Loading...
R-1112-06 RESOLUTION NO. 1112-06 A RESOLUTION OF THE MIAMI SHORES VILLAGE COUNCIL, EXPRESSING OPPOSITION TO FLORIDA POWER AND LIGHT COMPANY'S PLAN FOR THE INSTALLATION OF TRANSMISSION POLES AND LINES THROUGH MIAMI SHORES VILLAGE IN ORDER TO CONNECT THE ARCH CREEK SUBSTATION TO A SUBSTATION LOCATED IN EL PORTAL. WHEREAS, Florida Power & Light (FPL) is looking to install a major new transmission line to run from their substation in the Arch Creek area of North Miami to the substation located in EI Portal; and WHEREAS, the physical size of the poles and transmission lines would dwarf all existing structures and would not be in harmony with the single family residential community that comprises the majority of the Village; and WHEREAS, The Village believes that there are other, more viable routes that could more easily accommodate transmission poles of the required size and would be better suited for the installation than the residential streets of Miami Shores; NOW, THEREFORE, BE IT RESOLVED, by the Miami Shores Village Council, that Section 1. Miami Shores Village strongly opposes the installation of major power poles and transmission lines through its residential community as is currently being proposed. Section 2. Miami Shores Village encourages the exploration of more suitable transmission routes that would not adversely impact the residential properties located within Miami Shores. PASSED AND ADOPTED THIS 21'� day of March , 2006. ATTEST: Al avis, Mayor &Aw 6' " , one Barbara A. Estep, CMC Village Clerk APPROVED AS TO FORM: Richard Sarafan Village Attorney