' 2XG TROPICAL TREATED DECKING RECEIVED LTS 12 S.S. MIN DIAMETER HURRICANE STRAPS 3X8 JOISTS @ 1,5"5EE NOTES 3X8 JOISTS @ 18 F(ASTENEER B) NO ON CENTER SEE ES TROPICAL TREATED MAX ON CENTER MAR 1-6 2016 PINE FASCIA ON 2X8 DERM Coastal Reso SUB FASTENER EER O EC Natuna!Resources Regulation&ReesstonWon d Division(NRRRD) RER.NATURAL RESOURCES DIVISION 4"X 12" PRELIMINARY APPROVAL STRINGER NAME � (2) I"X20"GALVANIZED "' T'3.41 L l/l� + ,a THRU BOLTS(SEE ROPOSED I"X 12"LTS 1 2 SS STRAP ®ATS (2) 1"X20"GALVANIZED MEASUREMENTS FASTENER NOTE A) (SEE NOTES: FASTENERS(B) _ THRU BOLTS(SEE TAKEN FROM 6" PROPOSED 4X 12 FASTENER NOTE A) CENTER OF BOLT STRINGER If A DETAIL IN DETAIL'B' N.T.S. N.T.S. 1"5.5.WEDGE ANCHORS BOLT5 BY G"X 12"X 24"PT WOOD 51MP50N FASTENERS INTOLONG HANGERTYP.U.O.N. `msµ SEAWALL,MIN EMBEDMENT G" 1 1.25" NEW CCA PILIN 7 A O m 4 x 12 STRINGERS c� B — O AX JOIST SPACING 18" cO 3X8 JOISTS 0 (2) I° X 20"GALVANIZED N FASTENED NOTE A m 1 11 YcY HANGER BLOCK g ;. �.i.•:..;, ; s:: :.::: .,, ,+: .i DETAIL "C' ',•• .d' g�0� �••1.)v,t•.,A,,.��, t •{ 1. .'1. •e' +'• a/•B .•�.. •1.L•••.••B�• X 12 HANGER X 12 STRINGER BLOCK SEE DETAIL 'C' ABOVE FOR CONNECTIONS �NpRO LEANDRO FERNANDEZ DOCK AND MARINE - DWG#: 16-008 ,.. LEAF ENGINEERING CONSTRUCTION, CORP. NEW MARGINAL DOCK, PAGE TITLE: DATE: 09/10/15 C.A. 29777 752 NE 79TH STREET — (786)390-7493 �— MIAMI, FL 33 138 FINGER PIER AND BOAT FRAMING AND REVISIONS: DRAWN BY: GL i ATE 305-751-9911 LIFT AT DETAILS leaf@leafcnegincenng.net F: 305-751-4825 1350 N.E. I O I ST STREET 1 • PAGE �' 85 N.W. 86TH STREET glarson@dockandmanne.net k Q MIAMI, FL 33150 www.dockandmanne.net MIAMI , FL 33 138 2• 4d 5 LIG� #71519 ED ROPOSED 7,000 POUND BOAT IV LI Fr LIAR 16 2016 WOOD DECKING ON MARGINAL DOCK \l� DERM Coastal Resources Section ATTACHED TO JOIST A5 PER NOTE �' Natural Resources Regulation&Restoration ON PAGE ONE 10,-6„ r���SOS. L-14wc Division(NRRRD) RER-NATURAL RESOURCES DIVISION PRELIMINARY APPROVAL 121-011 EW CCAAME I PILIN 1i9®AT � JOIST SPACING NOT l TO EXCEED 18" SEE r► N�c.,�� c�sc�Ca> NOTES AND DETAILS 3X8 JOIST O ON PAGE 4 � TOP OF DOCK EL. +5' (N.G.V.D) 4X 12 STRI NGER EXISTING SEAWALL, X 12 HANGER BOARD, SEE CAP AND KIN j°\ ` DETAIL'C' ON PAGE 4 /\ PILING TO REMAIN \\ MHW (NGVD) EL. + I .G' +MLW (NGVD) EL. -0.4' . •® \ \ � BERM (NGVD) EL. -I .4' CA PILING DRIVEN G' INTO ROCK 12' \/\/\/\ ® / INTO YIELDING MATERIAL TO ACH I EVE 15 \/i\//\✓i\/i\//\ \ TONS MIN SAFE BEARING i \\i\\i\\/\\/\\/\\i\\i\\i\\i\i /i\\/i\\ \ \ \ \ \\/i\\/i\\/i\\/i\\//\\/i\\ \/i\/i\/i\ \ \/i\✓i\/i\/i\/i\/i\/i\/s\/i\/i / /\/i\/i\/i\/ioo 'N` P; tG E MRNqNO�c�'/moi LEANDRO FERNANDEZ 1 LEAF ENGINEERING DOCK AND MARINE PAGE TITLE: DWG#: I G-008 v: 71 CONSTRUCTION, CORP. NEW MARGINAL DOCK, DATE. 09/I O/15 W C.A. 29777 752 NE 79TH STREET DRAWN BY: GL 0. STA OF ` (786)390-7493 C� MIAMI, FL 33138 FINGER PIER AND BOAT DOCK AND LIFT REVISIONS: � ` V 305-751-991 I LIFT AT SECTION �i,�� �'! ,. . leaf@leafene6jincenncj.net F: 305-751-4825 1350 N.E. 101 ST STREET I• PAGE 85 N.W. 8GTH STREET glarson@dockandmanne.net Q MIAMI, FL 33150 www.dockandmanne.net MIAMI , FL 33 138 2• 5 uF 5 LICENSE#71519 1 LOCATION SKETCH SCALE l"= � ';' � PLAN Or- sURVE`r' SCALE I" _ 30} JOS :13-7332 �1 }. I C x•10 ,i:. 1 4 '. �)L. P .�J A O $g �9F, n /{� f� A i 2 R=2 I��t -96 P35' NE /02 O STREETtp,, 63 l 4 0' U1T 4.68') Tb ? ^ I43 jlE 10) ' STREP S] Y�E .x.43 b. A• �S n ��n3 -. - —' Y - ,�' �1 �.icr I`x� a� u', �1z '���:. i•., � 4 (b - .CPQ t"C•s � •.`� } � � � t 1 }�JO In �•-0P5 � 51 r _­ P_Q" LEGAL DESGRIPTION:Lot 2,B�ock 1,MTAMI SVOItkg BAY PARR- ESTATES,according to the Plat thereof as _ 19 1718 recorded in Plat Book 55,Page 83 of the Public Records of Miami-Dade County,Florida.- R g `�q `° f 33t sF c.g•5fzsl I t3 a,caG'S GENERAL NOTES 2�,g } to (6,03) 1j OWNERSHIP IS SUBJECT TO OPINION OF TITLE. '� PbL F3� l ' 2 EXAMINATION OF THE ABSTRACT OF TITLE WILL HAVE TO BE MADE TO DETERMINE RECORDED INSTRUMENTS,IF ANY,AFFECTING e i!3 _ - V 21.4p} Lp/ tI; L THIS PROPERTY. NGV DATUM. 3) (2.22)DENOTES THOSE ELEVATIONS REFERRED TO _ D s UTILITIES ON AND/OR ADJACENT TO THE PROPERTY WERE NOT SECURED AS SUCH INFORMATION WAS DE NOTREQUOF U 4) LOCATION AND IDENTIFICATION OF UUPdated:April 29,2015 5 AE Base Flood Elevgion•9 feet X32 5) THIS PROPERTY IS WITHIN THE LIMITS OF THE FLOOD ZONE ated Ja ue ry 19 2015 �"`"° " �° w 6) NO UNDERGROUND LOCATIONS WERE DONE BY THIS COMPANY. dry DATE: ( 10 Foga }�y I - - o CERTIFIED TO: la `. w€ May 06,2013 V. �.,A _ PO 01 , APPLICABLE ZONING,UNDERGROUND,ZONING AND BUILDING SET BACKS,MUST BE CHECKED BY OWNER +� - ARCHITECT OR BUILDER BEFORE DESIGN OR CONSTRUCTION BEGINS ON THIS PROPERTY. k N HEREBY CERTIFY: That the attached Plan of Survey of the above described property is true and correct to the best of my knowledge,information and belief,as recently surveyed and platted i T. cA`: 7/A— I under my direction,also that there are not above-ground encroachments other than those shown. !� 1 "I /, (/ _ 12 g(� NI TEG This survey meets the minimum technical standards set forth by the Florida Board of Land Surveyors { ' ^�� 6z. t� 7 027,Florida Statues. pursuant toChapter 61G17-6, Florida Administrative Code,Section 472 1 N J . iL� MAY 1 ��� SURVEYING, INC L.B. NO. 3333 aro D.Alonso BY--= f'r. sslonalLand Surveyor � �, , 3,187 NW.167T"STREET,H5 Certificate No.3590 z /!!AMI, FLORIDA 33015 State of Florida o A....ARC DISTANCE A/C...AIR CONDITIONING CBS...CONCRETE BLOCK STRUCTURE O.U.L...OVERHEAD UTILITY LINE CL...CLEAR CIL...CENTER LIN RAD...RADIAL ENC...ENCP.OACHMENT R/W...RIGHT OF WAY... FIP...FOUND IRON PIPE O.H...OVER HEAD W.M....WATER METER C.H....CHORD 3,j5/512-4940 � ) IS I�OUNI]r�}�'�S(JRSJE'( DISTANCE P/L...PROPERTY LINE CONC...CONCRETE F.H.FIRE HYDRANT UP UTILITY POLE R...RADIUS U.E...UTILITY EASEMENT w - d,,.CENTRAL ANGLE R .RADIUS PL....PLANTER T.....TANGENT C 8.....CATCH BASIN MH....MANHOLE CLF...CHAIN LINK FENCE W.F.....WOOD FENCE NOT 1/ALiIJ UNLESS SEALER WITH AN EOSSED SURVEYOR'S SEAL . 7�p'L '��