Loading...
PLC-14-2598 (2) w � eP �' )y? Inspection Worksheet Miami Shores Village 10050 N.E.2nd Avenue Miami Shores, FL Phone: (305)795-2204 Fax: (305)756-8972 Inspection Number: INSP-249546 PermitNumber: PLC-11-14-2598 Scheduled Inspection Date: December 22,2015 Permit Type: Plumbing - Commercial Inspector: Diaz, Osvaldo Inspection Type: Piping Owner: ,BARRY UNIVERSITY Work Classification: New Job Address:11300 NE 2 Avenue Miami Shores,FL 33138-0000 Phone Number Parcel Number 1121360000050 Project: <NONE> Contractor: HG CONSTRUCTION DEVELOPMENT&INVESTMENT,INC Phone: (786)845-8999 Building Department Comments PROJECT CONSISTS OF APPROXIMATELY 2,100 LINEAL Infractio Passed Comments FEET OF PROPOSED, PRIVATE GRAVITY SANITARY INSPECTOR COMMENTS False SEWER MAIN EXTENSION TO SERVICE 6 EXISTING BUILDINGS THAT ARE CURRENTLY CONNECTED TO SEPTIC TANK SYSTEMS. THE EXISTING SEPTIC TANK AND ASSOCIATED DRAIN FIELDS WILL BE DEMOLISHED/ABANDONED AND SEWER SERVICE TRANSFERRED. Inspector Comments P s d L-i Failed Correction ❑ Needed Re-Inspection ❑ Fee No Additional Inspections can be scheduled until re-inspection fee is paid December 21,2015 For Inspections please call: (305)762-4949 Page 25 of 33 Kimley ))) Horn CONSTRUCTION OBSERVATION REPORT Client: Site Location: Project Name: Barry University 11300 NE 2nd Avenue,Miami Shore,FL 33161 Septic to Sewer Site Visit Purpose:Construction progress Time: Date: Pass/Fail: N/A 12/17/2015 N/A Present on Site: 1. Michael Marrero-Kimley-Horn and Associates 2. Jose Rivera-Kimley-Horn and Associates 3. Al Garcia—HG Construction 4. Carlos-HG Construction Comments/Notes: • MH-7 was installed and connected to pipe.-12/16/15 • Approximately 80 LF of sewer pipe were installed towards MH-6.-12/16/15 • Excavating and placing 8"pipe south towards S-6.—12/17/15 Request For Information: Page 1 of 4 Kimley ))) Horn CONSTRUCTION OBSERVATION REPORT Client: Site Location: Project Name: Barry University 11300 NE 2nd Avenue, Miami Shore, FL 33161 Septic to Sewer Description: Installation of MH-7 with grout seal around 8-inch Direction: Date: Photo: pipe to south. North 12/16/2015 1 rs a x v R> Description: Excavation and installation of pipe between MH-7 to Direction: Date: Photo: MH-6. North 12/16/2015 2 ri 'aS1yr' � li i Page 2 of 4 Kimley ))) Horn CONSTRUCTION OBSERVATION REPORT Client: Site Location: Project Name: Barry University 11300 NE 2"d Avenue, Miami Shore, FL 33161 Septic to Sewer Description: Excavation and installation of pipe between MH-7 to Direction: Date: Photo: MH-6. North 12/17/2015 3 7S .3• "c.97- fit a t d i Description: Excavation near MH-6 proposed location. Direction: Date: Photo: North 12/17/2015 4 •,s y Page 3 of 4 END OF REPORT Kimley ))) HornCONSTRUCTION OBSERVATION REPORT Client: Site Location: Project Name: Barry University 11300 NE 2"d Avenue, Miami Shore,FL 33161 Septic to Sewer Site Visit Purpose:Construction progress Time: Date: Pass/Fail: 2:50 PM-3:30 PM 1 12/18/2015 N/A Present on Site: 1. Michael Marrero-Kimley-Horn and Associates 2. Jose Rivera-Kimley-Horn and Associates 3. Carlos-HG Construction Comments/Notes: • MH-7 was installed and connected to pipe. • Pipe from MH-6 to MH-7 was approximately 90%installed and covered but not connected to MH-6. • MH-6 was set approximately 5-feet north of the proposed plan location to avoid conflict w/existing utilities. Request For Information: Pagel of 8 Kimley ))) Horn CONSTRUCTION OBSERVATION REPORT Client: Site Location: Project Name: Barry University 11300 NE 2nd Avenue, Miami Shore, FL 33161 Septic to Sewer Description: Excavation ad backfill of road between MH-7 to MH- Direction: Date: Photo: 6. South 12/18/2015 1 j f Description: Installation of MH-7 with grout seal around 8-inch Direction: Date: Photo: pipe to south. North 12/18/2015 2 .i..r k � � F •re �ya Page 2 of 8 Kimley ))) HornCONSTRUCTION OBSERVATION REPORT Client: Site Location: Project Name: Barry University 11300 NE 2"d Avenue, Miami Shore, FL 33161 Septic to Sewer Description: Grout seal around 8-inch pipe to south of MH-7. Direction: Date: Photo: Northeast 12/18/2015 3 77 f � 1� Description: Excavation and backfill around MH-7 Direction: Date: Photo: North 12/18/2015 4 a t Page 3 of 8 Kimley ))) HornCONSTRUCTION OBSERVATION REPORT Client: Site Location: Project Name: Barry University 11300 NE 2nd Avenue, Miami Shore, FL 33161 Septic to Sewer Description: Backfill over pipe between MH-7 to MH-6. Direction: Date: Photo: South 12/18/2015 5 V uZa az Description: Excavation and installation of MH-6 and pipe Direction: Date: Photo: between MH-7 to MH-6. North 12/18/2015 6 r. ,y I. Page 4 of 8 Kimley ))) Horn CONSTRUCTION OBSERVATION REPORT Client: Site Location: Project Name: Barry University 11300 NE 2nd Avenue, Miami Shore, FL 33161 Septic to Sewer Description: Excavation of pipe between MH-7 to MH-6. Existing Direction: Date: Photo: utility crossing just north of MH-6. Southwest 12/18/2015 7 L. x 'A Description: Description: Excavation of pipe between MH-7 to MH-6. Existing Direction: Date: Photo: utility crossing just north of MH-6. South 12/18/2015 8 I � .�I Ir t Mk: Page 5 of 8 Kimley ))) Horn CONSTRUCTION OBSERVATION REPORT Client: Site Location: Project Name: Barry University 11300 NE 2nd Avenue, Miami Shore, FL 33161 Septic to Sewer Description: Excavation and installation of MH-6 and pipe Direction: Date: Photo: between MH-7 to MH-6. North 12/18/2015 9 JW r { Description: Excavation and installation of MH-6 and pipe Direction: Date: Photo: between MH-7 to MH-6. North 12/18/2015 10 u f f Page 6 of 8 Kimley ))) Horn CONSTRUCTION OBSERVATION REPORT Client: Site Location: Project Name: Barry University 11300 NE 2"d Avenue, Miami Shore, FL 33161 Septic to Sewer Description: Excavation and installation of pipe between MH-7 to Direction: Date: Photo: MH-6. North 12/18/2015 11 Page 7 of 8 END OF REPORT