PLC-14-2598 Kimley ))) Horn CONSTRUCTION OBSERVATION REPORT
Client: Site Location: Project Name:
Barry University 11300 NE 2"d Avenue,Miami Shore,FL 33161 Septic to Sewer
Site Visit Purpose:Construction progress Time: Date: Pass/Fail:
9:23 AM-9:50 AM 1 01/07/2016 N/A
Present on Site:
1. Jose Rivera-Kimley-Horn and Associates
2. Daniela Rivera-Kimley-Horn and Associates
3. Carlos—HG Construction
4. Jeffrey Yao—Barry University
Comments/Notes:
• MH-2 was installed and connected to existing sanitary MH-1 but not covered.
• MH-3 has been installed and covered but with a storm lid(contractor to replace with"Sanitary"text on lid).
• MH-4 has been installed and connected but not covered.
• MH-5 MH-6 and MH-7 were installed and covered.
• No laterals have been constructed.
• Excavation of MH-8 in progress.
Request For Information:
Page 1 of 15
Kimley ))) HorrCONSTRUCTION OBSERVATION REPORT
Client: Site Location: Project Name:
Barry University 11300 NE 2'd Avenue, Miami Shore, FL 33161 Septic to Sewer
Description: Backfilled trench between existing MH-1 and 771Direction: Date: Photo:
proposed MH-2. West 01/07/2016 1
vvi Via.
I+Its
s� I IIIS s,i
y y III �
III I i
Description: Installation of MH-2. Direction: Date: Photo:
Southwest 01/07/2016 2
Ir
a
,3
� ,
l
Page 2 of 15
Kimley ))) HornCONSTRUCTION OBSERVATION REPORT
Client: Site Location: Project Name:
Barry University 11300 NE 2nd Avenue, Miami Shore, FL 33161 Septic to Sewer
Description: Installation of MH-2. Direction: Date: Photo:
North 01/07/2016 3
•�A
{
" 1 7
,
Description: Installation of MH-3 and backfilled excavation. Direction: Date: Photo:
Contractor shall replace "STORM"text lid with"SANITARY"lid. Northeast 01/07/2016 4
UJ
Page 3 of 15
Kimley ))) Horn CONSTRUCTION OBSERVATION REPORT
Client: Site Location: Project Name:
Barry University 11300 NE 2nd Avenue, Miami Shore, FL 33161 Septic to Sewer
Description: Installation of MH-3 and backfilled excavation. Direction: Date: Photo:
Contractor shall replace "STORM"text lid with "SANITARY" lid. Northwest 01/07/2016 5
F �' ,�.:.r .Fly �`^♦ 7
j
r
Description: MH-4 installation. Direction: Date: Photo:
South 01/07/2016 6
>;
Y_ F
Page 4 of 15
Kimley ))) HornCONSTRUCTION OBSERVATION REPORT
Client: Site Location: Project Name:
Barry University 11300 NE 2nd Avenue, Miami Shore, FL 33161 Septic to Sewer
Description: MH-4 installation. Direction: Date: Photo:
South 01/07/2016 7
< i
f—
w
i d
_ t
Description: MH-4 installation. Direction: Date: Photo:
North 01/07/2016 8
N,
Page 5 of 15
Kimley ))) Horn CONSTRUCTION OBSERVATION REPORT
Client: Site Location: Project Name:
Barry University 11300 NE 2nd Avenue, Miami Shore, FL 33161 Septic to Sewer
Description: Installation of MH-5 and backfilled excavation. Direction: Date: Photo:
North 01/07/2016 9
'i
,{ t
Description: Sidewalk replacement just south of MH-5. Direction: Date: Photo:
Northeast 01/07/2016 10
4
a�
Sr
fb
Page 6 of 15
Kimley ))) HornCONSTRUCTION OBSERVATION REPORT
Client: Site Location: Project Name:
Barry University 1 11300 NE 2"d Avenue, Miami Shore, FL 33161 Septic to Sewer
Description: Sidewalk replacement between MH-5 and MH-6. Direction: Date: Photo:
Northwest 01/07/2016 11
C y�.
Description: Damage to the existing sidewalk between MH-5 and Direction: Date: Photo:
MH-6. Northwest 01/07/2016 12
741
Qv'
°✓5C z F..
ELJY E
Page 7 of 15
Kimley ))) Horn CONSTRUCTION OBSERVATION REPORT
Client: Site Location: Project Name:
Barry University 1 11300 NE 2nd Avenue, Miami Shore, FL 33161 Septic to Sewer
Description: Damage to the existing sidewalk between MH-5 and Direction: Date: Photo:
MH-6. Northwest 01/07/2016 13
' ,
,'2 4
w.k
A Y atd� I
v �5'
Description: : Installation of MH-6 and backfilled excavation. Direction: Date: Photo:
Northeast 01/07/2016 14
Page 8 of 15
Kimley ))) Horn CONSTRUCTION OBSERVATION REPORT
Client: Site Location: Project Name:
Barry University 1 11300 NE 2nd Avenue, Miami Shore, FL 33161 Septic to Sewer
Description: Backfilled trench filled between MH-6 and MH-7. Direction: Date: Photo:
North 01/07/2016 15
P
IP
Description: Backfilled trench filled between MH-6 and MH-7. Direction: Date: Photo:
North 01/07/2016 16
I
Page 9 of 15
Kimley ))) HornCONSTRUCTION OBSERVATION REPORT
Client: Site Location: Project Name:
Barry University 11300 NE 2"d Avenue, Miami Shore, FL 33161 Septic to Sewer
Description: MH-7 installed and excavation backfilled. Direction: Date: Photo:
Northwest 01/07/2016 17
Y
t
Description: MH-7 installed and excavation backfilled. Direction: Date: Photo:
North 01/07/2016 18
Jr40,
, z
x;
r
,'.
f
Page 10 of 15
Kimley ))) HornCONSTRUCTION OBSERVATION REPORT
Client: Site Location: Project Name:
Barry University 11300 NE 2nd Avenue, Miami Shore, FL 33161 Septic to Sewer
Description: Sidewalk replacement near MH-3. Direction: Date: Photo:
Northeast 01/07/2016 19
v„
4N
Description: Sidewalk replacement near MH-3. Direction: Date: Photo:
Northeast 01/07/2016 20
low 004,
Ju
v
Page 11 of 15
Kimley ))) HornCONSTRUCTION OBSERVATION REPORT
Client: Site Location: Project Name:
Barry University 11300 NE 2nd Avenue, Miami Shore, FL 33161 Septic to Sewer
Description: Sidewalk replacement just north of MH-4. Direction: Date: Photo:
Northeast 01/07/2016 21
r'
Description: Sidewalk replacement just north of MH-4. Direction: Date: Photo:
Southwest 01/07/2016 22
h
`r
Page 12 of 15
Kimley ))) HornCONSTRUCTION OBSERVATION REPORT
Client: Site Location: Project Name:
Barry University 11300 NE 2"d Avenue, Miami Shore, FL 33161 Septic to Sewer
Description: Excavation and installation of pipe between MH-2 Direction: Date. Photo:
and MH-8. Northeast 01/07/2016 23
x;
Description: Excavation and installation of pipe between MH-2 Direction: Date: Photo:
and MH-8. Excavation of MH-8. Northeast 01/07/2016 24
a
5 Y
f
V:
LLa�
n�
C w
Page 13 of 15
Kimley ))) Horn CONSTRUCTION OBSERVATION REPORT
Client: Site Location: Project Name:
Barry University 1 11300 NE 2nd Avenue, Miami Shore, FL 33161 Septic to Sewer
Description: Excavation and installation of pipe between MH-2 Direction: Date: Photo:
and MH-8. Excavation of MH-8. Southwest 01/07/2016 25
k
3 1
AV
Page 14 of 15
END OF REPORT