Loading...
PLC-14-2598 Kimley ))) Horn CONSTRUCTION OBSERVATION REPORT Client: Site Location: Project Name: Barry University 11300 NE 2"d Avenue,Miami Shore,FL 33161 Septic to Sewer Site Visit Purpose:Construction progress Time: Date: Pass/Fail: 9:23 AM-9:50 AM 1 01/07/2016 N/A Present on Site: 1. Jose Rivera-Kimley-Horn and Associates 2. Daniela Rivera-Kimley-Horn and Associates 3. Carlos—HG Construction 4. Jeffrey Yao—Barry University Comments/Notes: • MH-2 was installed and connected to existing sanitary MH-1 but not covered. • MH-3 has been installed and covered but with a storm lid(contractor to replace with"Sanitary"text on lid). • MH-4 has been installed and connected but not covered. • MH-5 MH-6 and MH-7 were installed and covered. • No laterals have been constructed. • Excavation of MH-8 in progress. Request For Information: Page 1 of 15 Kimley ))) HorrCONSTRUCTION OBSERVATION REPORT Client: Site Location: Project Name: Barry University 11300 NE 2'd Avenue, Miami Shore, FL 33161 Septic to Sewer Description: Backfilled trench between existing MH-1 and 771Direction: Date: Photo: proposed MH-2. West 01/07/2016 1 vvi Via. I+Its s� I IIIS s,i y y III � III I i Description: Installation of MH-2. Direction: Date: Photo: Southwest 01/07/2016 2 Ir a ,3 � , l Page 2 of 15 Kimley ))) HornCONSTRUCTION OBSERVATION REPORT Client: Site Location: Project Name: Barry University 11300 NE 2nd Avenue, Miami Shore, FL 33161 Septic to Sewer Description: Installation of MH-2. Direction: Date: Photo: North 01/07/2016 3 •�A { " 1 7 , Description: Installation of MH-3 and backfilled excavation. Direction: Date: Photo: Contractor shall replace "STORM"text lid with"SANITARY"lid. Northeast 01/07/2016 4 UJ Page 3 of 15 Kimley ))) Horn CONSTRUCTION OBSERVATION REPORT Client: Site Location: Project Name: Barry University 11300 NE 2nd Avenue, Miami Shore, FL 33161 Septic to Sewer Description: Installation of MH-3 and backfilled excavation. Direction: Date: Photo: Contractor shall replace "STORM"text lid with "SANITARY" lid. Northwest 01/07/2016 5 F �' ,�.:.r .Fly �`^♦ 7 j r Description: MH-4 installation. Direction: Date: Photo: South 01/07/2016 6 >; Y_ F Page 4 of 15 Kimley ))) HornCONSTRUCTION OBSERVATION REPORT Client: Site Location: Project Name: Barry University 11300 NE 2nd Avenue, Miami Shore, FL 33161 Septic to Sewer Description: MH-4 installation. Direction: Date: Photo: South 01/07/2016 7 < i f— w i d _ t Description: MH-4 installation. Direction: Date: Photo: North 01/07/2016 8 N, Page 5 of 15 Kimley ))) Horn CONSTRUCTION OBSERVATION REPORT Client: Site Location: Project Name: Barry University 11300 NE 2nd Avenue, Miami Shore, FL 33161 Septic to Sewer Description: Installation of MH-5 and backfilled excavation. Direction: Date: Photo: North 01/07/2016 9 'i ,{ t Description: Sidewalk replacement just south of MH-5. Direction: Date: Photo: Northeast 01/07/2016 10 4 a� Sr fb Page 6 of 15 Kimley ))) HornCONSTRUCTION OBSERVATION REPORT Client: Site Location: Project Name: Barry University 1 11300 NE 2"d Avenue, Miami Shore, FL 33161 Septic to Sewer Description: Sidewalk replacement between MH-5 and MH-6. Direction: Date: Photo: Northwest 01/07/2016 11 C y�. Description: Damage to the existing sidewalk between MH-5 and Direction: Date: Photo: MH-6. Northwest 01/07/2016 12 741 Qv' °✓5C z F.. ELJY E Page 7 of 15 Kimley ))) Horn CONSTRUCTION OBSERVATION REPORT Client: Site Location: Project Name: Barry University 1 11300 NE 2nd Avenue, Miami Shore, FL 33161 Septic to Sewer Description: Damage to the existing sidewalk between MH-5 and Direction: Date: Photo: MH-6. Northwest 01/07/2016 13 ' , ,'2 4 w.k A Y atd� I v �5' Description: : Installation of MH-6 and backfilled excavation. Direction: Date: Photo: Northeast 01/07/2016 14 Page 8 of 15 Kimley ))) Horn CONSTRUCTION OBSERVATION REPORT Client: Site Location: Project Name: Barry University 1 11300 NE 2nd Avenue, Miami Shore, FL 33161 Septic to Sewer Description: Backfilled trench filled between MH-6 and MH-7. Direction: Date: Photo: North 01/07/2016 15 P IP Description: Backfilled trench filled between MH-6 and MH-7. Direction: Date: Photo: North 01/07/2016 16 I Page 9 of 15 Kimley ))) HornCONSTRUCTION OBSERVATION REPORT Client: Site Location: Project Name: Barry University 11300 NE 2"d Avenue, Miami Shore, FL 33161 Septic to Sewer Description: MH-7 installed and excavation backfilled. Direction: Date: Photo: Northwest 01/07/2016 17 Y t Description: MH-7 installed and excavation backfilled. Direction: Date: Photo: North 01/07/2016 18 Jr40, , z x; r ,'. f Page 10 of 15 Kimley ))) HornCONSTRUCTION OBSERVATION REPORT Client: Site Location: Project Name: Barry University 11300 NE 2nd Avenue, Miami Shore, FL 33161 Septic to Sewer Description: Sidewalk replacement near MH-3. Direction: Date: Photo: Northeast 01/07/2016 19 v„ 4N Description: Sidewalk replacement near MH-3. Direction: Date: Photo: Northeast 01/07/2016 20 low 004, Ju v Page 11 of 15 Kimley ))) HornCONSTRUCTION OBSERVATION REPORT Client: Site Location: Project Name: Barry University 11300 NE 2nd Avenue, Miami Shore, FL 33161 Septic to Sewer Description: Sidewalk replacement just north of MH-4. Direction: Date: Photo: Northeast 01/07/2016 21 r' Description: Sidewalk replacement just north of MH-4. Direction: Date: Photo: Southwest 01/07/2016 22 h `r Page 12 of 15 Kimley ))) HornCONSTRUCTION OBSERVATION REPORT Client: Site Location: Project Name: Barry University 11300 NE 2"d Avenue, Miami Shore, FL 33161 Septic to Sewer Description: Excavation and installation of pipe between MH-2 Direction: Date. Photo: and MH-8. Northeast 01/07/2016 23 x; Description: Excavation and installation of pipe between MH-2 Direction: Date: Photo: and MH-8. Excavation of MH-8. Northeast 01/07/2016 24 a 5 Y f V: LLa� n� C w Page 13 of 15 Kimley ))) Horn CONSTRUCTION OBSERVATION REPORT Client: Site Location: Project Name: Barry University 1 11300 NE 2nd Avenue, Miami Shore, FL 33161 Septic to Sewer Description: Excavation and installation of pipe between MH-2 Direction: Date: Photo: and MH-8. Excavation of MH-8. Southwest 01/07/2016 25 k 3 1 AV Page 14 of 15 END OF REPORT